If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-131-20231 | | Well ID: 37-131-20231 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.632113, -76.063419 | width=100% | height=100% }} |
|- | |- | ||
| County: [[Wyoming County, Pennsylvania|Wyoming]] | | County: [[Wyoming County, Pennsylvania|Wyoming]] | ||
Line 9: | Line 9: | ||
| Municipality: [[Meshoppen Township, Wyoming County, Pennsylvania|Meshoppen Township]] | | Municipality: [[Meshoppen Township, Wyoming County, Pennsylvania|Meshoppen Township]] | ||
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[CHESAPEAKE APPALACHIA LLC]] |
|- | |- | ||
− | | Well Pad ID: [[144560]] | + | | Well Pad ID: [[144560|144560]] |
|- | |- | ||
| Farm/Lease Name: SMURKOSKI N WYO 2H | | Farm/Lease Name: SMURKOSKI N WYO 2H | ||
Line 25: | Line 25: | ||
| Horizontal: Yes | | Horizontal: Yes | ||
|- | |- | ||
− | | | + | | Well Status: ACTIVE |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
| Latitude: 41.632113 | | Latitude: 41.632113 | ||
|- | |- | ||
| Longitude: -76.063419 | | Longitude: -76.063419 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
Line 105: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2011-2 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
|- | |- | ||
| 2012-2 | | 2012-2 | ||
Line 115: | Line 71: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2013-1 |
+ | | style="text-align:right;" | 805851.0 | ||
+ | | style="text-align:right;" | 181.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | style="text-align:right;" | 1314935.0 | ||
+ | | style="text-align:right;" | 141.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | style="text-align:right;" | 1376935.0 | ||
+ | | style="text-align:right;" | 136.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | style="text-align:right;" | 1365573.0 | ||
+ | | style="text-align:right;" | 160.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-02 | ||
+ | | style="text-align:right;" | 119848.0 | ||
+ | | style="text-align:right;" | 19.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 124: | Line 116: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2015-01 |
+ | | style="text-align:right;" | 221889.0 | ||
+ | | style="text-align:right;" | 31.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-03 | ||
+ | | style="text-align:right;" | 139419.0 | ||
+ | | style="text-align:right;" | 20.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 133: | Line 134: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 144: | Line 151: | ||
!scope="col" | FACILITY CITY | !scope="col" | FACILITY CITY | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 1.0 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | THR029 | ||
+ | | TUNNELL HILL RECLAMATION LANDFILL | ||
+ | | NEWLEXINGTON | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | DRILLING FLUID WASTE | ||
+ | | style="text-align:right;" | 419.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR HYDRAULIC FRACTURING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 212.5 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR HYDRAULIC FRACTURING | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| 2012-2 | | 2012-2 | ||
| PRODUCED FLUID | | PRODUCED FLUID | ||
− | | style="text-align:right;" | | + | | style="text-align:right;" | 1.0 |
| Bbl | | Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 156: | Line 196: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2013-1 |
− | | | + | | PRODUCED FLUID |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 407.1 |
| Bbl | | Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
Line 167: | Line 207: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2013-2 |
+ | | FLOWBACK FRACTURING SAND | ||
+ | | style="text-align:right;" | 12.0 | ||
+ | | Tons | ||
+ | | LANDFILL | ||
+ | | THR029 | ||
+ | | TUNNELL HILL RECLAMATION LANDFILL | ||
+ | | NEWLEXINGTON | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 498.0 | ||
+ | | Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NC008 | ||
+ | | SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY | ||
+ | | | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 210.0 | ||
+ | | Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NC007 | ||
+ | | HERSHBERGER TEMP CENTRALIZED FLUID PROC FACILITY | ||
+ | | | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 6.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 110.0 | ||
+ | | Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NC008 | ||
+ | | SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY | ||
+ | | | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 27.0 | ||
+ | | Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123NC008 | ||
+ | | SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY | ||
+ | | | ||
+ | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 356.27 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
| PRODUCED FLUID | | PRODUCED FLUID | ||
− | | style="text-align:right;" | | + | | style="text-align:right;" | 165.88 |
| Bbl | | Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
− | | REUSE | + | | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY |
| | | | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
− | + | | title = Oil and Gas Historical Waste Report | |
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
+ | == Inspection Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | INSPECTION ID | ||
+ | !scope="col" | DATE | ||
+ | !scope="col" | DESCRIPTION | ||
+ | !scope="col" | COMMENT | ||
+ | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
+ | |- | ||
+ | | 2044436 | ||
+ | | 2012-02-22 | ||
+ | | No Violations Noted | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2046441 | ||
+ | | 2012-02-22 | ||
+ | | No Violations Noted | ||
+ | | United Drilling on site working on rathole. Permits are on site sign. Drillers logs were turned in to Jerry Bright yesterday when 20" was grouted & done. | ||
+ | 80 - 85' rock NO WATER | ||
+ | 20" @ 85' | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2057193 | ||
+ | | 2012-03-30 | ||
+ | | No Violations Noted | ||
+ | | NOMAC 7, Comp. Man - Mike Hancock, @ 920', checked drillers log | ||
+ | Spud unit - dry hole | ||
