37-003-22085

Well Details

Well ID: 37-003-22085
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Forward Township
Operator Name: KRIEBEL MINERALS INC
Well Pad ID:
Farm/Lease Name: WALL M 003
License Status:
Spud Date:
Permit Date: 2009-08-25
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.223939
Longitude: -79.890647

For data sources see[1][2][3]

Well History

Date Event
2009-08-25 New Permit Application
2010-03-11 Performed Spud Operation
2010-03-18 Drilling Completion
2010-03-23 Perforation
2011-08-15 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 KRIEBEL MINERALS INC 2,307.00 214 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 2,388.00 334 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 1,804.00 335 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 1,625.00 334 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 1,040.00 332 0.00 0 0.00 0
2015 KRIEBEL MINERALS INC 953.00 324 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 1,491.00 324 0.00 0 0.00 0
2017 KRIEBEL MINERALS INC 1,587.00 324 0.00 0 0.00 0
2018 KRIEBEL MINERALS INC 1,581.00 334 0.00 0 0.00 0
2019 KRIEBEL MINERALS INC 1,664.00 331 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 KRIEBEL MINERALS INC Produced Fluid 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 KRIEBEL MINERALS INC Fracing Fluid Waste 990.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 KRIEBEL MINERALS INC Produced Fluid 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 KRIEBEL MINERALS INC Drilling Fluid Waste 550.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 KRIEBEL MINERALS INC Produced Fluid 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 KRIEBEL MINERALS INC Produced Fluid 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 KRIEBEL MINERALS INC Produced Fluid 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2015 KRIEBEL MINERALS INC Produced Fluid 25 Bbl CENT WASTE TRT FAC NPDES PA0095273
2015 KRIEBEL MINERALS INC Produced Fluid 25.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2017 KRIEBEL MINERALS INC Produced Fluid 35.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2019 KRIEBEL MINERALS INC Produced Fluid 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1869577 Primary Facility 2010-03-03 Drilling/Alteration No Violations Noted SITE BUILT. PIT DUG, NO RIG.
1872010 Primary Facility 2010-03-22 Drilling/Alteration No Violations Noted DRILLING COMPLETE. FALCON RIG 8 IS GONE. DOZER IS WORKING ON SITE.
1879520 Primary Facility 2010-04-23 Routine/Complete Inspection No Violations Noted On April 23, 2010 I visited this site as a routine inspection. Drilling was completed but the well was not in production. The well site appeared to be in compliance. A site ID sign and E&S plan were posted at site. The access road was in good condition. E&S controls were still in place. The site was recently seeded and mulched. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should inspection the E&S controls routinely and after each significant rainfall event until the site is completely restored and 70% uniform vegetative cover is established.
1913093 Primary Facility 2010-07-22 Routine/Complete Inspection No Violations Noted WELL COMPLETE. SITE IS RESTORED. ACCESS IS STONED.
1954012 Primary Facility 2011-01-07 Routine/Complete Inspection No Violations Noted GAS WELL SITE IS RESTORED. WELL IS EQUIPTED WITH A DUMP AND BRINE TANK. ACCESS IS STONED.
2672102 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road.

For data sources see[7]

References