If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284263212004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.438824,"lon":-113.636725,"icon":""}]} |
Location: 00/12-32-028-26W4/4 | |
Location Alias: 00/12-32-28-26 W4M | |
Location Alias 2: 00/12-32-028-26 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 26 | |
Section: 32 | |
County/Municipality: Rocky View County | |
Well Name: PCE PCR BEISEKER 12-32-28-26 | |
Operator Name: Quicksilver Resources Canada Inc. | |
License Number: 0267742 | |
License Date: 2002-02-14 | |
License Status: RecCertified | |
Spud Date: 2002-02-27 | |
Final Drill Date: 2002-03-03 | |
Well Total Depth: 1924.00 m | |
Surface Hole Latitude: 51.438824 | |
Surface Hole Longitude: -113.636725 |
Date | Event |
---|---|
2002-02-14 | Obtained License |
2002-02-28 | Surface Casing Operation Performed |
2002-03-03 | Finished Drilling |
2002-03-03 | Well Log Performed |
2002-03-03 | Well Mode changed to Drilled and Cased |
2002-03-04 | Well Log Performed |
2002-03-05 | Lost Circulation Occurred |
2002-03-05 | Production Casing Operation Performed |
2002-03-05 | Rig Released |
2002-03-24 | Well Log Performed |
2002-07-06 | Perforation Treatment Performed - Jet Perforation |
2002-07-06 | Well Log Performed |
2002-09-05 | Perforation Treatment Performed - Jet Perforation |
2002-09-05 | Well Log Performed |
2002-10-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-10-11 | Plug Back Performed |
2002-10-12 | Perforation Treatment Performed - Jet Perforation |
2002-10-12 | Well Log Performed |
2002-10-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-10-18 | Plug Back Performed |
2002-10-19 | Well Log Performed |
2003-05-24 | Perforation Treatment Performed - Jet Perforation |
2003-06-06 | Perforation Treatment Performed - Fractured |
2003-06-23 | Perforation Treatment Performed - Jet Perforation |
2005-05-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-05-04 | Perforation Treatment Performed - Jet Perforation |
2005-05-04 | Plug Back Performed |
2005-05-13 | Perforation Treatment Performed - Fractured |
2007-06-05 | Well Log Performed |
2008-01-15 | Well Log Performed |
2008-08-29 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-07-06 | Perforation | 1893.00 | 1896.00 | 20 |
2005-05-04 | Packing Device Capped w/Cement | 894.00 | 902.00 | 0 |
2005-05-04 | Perforation | 691.50 | 692.50 | 13 |
2005-05-04 | Perforation | 682.10 | 684.10 | 13 |
2005-05-04 | Perforation | 680.50 | 681.50 | 13 |
2005-05-04 | Perforation | 669.60 | 670.60 | 13 |
2005-05-04 | Perforation | 660.00 | 661.00 | 13 |
2005-05-04 | Perforation | 648.00 | 649.00 | 13 |
2005-05-04 | Perforation | 633.50 | 636.50 | 13 |
2005-05-04 | Perforation | 630.70 | 631.70 | 13 |
2005-05-04 | Perforation | 554.00 | 558.00 | 13 |
2002-09-05 | Perforation | 1885.50 | 1887.50 | 17 |
2005-05-04 | Perforation | 535.50 | 536.50 | 13 |
2005-05-04 | Perforation | 524.60 | 525.60 | 13 |
2005-05-04 | Perforation | 522.30 | 523.30 | 13 |
2005-05-13 | Fracture | 522.30 | 692.50 | 0 |
2002-10-11 | Packing Device Capped w/Cement | 1875.50 | 1883.50 | 0 |
2002-10-12 | Perforation | 1629.00 | 1636.00 | 17 |
2002-10-18 | Packing Device Capped w/Cement | 1608.00 | 1614.00 | 0 |
2003-05-24 | Perforation | 1014.00 | 1017.00 | 7 |
2003-06-06 | Fracture | 1014.00 | 1017.00 | 0 |
2003-06-23 | Perforation | 931.00 | 935.00 | 7 |
2003-06-23 | Perforation | 910.00 | 912.00 | 7 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2002-03-05 | Lost Circulation | 1460.00 | 1924.00 |
For data sources see[5]