+ | 20 " @ 85' w/ 242 sx Cl A, United Drilling 2/21/12 | ||
+ | 13 3/8" @ 920' w/ 873 sx, Cl A, 15.6 ppg, w/ 55 bbls of 15.5 ppg back to surf. | ||
+ | Nippling up and testing BOP | ||
+ | drilled surf on fluid, now mist drilling intermed. | ||
+ | Checked cellar and cellar on S WYO 2H - good | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2060072 | ||
+ | | 2012-04-12 | ||
+ | | No Violations Noted | ||
+ | | Nomac 7, Comp. man- Roy Funck | ||
+ | checked drillers log, @ TD = 11965' | ||
+ | 1530 - 1590' SS 130 Units of gas | ||
+ | 5388' Tully LS | ||
+ | 5538' Hamilton Sh 85 u of gas | ||
+ | 7220' U Marc 577 u gas | ||
+ | 7480' Ch Val LS 42 u gas | ||
+ | 7518' L Marc 109 u gas | ||
+ | 9 5/8" @ 2451' w/ 995 sx, 15.6 ppg, Cl A w/ additives, 60 bbls to surf of 15.3 ppg | ||
+ | Inflatable pkr @ 1379' (top) | ||
+ | laying down drill pipe, will run and cement 5 1/2" csg tonight and tomorrow. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2122877 | ||
+ | | 2012-12-12 | ||
+ | | No Violations Noted | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2207680 | ||
+ | | 2013-08-22 | ||
+ | | No Violations Noted | ||
+ | | Arrived at the site at 13:15. I was accompanied by Cory Snyder, Field Representative of Chesapeake Energy during the inspection. Tetra Technologies was in the process of breaking down the frac equipment. The frac job for the 2H well has just been completed relatively recently. The completions has been mobilized to the Welles 5H in Bradford County as this is the next scheduled frac job. The brine transfer lines are contained with a (30) mil liner. There were no elevated conductivity readings of concern in any water on and off secondary containment. The PPC plan in the mailbox is dated October 2012. I departed from the site at 14:15. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Inspection Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-131-20231 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.632113,"lon":-76.063419,"icon":""}]} |
County: Wyoming | |
Municipality: Meshoppen Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 144560 | |
Farm/Lease Name: SMURKOSKI N WYO 2H | |
First Permit Date: 2011-12-20 | |
Last Permit Date: 2011-12-20 | |
Spud Date: 2012-02-20 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 41.632113 | |
Longitude: -76.063419 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 138234.0 | 24.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 805851.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 1314935.0 | 141.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 1376935.0 | 136.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 1365573.0 | 160.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 119848.0 | 19.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 221889.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 139419.0 | 20.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-1 | DRILL CUTTINGS | 1.0 | Tons | LANDFILL | THR029 | TUNNELL HILL RECLAMATION LANDFILL | NEWLEXINGTON | OH |
2012-1 | DRILLING FLUID WASTE | 419.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-1 | PRODUCED FLUID | 212.5 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | PRODUCED FLUID | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2013-1 | PRODUCED FLUID | 407.1 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2013-2 | FLOWBACK FRACTURING SAND | 12.0 | Tons | LANDFILL | THR029 | TUNNELL HILL RECLAMATION LANDFILL | NEWLEXINGTON | OH |
2013-2 | FRACING FLUID WASTE | 498.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 | SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY | PA | |
2013-2 | PRODUCED FLUID | 210.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC007 | HERSHBERGER TEMP CENTRALIZED FLUID PROC FACILITY | PA | |
2013-2 | PRODUCED FLUID | 6.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2013-2 | PRODUCED FLUID | 110.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 | SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY | PA | |
2014-1 | FRACING FLUID WASTE | 27.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 | SHARER TEMP CENTRALIZED FLUIDS PROCESSING FACILITY | PA | |
2014-1 | PRODUCED FLUID | 356.27 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | PRODUCED FLUID | 165.88 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2044436 | 2012-02-22 | No Violations Noted | ||||
2046441 | 2012-02-22 | No Violations Noted | United Drilling on site working on rathole. Permits are on site sign. Drillers logs were turned in to Jerry Bright yesterday when 20" was grouted & done.
80 - 85' rock NO WATER 20" @ 85' |
|||
2057193 | 2012-03-30 | No Violations Noted | NOMAC 7, Comp. Man - Mike Hancock, @ 920', checked drillers log
Spud unit - dry hole 20 " @ 85' w/ 242 sx Cl A, United Drilling 2/21/12 13 3/8" @ 920' w/ 873 sx, Cl A, 15.6 ppg, w/ 55 bbls of 15.5 ppg back to surf. Nippling up and testing BOP drilled surf on fluid, now mist drilling intermed. Checked cellar and cellar on S WYO 2H - good |
|||
2060072 | 2012-04-12 | No Violations Noted | Nomac 7, Comp. man- Roy Funck
checked drillers log, @ TD = 11965' 1530 - 1590' SS 130 Units of gas 5388' Tully LS 5538' Hamilton Sh 85 u of gas 7220' U Marc 577 u gas 7480' Ch Val LS 42 u gas 7518' L Marc 109 u gas 9 5/8" @ 2451' w/ 995 sx, 15.6 ppg, Cl A w/ additives, 60 bbls to surf of 15.3 ppg Inflatable pkr @ 1379' (top) laying down drill pipe, will run and cement 5 1/2" csg tonight and tomorrow. |
|||
2122877 | 2012-12-12 | No Violations Noted | ||||
2207680 | 2013-08-22 | No Violations Noted | Arrived at the site at 13:15. I was accompanied by Cory Snyder, Field Representative of Chesapeake Energy during the inspection. Tetra Technologies was in the process of breaking down the frac equipment. The frac job for the 2H well has just been completed relatively recently. The completions has been mobilized to the Welles 5H in Bradford County as this is the next scheduled frac job. The brine transfer lines are contained with a (30) mil liner. There were no elevated conductivity readings of concern in any water on and off secondary containment. The PPC plan in the mailbox is dated October 2012. I departed from the site at 14:15. |
For data sources see[3]