X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22085"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22085
 
| Well ID: 37-003-22085
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.223938, -79.890647 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.223938, -79.890647 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Allegheny County, Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Forward Township, Allegheny County, Pennsylvania|Forward Township]]
 
|-
 
|-
 
| Operator Name: [[KRIEBEL MINERALS INC]]
 
| Operator Name: [[KRIEBEL MINERALS INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: WALL M 003
 
|-
 
|-
 
| First Permit Date: 2009-08-25
 
| First Permit Date: 2009-08-25
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.223938
 
| Latitude: 40.223938
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2010-0
| style="text-align:right;" | 1625.0
+
| style="text-align:right;" | 2307.0
 +
| style="text-align:right;" | 214.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 2388.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 52: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2011-0
+
| 2013-0
| style="text-align:right;" | 2388.0
+
| style="text-align:right;" | 1625.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 80:
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2014-0
| style="text-align:right;" | 2307.0
+
| style="text-align:right;" | 1040.0
| style="text-align:right;" | 214.0
+
| style="text-align:right;" | 332.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 70: Line 89:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 82: Line 107:
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 
|-
 
|-
| 2012-0
+
| 2010-0
| PRODUCED FLUID
+
| DRILLING FLUID WASTE
| style="text-align:right;" | 40.0
+
| style="text-align:right;" | 550.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
| TUNNELTON LIQUIDS TREATMENT FACILITY
 +
| SALTSBURG
 +
| PA
 +
|-
 +
|-
 +
| 2010-0
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 990.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095443
+
| PA0091472
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
| CREEKSIDE
+
| SALTSBURG
 
| PA
 
| PA
 
|-
 
|-
Line 99: Line 135:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
Line 110: Line 146:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
| PA
 
|-
 
|-
 
| 2010-0
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 550.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
|-
 
|-
 
| 2010-0
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 990.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
 
| PA
 
| PA
 
|-
 
|-
Line 143: Line 157:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
Line 154: Line 168:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
Line 165: Line 179:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 177: Line 197:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1869577
 
| 1869577
Line 182: Line 204:
 
| No Violations Noted
 
| No Violations Noted
 
| SITE BUILT. PIT DUG, NO RIG.
 
| SITE BUILT. PIT DUG, NO RIG.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 189: Line 213:
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING COMPLETE. FALCON RIG 8 IS GONE. DOZER IS WORKING ON SITE.
 
| DRILLING COMPLETE. FALCON RIG 8 IS GONE. DOZER IS WORKING ON SITE.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 196: Line 222:
 
| No Violations Noted
 
| No Violations Noted
 
| On April 23, 2010 I visited this site as a routine inspection.  Drilling was completed but the well was not in production.  The well site appeared to be in compliance.  A site ID sign and E&S plan were posted at site.  The access road was in good condition.  E&S controls were still in place.  The site was recently seeded and mulched.  There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should inspection the E&S controls routinely and after each significant rainfall event until the site is completely restored and 70% uniform vegetative cover is established.
 
| On April 23, 2010 I visited this site as a routine inspection.  Drilling was completed but the well was not in production.  The well site appeared to be in compliance.  A site ID sign and E&S plan were posted at site.  The access road was in good condition.  E&S controls were still in place.  The site was recently seeded and mulched.  There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should inspection the E&S controls routinely and after each significant rainfall event until the site is completely restored and 70% uniform vegetative cover is established.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 203: Line 231:
 
| No Violations Noted
 
| No Violations Noted
 
| WELL COMPLETE. SITE IS RESTORED. ACCESS IS STONED.
 
| WELL COMPLETE. SITE IS RESTORED. ACCESS IS STONED.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 210: Line 240:
 
| No Violations Noted
 
| No Violations Noted
 
| GAS WELL SITE IS RESTORED. WELL IS EQUIPTED WITH A DUMP AND BRINE TANK. ACCESS IS STONED.
 
| GAS WELL SITE IS RESTORED. WELL IS EQUIPTED WITH A DUMP AND BRINE TANK. ACCESS IS STONED.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 20:01, 25 June 2015

Well Details

Well ID: 37-003-22085
Loading map...
County: Allegheny
Municipality: Forward Township
Operator Name: KRIEBEL MINERALS INC
Well Pad ID:
Farm/Lease Name: WALL M 003
First Permit Date: 2009-08-25
Last Permit Date: 2009-08-25
Spud Date: 2010-03-11
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.223938
Longitude: -79.890647

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 2307.0 214.0 0.0 0.0 0.0 0.0
2011-0 2388.0 334.0 0.0 0.0 0.0 0.0
2012-0 1804.0 335.0 0.0 0.0 0.0 0.0
2013-0 1625.0 334.0 0.0 0.0 0.0 0.0
2014-0 1040.0 332.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 DRILLING FLUID WASTE 550.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-0 FRACING FLUID WASTE 990.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-0 PRODUCED FLUID 30.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2010-0 PRODUCED FLUID 20.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-0 PRODUCED FLUID 30.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2011-0 PRODUCED FLUID 20.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2012-0 PRODUCED FLUID 40.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1869577 2010-03-03 No Violations Noted SITE BUILT. PIT DUG, NO RIG.
1872010 2010-03-22 No Violations Noted DRILLING COMPLETE. FALCON RIG 8 IS GONE. DOZER IS WORKING ON SITE.
1879520 2010-04-23 No Violations Noted On April 23, 2010 I visited this site as a routine inspection. Drilling was completed but the well was not in production. The well site appeared to be in compliance. A site ID sign and E&S plan were posted at site. The access road was in good condition. E&S controls were still in place. The site was recently seeded and mulched. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should inspection the E&S controls routinely and after each significant rainfall event until the site is completely restored and 70% uniform vegetative cover is established.
1913093 2010-07-22 No Violations Noted WELL COMPLETE. SITE IS RESTORED. ACCESS IS STONED.
1954012 2011-01-07 No Violations Noted GAS WELL SITE IS RESTORED. WELL IS EQUIPTED WITH A DUMP AND BRINE TANK. ACCESS IS STONED.

For data sources see[3]

References