X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-021-21141"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-021-21141
 
| Well ID: 37-021-21141
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.62012, -78.566178 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.62012, -78.566178 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Cambria County, Pennsylvania|Cambria]]
 +
|-
 +
| Municipality: [[Clearfield Township, Cambria County, Pennsylvania|Clearfield Township]]
 
|-
 
|-
 
| Operator Name: [[STEPHENSON GROUP NATURAL GAS CO]]
 
| Operator Name: [[STEPHENSON GROUP NATURAL GAS CO]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: BURGOON RUN 1-1
 
|-
 
|-
 
| First Permit Date: 2009-09-10
 
| First Permit Date: 2009-09-10
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.62012
 
| Latitude: 40.62012
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2012-0
+
| 2010-0
| style="text-align:right;" | 361.0
+
| style="text-align:right;" | 0.0
| style="text-align:right;" | 365.0
+
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 52: Line 62:
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2012-0
| style="text-align:right;" | 0.0
+
| style="text-align:right;" | 361.0
| style="text-align:right;" | 0.0
+
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 71:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 79: Line 95:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
| JOSEPHINE
 
| PA
 
|-
 
|-
 
| 2012-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 90.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 102: Line 113:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1884716
 
| 1884716
 
| 2010-05-11
 
| 2010-05-11
 
| No Violations Noted
 
| No Violations Noted
| According to well records, spud called on May 7, 2010 for May 10, 2010 spud date.  Stephenson contracted Whipstock to drill conservation well to a depth of 9800 ft.  Well sign and E&S plan present at the site.  E&S controls were present on the down gradient side of site with filter fencing.  Drilling pit aligned with 30 mil plastic.  No freeboard issues.  No signs of leakage of gas around wellhead.  At the time of inspection, no E&S issues and no IW issues.  Current drilling status was completed cementing of 11 3/4¿ pipe 250 sks with 3 % CASCL2.  Pipe set at 421.45 ft.  Conductor pipe set at 36 ft.  Permit and drillers log were present at the site along with receipts of cement slips showing  16:30 hrs of completion of cement.  Whipstock was not drilling at the time and was allowing the cement to set. No circulation or cement return was noted on cement slip.  Stratigraphy log showed ss, sh, limestone.   
+
| According to well records, spud called on May 7, 2010 for May 10, 2010 spud date.  Stephenson contracted Whipstock to drill conservation well to a depth of 9800 ft.  Well sign and E&S plan present at the site.  E&S controls were present on the down gradient side of site with filter fencing.  Drilling pit aligned with 30 mil plastic.  No freeboard issues.  No signs of leakage of gas around wellhead.  At the time of inspection, no E&S issues and no IW issues.  Current drilling status was completed cementing of 11 3/4﾿ pipe 250 sks with 3 % CASCL2.  Pipe set at 421.45 ft.  Conductor pipe set at 36 ft.  Permit and drillers log were present at the site along with receipts of cement slips showing  16:30 hrs of completion of cement.  Whipstock was not drilling at the time and was allowing the cement to set. No circulation or cement return was noted on cement slip.  Stratigraphy log showed ss, sh, limestone.   
  
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 115: Line 130:
 
| 2010-05-19
 
| 2010-05-19
 
| No Violations Noted
 
| No Violations Noted
| According to well records, spud called on May 7, 2010 for May 10, 2010 spud date.  Stephenson contracted Whipstock to drill conservation well to a depth of 9800 ft.  Well sign and E&S plan present at the site.  E&S controls were present on the down gradient side of site with filter fencing.  Drilling pit aligned with 30 mil plastic.  No freeboard issues.  No signs of leakage of gas around wellhead.  At the time of inspection, no E&S issues and no IW issues.  Current drilling status was completed cementing of 8 5/8¿ pipe 485 sks with 3 % CASCL2.  Pipe set at 1602 ft.  Cement return of 24 bbl.  Permit and drillers log were present at the site along with no receipts of cement slips.  Whipstock was at 4655 ft.  7.875 ¿ hole was going to 9290 depth.  Stratigraphy log showed ss, and  sh.  Water pond was added to site since last visit on May 11th located topographic down gradient of mud and drilling pits.  Plastic was being held by excavator and needed support
+
| According to well records, spud called on May 7, 2010 for May 10, 2010 spud date.  Stephenson contracted Whipstock to drill conservation well to a depth of 9800 ft.  Well sign and E&S plan present at the site.  E&S controls were present on the down gradient side of site with filter fencing.  Drilling pit aligned with 30 mil plastic.  No freeboard issues.  No signs of leakage of gas around wellhead.  At the time of inspection, no E&S issues and no IW issues.  Current drilling status was completed cementing of 8 5/8﾿ pipe 485 sks with 3 % CASCL2.  Pipe set at 1602 ft.  Cement return of 24 bbl.  Permit and drillers log were present at the site along with no receipts of cement slips.  Whipstock was at 4655 ft.  7.875 ﾿ hole was going to 9290 depth.  Stratigraphy log showed ss, and  sh.  Water pond was added to site since last visit on May 11th located topographic down gradient of mud and drilling pits.  Plastic was being held by excavator and needed support
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 123: Line 140:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, rig was located onsite and well was being drilled. Site was properly signed with E&S plan at entrance. It is recommended that operator include a more detailed E&S plan map for future sites, major modifications also need to be approved by the dept.  No accelerated E&S issues were noted at the time of inspection in relationship to well site or access road but,  is recommend additional access road bmps be installed & additional rock be added due to the steep nature of the roadway; runoff is a potential concern Observed the proper installation functioning of filter fabric fence below grade of well site.  It is recommended that the soil pile either be seeded or additional bmps are installed surrounding the pile to minimize E&S. Four below grade pits were located onsite freeboard levels ok, it is recommended that operator continue to monitor and maintain the required 2ft of lined freeboard and ensure that all pit liners are properly secured with backfill or stakes. Noted: water pit was temporarily secured with heavy equipment.
 
