X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274280807000

Well Details

Well ID: 0274280807000
Loading map...
Location: 00/07-08-027-28W4/0
Location Alias: 00/07-08-27-28 W4M
Location Alias 2: 00/07-08-027-28 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 28
Section: 08
County/Municipality: Rocky View County
Well Name: PW GAS CROSS 7-8-27-28
Operator Name: TAQA North Ltd.
License Number: 0073383
License Date: 1978-12-08
License Status: Abandoned
Spud Date: 1979-01-15
Final Drill Date: 1979-02-18
Well Total Depth: 2660.00 m
Surface Hole Latitude: 51.291622
Surface Hole Longitude: -113.904350

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-08 Obtained License
1979-02-18 Finished Drilling
1979-02-19 Drill Stem Test Performed
1979-02-21 Production Casing Operation Performed
1979-06-01 Perforation Treatment Performed - Jet Perforation
1979-06-01 Well Log Performed
1979-06-02 Perforation Treatment Performed - Jet Perforation
1979-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-11 Well Mode changed to Drilled and Cased
2012-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-10 Plug Back Performed
2012-01-10 Well Log Performed
2012-01-10 Well Mode changed to Abandoned Zone
2012-01-11 Well Log Performed
2012-01-13 Perforation Treatment Performed - Jet Perforation
2012-01-13 Well Log Performed
2012-01-15 Perforation Treatment Performed - Cement Squeeze
2012-01-19 Perforation Treatment Performed - Jet Perforation
2012-01-19 Well Log Performed
2012-01-20 Perforation Treatment Performed - Cement Squeeze
2012-01-22 Perforation Treatment Performed - Jet Perforation
2012-01-25 Perforation Treatment Performed - Jet Perforation
2012-01-25 Well Log Performed
2012-01-31 Perforation Treatment Performed - Cement Squeeze
2012-01-31 Well Log Performed
2012-02-03 Perforation Treatment Performed - Cement Plug
2012-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-09 Perforation Treatment Performed - Jet Perforation
2012-02-09 Plug Back Performed
2012-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-11 Perforation Treatment Performed - Cement Plug
2012-02-11 Perforation Treatment Performed - Cement Squeeze
2012-02-12 Perforation Treatment Performed - Jet Perforation
2012-02-13 Perforation Treatment Performed - Cement Plug
2012-02-13 Perforation Treatment Performed - Cement Squeeze
2012-02-14 Perforation Treatment Performed - Jet Perforation
2012-02-14 Well Log Performed
2012-02-15 Perforation Treatment Performed - Jet Perforation
2012-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-17 Perforation Treatment Performed - Cement Squeeze
2012-02-17 Perforation Treatment Performed - Jet Perforation
2012-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-24 Perforation Treatment Performed - Cement Squeeze
2012-02-24 Perforation Treatment Performed - Jet Perforation
2012-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-04-24 Well Abandoned
2012-04-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-06-01 Perforation 2626.20 2635.50 7
2012-01-22 Perforation 2556.00 2557.00 17
2012-01-25 Perforation 2579.00 2580.00 17
2012-01-31 Cement Squeeze 2579.00 2580.00 0
2012-02-03 Cement Plug 2357.00 2579.00 0
2012-02-09 Packing Device Capped w/Cement 2344.00 2345.00 0
2012-02-09 Packing Device Capped w/Cement 1323.00 1330.00 0
2012-02-09 Perforation 1321.00 1323.00 17
2012-02-09 Perforation 1017.00 1019.00 17
2012-02-11 Cement Squeeze 1321.00 1323.00 0
2012-02-11 Cement Plug 1019.00 1321.00 0
1979-06-02 Perforation 2618.00 2626.20 7
2012-02-11 Cement Squeeze 1017.00 1019.00 0
2012-02-11 Cement Plug 933.00 1017.00 0
2012-02-11 Packing Device Capped w/Cement 895.00 905.00 0
2012-02-12 Perforation 893.00 895.00 17
2012-02-12 Perforation 724.00 726.00 17
2012-02-13 Cement Squeeze 893.00 895.00 0
2012-02-13 Cement Plug 726.00 893.00 0
2012-02-13 Cement Squeeze 724.00 726.00 0
2012-02-13 Cement Plug 619.00 724.00 0
2012-02-14 Perforation 594.00 596.00 17
1979-06-04 Acid Treatment 2618.00 2635.50 0
2012-02-15 Perforation 508.00 510.00 17
2012-02-17 Cement Squeeze 594.00 596.00 0
2012-02-17 Packing Device Capped w/Cement 494.00 591.00 0
2012-02-17 Perforation 485.00 487.00 17
2012-02-23 Packing Device Capped w/Cement 462.00 480.00 0
2012-02-24 Perforation 315.00 316.00 17
2012-02-24 Cement Squeeze 315.00 316.00 0
2012-02-25 Packing Device Capped w/Cement 301.00 310.00 0
1979-06-07 Acid Treatment 2618.00 2635.50 0
2012-01-10 Packing Device Capped w/Cement 2580.00 2595.00 0
2012-01-13 Perforation 1001.00 1003.00 17
2012-01-15 Cement Squeeze 1001.00 1003.00 0
2012-01-19 Perforation 2555.00 2556.00 17
2012-01-20 Cement Squeeze 2555.00 2556.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-24 No Incident Encountered 0.00 0.00

For data sources see[5]

References