X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0284263212004"

m
m
 
Line 192: Line 192:
 
| style="text-align: right;" | 1896.00
 
| style="text-align: right;" | 1896.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
|-
 
| 2002-09-05
 
| Perforation
 
| style="text-align: right;" | 1885.50
 
| style="text-align: right;" | 1887.50
 
| style="text-align: right;" | 17
 
|-
 
| 2002-10-11
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1875.50
 
| style="text-align: right;" | 1883.50
 
| style="text-align: right;" | 0
 
|-
 
| 2002-10-12
 
| Perforation
 
| style="text-align: right;" | 1629.00
 
| style="text-align: right;" | 1636.00
 
| style="text-align: right;" | 17
 
|-
 
| 2002-10-18
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1608.00
 
| style="text-align: right;" | 1614.00
 
| style="text-align: right;" | 0
 
|-
 
| 2003-05-24
 
| Perforation
 
| style="text-align: right;" | 1014.00
 
| style="text-align: right;" | 1017.00
 
| style="text-align: right;" | 7
 
|-
 
| 2003-06-06
 
| Fracture
 
| style="text-align: right;" | 1014.00
 
| style="text-align: right;" | 1017.00
 
| style="text-align: right;" | 0
 
|-
 
| 2003-06-23
 
| Perforation
 
| style="text-align: right;" | 931.00
 
| style="text-align: right;" | 935.00
 
| style="text-align: right;" | 7
 
|-
 
| 2003-06-23
 
| Perforation
 
| style="text-align: right;" | 910.00
 
| style="text-align: right;" | 912.00
 
| style="text-align: right;" | 7
 
 
|-
 
|-
 
| 2005-05-04
 
| 2005-05-04
Line 300: Line 252:
 
| style="text-align: right;" | 558.00
 
| style="text-align: right;" | 558.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 2002-09-05
 +
| Perforation
 +
| style="text-align: right;" | 1885.50
 +
| style="text-align: right;" | 1887.50
 +
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-05-04
 
| 2005-05-04
Line 324: Line 282:
 
| style="text-align: right;" | 692.50
 
| style="text-align: right;" | 692.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 2002-10-11
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1875.50
 +
| style="text-align: right;" | 1883.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-10-12
 +
| Perforation
 +
| style="text-align: right;" | 1629.00
 +
| style="text-align: right;" | 1636.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2002-10-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1608.00
 +
| style="text-align: right;" | 1614.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-05-24
 +
| Perforation
 +
| style="text-align: right;" | 1014.00
 +
| style="text-align: right;" | 1017.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2003-06-06
 +
| Fracture
 +
| style="text-align: right;" | 1014.00
 +
| style="text-align: right;" | 1017.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-06-23
 +
| Perforation
 +
| style="text-align: right;" | 931.00
 +
| style="text-align: right;" | 935.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2003-06-23
 +
| Perforation
 +
| style="text-align: right;" | 910.00
 +
| style="text-align: right;" | 912.00
 +
| style="text-align: right;" | 7
 
|-
 
|-
 
|}
 
|}
Line 398: Line 398:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 01:19, 30 January 2021

Well Details

Well ID: 0284263212004
Loading map...
Location: 00/12-32-028-26W4/4
Location Alias: 00/12-32-28-26 W4M
Location Alias 2: 00/12-32-028-26 W4/04
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 26
Section: 32
County/Municipality: Rocky View County
Well Name: PCE PCR BEISEKER 12-32-28-26
Operator Name: Quicksilver Resources Canada Inc.
License Number: 0267742
License Date: 2002-02-14
License Status: RecCertified
Spud Date: 2002-02-27
Final Drill Date: 2002-03-03
Well Total Depth: 1924.00 m
Surface Hole Latitude: 51.438824
Surface Hole Longitude: -113.636725

For data sources see[1][2]

Well History

Date Event
2002-02-14 Obtained License
2002-02-28 Surface Casing Operation Performed
2002-03-03 Finished Drilling
2002-03-03 Well Log Performed
2002-03-03 Well Mode changed to Drilled and Cased
2002-03-04 Well Log Performed
2002-03-05 Lost Circulation Occurred
2002-03-05 Production Casing Operation Performed
2002-03-05 Rig Released
2002-03-24 Well Log Performed
2002-07-06 Perforation Treatment Performed - Jet Perforation
2002-07-06 Well Log Performed
2002-09-05 Perforation Treatment Performed - Jet Perforation
2002-09-05 Well Log Performed
2002-10-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-11 Plug Back Performed
2002-10-12 Perforation Treatment Performed - Jet Perforation
2002-10-12 Well Log Performed
2002-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-18 Plug Back Performed
2002-10-19 Well Log Performed
2003-05-24 Perforation Treatment Performed - Jet Perforation
2003-06-06 Perforation Treatment Performed - Fractured
2003-06-23 Perforation Treatment Performed - Jet Perforation
2005-05-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-04 Perforation Treatment Performed - Jet Perforation
2005-05-04 Plug Back Performed
2005-05-13 Perforation Treatment Performed - Fractured
2007-06-05 Well Log Performed
2008-01-15 Well Log Performed
2008-08-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-06 Perforation 1893.00 1896.00 20
2005-05-04 Packing Device Capped w/Cement 894.00 902.00 0
2005-05-04 Perforation 691.50 692.50 13
2005-05-04 Perforation 682.10 684.10 13
2005-05-04 Perforation 680.50 681.50 13
2005-05-04 Perforation 669.60 670.60 13
2005-05-04 Perforation 660.00 661.00 13
2005-05-04 Perforation 648.00 649.00 13
2005-05-04 Perforation 633.50 636.50 13
2005-05-04 Perforation 630.70 631.70 13
2005-05-04 Perforation 554.00 558.00 13
2002-09-05 Perforation 1885.50 1887.50 17
2005-05-04 Perforation 535.50 536.50 13
2005-05-04 Perforation 524.60 525.60 13
2005-05-04 Perforation 522.30 523.30 13
2005-05-13 Fracture 522.30 692.50 0
2002-10-11 Packing Device Capped w/Cement 1875.50 1883.50 0
2002-10-12 Perforation 1629.00 1636.00 17
2002-10-18 Packing Device Capped w/Cement 1608.00 1614.00 0
2003-05-24 Perforation 1014.00 1017.00 7
2003-06-06 Fracture 1014.00 1017.00 0
2003-06-23 Perforation 931.00 935.00 7
2003-06-23 Perforation 910.00 912.00 7

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-03-05 Lost Circulation 1460.00 1924.00

For data sources see[5]

References