| At the time of inspection, rig was located onsite and well was being drilled. Site was properly signed with E&S plan at entrance. It is recommended that operator include a more detailed E&S plan map for future sites, major modifications also need to be approved by the dept.  No accelerated E&S issues were noted at the time of inspection in relationship to well site or access road but,  is recommend additional access road bmps be installed & additional rock be added due to the steep nature of the roadway; runoff is a potential concern Observed the proper installation functioning of filter fabric fence below grade of well site.  It is recommended that the soil pile either be seeded or additional bmps are installed surrounding the pile to minimize E&S. Four below grade pits were located onsite freeboard levels ok, it is recommended that operator continue to monitor and maintain the required 2ft of lined freeboard and ensure that all pit liners are properly secured with backfill or stakes. Noted: water pit was temporarily secured with heavy equipment.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 130: Line 149:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, roadways (intersection of Glendale Lake Rd and ST Augustine Rd) leading to/from well site were muddy. Spoke with Darryl of Woodstock while onsite, who was going to skim road with skid loader to remove mud, which was underway prior to dept leaving site. The dept recommended that a broom truck also be utilized to clean the roadways. A follow up inspection will be completed to ensure compliance. Once at the site, access road entrance was not properly rocked and was muddy. Rig was no longer onsite, well drilled not yet set for production. Site did not exhibit any accelerated erosion or sedimentation issues.
 
| At the time of inspection, roadways (intersection of Glendale Lake Rd and ST Augustine Rd) leading to/from well site were muddy. Spoke with Darryl of Woodstock while onsite, who was going to skim road with skid loader to remove mud, which was underway prior to dept leaving site. The dept recommended that a broom truck also be utilized to clean the roadways. A follow up inspection will be completed to ensure compliance. Once at the site, access road entrance was not properly rocked and was muddy. Rig was no longer onsite, well drilled not yet set for production. Site did not exhibit any accelerated erosion or sedimentation issues.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 136: Line 157:
 
| 2010-06-03
 
| 2010-06-03
 
| No Violations Noted
 
| No Violations Noted
| This was a follow up inspection to a complaint inspection performed on Tues June 1, 2010 for muddy roadways coming and out of the well site. Upon inspection, noted that Glendale Lake Road and St. Augustine Road had been successfully cleaned. Appears that all mud had been removed and roadways were swept.  Operator complied with the department¿s requests in an efficient and courteous manor. No accelerated E&S issues were observed. It is recommended that the operator continue to maintain the access road, as well as all roadways leading to the well during all phases of construction in order to prevent such an event from occurring in the future.
+
| This was a follow up inspection to a complaint inspection performed on Tues June 1, 2010 for muddy roadways coming and out of the well site. Upon inspection, noted that Glendale Lake Road and St. Augustine Road had been successfully cleaned. Appears that all mud had been removed and roadways were swept.  Operator complied with the department﾿s requests in an efficient and courteous manor. No accelerated E&S issues were observed. It is recommended that the operator continue to maintain the access road, as well as all roadways leading to the well during all phases of construction in order to prevent such an event from occurring in the future.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 143: Line 166:
 
| 2010-10-07
 
| 2010-10-07
 
| No Violations Noted
 
| No Violations Noted
| At the time of this inspection, well drilled, not yet equipped for production. Site properly signed with ES plan available for review. All pits have been removed and site has been regarded and seeded and mulched. Growth is exhibited, but 70% uniform coverage has not yet been sustained. Filter fence installed and functioning properly. No accelerated erosion or sedimentation issues observed. Access road adequately rocked and pad size effectively reduced to minimize final area of disturbance. Until final restoration measures have been completed and >70%unfiorm growth is established operator should continue to monitor all bmp¿s.
+
| At the time of this inspection, well drilled, not yet equipped for production. Site properly signed with ES plan available for review. All pits have been removed and site has been regarded and seeded and mulched. Growth is exhibited, but 70% uniform coverage has not yet been sustained. Filter fence installed and functioning properly. No accelerated erosion or sedimentation issues observed. Access road adequately rocked and pad size effectively reduced to minimize final area of disturbance. Until final restoration measures have been completed and >70%unfiorm growth is established operator should continue to monitor all bmp﾿s.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 150: Line 175:
 
| 2011-03-22
 
| 2011-03-22
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, well drilled not yet in production. Site ID sign present. Well completed 05/23/10. Site has been re-graded, pits removed. Site appears adequately restored with min 70% permanent vegetative cover, although reseeding is recommended to ensure all areas exhibit a uniform coverage of growth; no accelerated erosion or sedimentation issues noted.  Temporary bmp¿s are to be removed upon final restoration. Access road stable.
+
| At the time of inspection, well drilled not yet in production. Site ID sign present. Well completed 05/23/10. Site has been re-graded, pits removed. Site appears adequately restored with min 70% permanent vegetative cover, although reseeding is recommended to ensure all areas exhibit a uniform coverage of growth; no accelerated erosion or sedimentation issues noted.  Temporary bmp﾿s are to be removed upon final restoration. Access road stable.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 158: Line 185:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, well drilled. Drilling completed 5/23/10. Site ID sign present, although well tag illegible--recommend operator replace.  Based on disturbed earth, appears pipleine may have been recently installed. Areas have beeen reseeded mulched. Well site uniformly restored; therefore, operator can remove filfter fence installed down gradient from pad. Access road stable and adequately rocked. No accelerated erosion or sedimention issues noted. Orange security fence located around well head. No violations noted at the time of this inspection.
 
| At the time of inspection, well drilled. Drilling completed 5/23/10. Site ID sign present, although well tag illegible--recommend operator replace.  Based on disturbed earth, appears pipleine may have been recently installed. Areas have beeen reseeded mulched. Well site uniformly restored; therefore, operator can remove filfter fence installed down gradient from pad. Access road stable and adequately rocked. No accelerated erosion or sedimention issues noted. Orange security fence located around well head. No violations noted at the time of this inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 168: Line 197:
  
  
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 173: Line 204:
 
| 2138420
 
| 2138420
 
| 2013-02-07
 
| 2013-02-07
| Cambria
 
| Clearfield Twp
 
 
| No Violations Noted
 
| No Violations Noted
 +
| At time of inspection, well equipped for production. Orange security fence located around well head. Well tag present, in need of update. Department recommends that Operator ensures tag is legible.
 +
Permanent stabilization achieved; therefore, Operator can remove filter fence located down gradient from well head. Access road stable. No E&S issues observed in relation to well site or access road. Department recommends Operator continue to monitor and maintain well site and access road as necessary.
 +
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2349910
 +
| 2015-03-04
 +
| No Violations Noted
 +
| At time of inspection
 +
|
 +
|
 +
|
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 04:15, 26 June 2015

Well Details

Well ID: 37-021-21141
Loading map...
County: Cambria
Municipality: Clearfield Township
Operator Name: STEPHENSON GROUP NATURAL GAS CO
Well Pad ID:
Farm/Lease Name: BURGOON RUN 1-1
First Permit Date: 2009-09-10
Last Permit Date: 2009-09-10
Spud Date: 2010-05-10
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.62012
Longitude: -78.566178

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 0.0 0.0 0.0 0.0 0.0 0.0
2011-0 9.0 1.0 0.0 0.0 0.0 0.0
2012-0 361.0 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 90.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1884716 2010-05-11 No Violations Noted According to well records, spud called on May 7, 2010 for May 10, 2010 spud date. Stephenson contracted Whipstock to drill conservation well to a depth of 9800 ft. Well sign and E&S plan present at the site. E&S controls were present on the down gradient side of site with filter fencing. Drilling pit aligned with 30 mil plastic. No freeboard issues. No signs of leakage of gas around wellhead. At the time of inspection, no E&S issues and no IW issues. Current drilling status was completed cementing of 11 3/4﾿ pipe 250 sks with 3 % CASCL2. Pipe set at 421.45 ft. Conductor pipe set at 36 ft. Permit and drillers log were present at the site along with receipts of cement slips showing 16:30 hrs of completion of cement. Whipstock was not drilling at the time and was allowing the cement to set. No circulation or cement return was noted on cement slip. Stratigraphy log showed ss, sh, limestone.


1885812 2010-05-19 No Violations Noted According to well records, spud called on May 7, 2010 for May 10, 2010 spud date. Stephenson contracted Whipstock to drill conservation well to a depth of 9800 ft. Well sign and E&S plan present at the site. E&S controls were present on the down gradient side of site with filter fencing. Drilling pit aligned with 30 mil plastic. No freeboard issues. No signs of leakage of gas around wellhead. At the time of inspection, no E&S issues and no IW issues. Current drilling status was completed cementing of 8 5/8﾿ pipe 485 sks with 3 % CASCL2. Pipe set at 1602 ft. Cement return of 24 bbl. Permit and drillers log were present at the site along with no receipts of cement slips. Whipstock was at 4655 ft. 7.875 ﾿ hole was going to 9290 depth. Stratigraphy log showed ss, and sh. Water pond was added to site since last visit on May 11th located topographic down gradient of mud and drilling pits. Plastic was being held by excavator and needed support
1888013 2010-05-20 No Violations Noted At the time of inspection, rig was located onsite and well was being drilled. Site was properly signed with E&S plan at entrance. It is recommended that operator include a more detailed E&S plan map for future sites, major modifications also need to be approved by the dept. No accelerated E&S issues were noted at the time of inspection in relationship to well site or access road but, is recommend additional access road bmps be installed & additional rock be added due to the steep nature of the roadway; runoff is a potential concern Observed the proper installation functioning of filter fabric fence below grade of well site. It is recommended that the soil pile either be seeded or additional bmps are installed surrounding the pile to minimize E&S. Four below grade pits were located onsite freeboard levels ok, it is recommended that operator continue to monitor and maintain the required 2ft of lined freeboard and ensure that all pit liners are properly secured with backfill or stakes. Noted: water pit was temporarily secured with heavy equipment.
1888920 2010-06-01 No Violations Noted At the time of inspection, roadways (intersection of Glendale Lake Rd and ST Augustine Rd) leading to/from well site were muddy. Spoke with Darryl of Woodstock while onsite, who was going to skim road with skid loader to remove mud, which was underway prior to dept leaving site. The dept recommended that a broom truck also be utilized to clean the roadways. A follow up inspection will be completed to ensure compliance. Once at the site, access road entrance was not properly rocked and was muddy. Rig was no longer onsite, well drilled not yet set for production. Site did not exhibit any accelerated erosion or sedimentation issues.
1888926 2010-06-03 No Violations Noted This was a follow up inspection to a complaint inspection performed on Tues June 1, 2010 for muddy roadways coming and out of the well site. Upon inspection, noted that Glendale Lake Road and St. Augustine Road had been successfully cleaned. Appears that all mud had been removed and roadways were swept. Operator complied with the department﾿s requests in an efficient and courteous manor. No accelerated E&S issues were observed. It is recommended that the operator continue to maintain the access road, as well as all roadways leading to the well during all phases of construction in order to prevent such an event from occurring in the future.
1918394 2010-10-07 No Violations Noted At the time of this inspection, well drilled, not yet equipped for production. Site properly signed with ES plan available for review. All pits have been removed and site has been regarded and seeded and mulched. Growth is exhibited, but 70% uniform coverage has not yet been sustained. Filter fence installed and functioning properly. No accelerated erosion or sedimentation issues observed. Access road adequately rocked and pad size effectively reduced to minimize final area of disturbance. Until final restoration measures have been completed and >70%unfiorm growth is established operator should continue to monitor all bmp﾿s.
1961967 2011-03-22 No Violations Noted At the time of inspection, well drilled not yet in production. Site ID sign present. Well completed 05/23/10. Site has been re-graded, pits removed. Site appears adequately restored with min 70% permanent vegetative cover, although reseeding is recommended to ensure all areas exhibit a uniform coverage of growth; no accelerated erosion or sedimentation issues noted. Temporary bmp﾿s are to be removed upon final restoration. Access road stable.
2018060 2011-11-07 No Violations Noted At the time of inspection, well drilled. Drilling completed 5/23/10. Site ID sign present, although well tag illegible--recommend operator replace. Based on disturbed earth, appears pipleine may have been recently installed. Areas have beeen reseeded mulched. Well site uniformly restored; therefore, operator can remove filfter fence installed down gradient from pad. Access road stable and adequately rocked. No accelerated erosion or sedimention issues noted. Orange security fence located around well head. No violations noted at the time of this inspection.
2040800 2012-01-31 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was in production.


2138420 2013-02-07 No Violations Noted At time of inspection, well equipped for production. Orange security fence located around well head. Well tag present, in need of update. Department recommends that Operator ensures tag is legible.

Permanent stabilization achieved; therefore, Operator can remove filter fence located down gradient from well head. Access road stable. No E&S issues observed in relation to well site or access road. Department recommends Operator continue to monitor and maintain well site and access road as necessary.

2349910 2015-03-04 No Violations Noted At time of inspection

For data sources see[3]

References