If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-063-37062 | | Well ID: 37-063-37062 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.432891, -79.159908 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Indiana County, Pennsylvania|Indiana]] | ||
+ | |- | ||
+ | | Municipality: [[Burrell Township, Indiana County, Pennsylvania|Burrell Township]] | ||
|- | |- | ||
| Operator Name: [[KRIEBEL MINERALS INC]] | | Operator Name: [[KRIEBEL MINERALS INC]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
+ | |- | ||
+ | | Farm/Lease Name: SMITH DONALD 001 | ||
|- | |- | ||
| First Permit Date: 2011-03-21 | | First Permit Date: 2011-03-21 | ||
Line 17: | Line 25: | ||
| Horizontal: No | | Horizontal: No | ||
|- | |- | ||
− | | Violations: | + | | Well Status: ORND |
+ | |- | ||
+ | | Violations: 0 | ||
|- | |- | ||
| Latitude: 40.432891 | | Latitude: 40.432891 | ||
Line 34: | Line 44: | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
|- | |- | ||
− | | | + | | 2010-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 0.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 0.0 |
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 52: | Line 71: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2013-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 5300.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 334.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 61: | Line 80: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2014-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 3927.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 327.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 70: | Line 89: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 88: | Line 113: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095443 | | PA0095443 | ||
− | | | + | | CREEKSIDE TREATMENT FACILITY |
| CREEKSIDE | | CREEKSIDE | ||
| PA | | PA | ||
Line 99: | Line 124: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
− | | | + | | FLUID RECOVERY SERVICE JOSEPHINE FACILITY |
| JOSEPHINE | | JOSEPHINE | ||
| PA | | PA | ||
Line 106: | Line 131: | ||
| 2012-0 | | 2012-0 | ||
| FRACING FLUID WASTE | | FRACING FLUID WASTE | ||
− | | style="text-align:right;" | | + | | style="text-align:right;" | 1.0 |
| Bbl | | Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
− | | | + | | FLUID RECOVERY SERVICE JOSEPHINE FACILITY |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| JOSEPHINE | | JOSEPHINE | ||
| PA | | PA | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 155: | Line 153: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 2024534 | | 2024534 | ||
Line 160: | Line 160: | ||
| No Violations Noted | | No Violations Noted | ||
| Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit was dug. | | Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit was dug. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 166: | Line 168: | ||
| 2011-12-12 | | 2011-12-12 | ||
| No Violations Noted | | No Violations Noted | ||
− | | U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Water was recorded at 130 feet. Intermediate pipe ( | + | | U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Water was recorded at 130 feet. Intermediate pipe (7﾿) was set at 1,525 feet and was cemented with 261 sks of Class A. Plug was down at 9:20 pm on 12/9/11with 8 bbls return. 75 sks of cement was grouted to the 9 5/8﾿ pipe to bring the cement to surface. U.S. Energy was currently drilling at 2,810 feet for the production string. The anticipated depth is 4,974 feet. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 173: | Line 177: | ||
| 2011-12-08 | | 2011-12-08 | ||
| No Violations Noted | | No Violations Noted | ||
− | | U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Conductor pipe (13 3/ | + | | U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Conductor pipe (13 3/8﾿) was set at 47﾿ (sanded in place). Water protection (9 5/8﾿) was set at 422 ft. and cemented with 160 sks of Class A. Plug was down at 8:37 am on 12/8/11with no return. Water was recorded at 130 feet. U.S. Energy was on standby until for the required 8 hrs. Cement time. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 181: | Line 187: | ||
| No Violations Noted | | No Violations Noted | ||
| Kriebel had contracted U.S Energy. E&S plan and well sign were present. U.S Energy was setting up the drilling rig at the site. Spud notification was submitted to DEP on 1/10/12. | | Kriebel had contracted U.S Energy. E&S plan and well sign were present. U.S Energy was setting up the drilling rig at the site. Spud notification was submitted to DEP on 1/10/12. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 187: | Line 195: | ||
| 2012-01-13 | | 2012-01-13 | ||
| No Violations Noted | | No Violations Noted | ||
− | | Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Conductor pipe (13 3/ | + | | Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Conductor pipe (13 3/8﾿) was set at 26 feet and sanded in. Water protection pipe (9 5/8﾿) was set at 297 feet and was cemented with 105 sacks of Type I with 9 bbls return. Plug was down at 05:38 hours on 1/12/12. Intermediate pipe (7﾿) was set at 1,538 feet. U. S. Energy was waiting for cement delivery. Water levels were encountered at 65 feet and 400 feet. Coal seams were recorded at 85﾿to 90﾿ and 665﾿ to 670﾿ intervals. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 194: | Line 204: | ||
| 2012-01-19 | | 2012-01-19 | ||
| No Violations Noted | | No Violations Noted | ||
− | | Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Intermediate pipe ( | + | | Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Intermediate pipe (7﾿) was set at 1,526 feet with 270 sacks of Type I with 9 bbls of return. Production pipe was set at 4,639 feet. U.S. Energy completed gas well and was moving to next site. |
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 208: | Line 220: | ||
PA DEP Water Quality SPecialist April Weiland was present during inspection. | PA DEP Water Quality SPecialist April Weiland was present during inspection. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 213: | Line 227: | ||
| 2152271 | | 2152271 | ||
| 2013-03-22 | | 2013-03-22 | ||
− | |||
− | |||
| No Violations Noted | | No Violations Noted | ||
+ | | At time of inspection, well in production. Well tag present. Brine tank sound. Access road in excellent condition. Installed culverts appear maintained, structurally sound. | ||
+ | Production equipment on rocked pad, stable. Surrounding area of well site uniformly and adequately vegetated, permanently stabilized. No erosion or sedimentation issues observed in relation to access road or well site. | ||
+ | Department recommends Operator continue to monitor and maintain well site and access road as necessary. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 2206279 | | 2206279 | ||
| 2013-09-19 | | 2013-09-19 | ||
− | |||
− | |||
| No Violations Noted | | No Violations Noted | ||
+ | | At time of inspection, well equipped for production. Site has been restored and permanently stabilized. No accelerated erosion observed. Vegetation growth is adequate across site. Tank appears structurally sound. Access road in good condition. Well tag present. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-063-37062 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.432891,"lon":-79.159908,"icon":""}]} |
County: Indiana | |
Municipality: Burrell Township | |
Operator Name: KRIEBEL MINERALS INC | |
Well Pad ID: | |
Farm/Lease Name: SMITH DONALD 001 | |
First Permit Date: 2011-03-21 | |
Last Permit Date: 2011-03-21 | |
Spud Date: 2012-01-10 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ORND | |
Violations: 0 | |
Latitude: 40.432891 | |
Longitude: -79.159908 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 3576.0 | 302.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-0 | 5300.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-0 | 3927.0 | 327.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | DRILLING FLUID WASTE | 187.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
2012-0 | DRILLING FLUID WASTE | 400.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
2012-0 | FRACING FLUID WASTE | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2024534 | 2011-12-05 | No Violations Noted | Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit was dug. | |||
2026867 | 2011-12-12 | No Violations Noted | U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Water was recorded at 130 feet. Intermediate pipe (7﾿) was set at 1,525 feet and was cemented with 261 sks of Class A. Plug was down at 9:20 pm on 12/9/11with 8 bbls return. 75 sks of cement was grouted to the 9 5/8﾿ pipe to bring the cement to surface. U.S. Energy was currently drilling at 2,810 feet for the production string. The anticipated depth is 4,974 feet. | |||
2026879 | 2011-12-08 | No Violations Noted | U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Conductor pipe (13 3/8﾿) was set at 47﾿ (sanded in place). Water protection (9 5/8﾿) was set at 422 ft. and cemented with 160 sks of Class A. Plug was down at 8:37 am on 12/8/11with no return. Water was recorded at 130 feet. U.S. Energy was on standby until for the required 8 hrs. Cement time. | |||
2033279 | 2012-01-11 | No Violations Noted | Kriebel had contracted U.S Energy. E&S plan and well sign were present. U.S Energy was setting up the drilling rig at the site. Spud notification was submitted to DEP on 1/10/12. | |||
2034210 | 2012-01-13 | No Violations Noted | Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Conductor pipe (13 3/8﾿) was set at 26 feet and sanded in. Water protection pipe (9 5/8﾿) was set at 297 feet and was cemented with 105 sacks of Type I with 9 bbls return. Plug was down at 05:38 hours on 1/12/12. Intermediate pipe (7﾿) was set at 1,538 feet. U. S. Energy was waiting for cement delivery. Water levels were encountered at 65 feet and 400 feet. Coal seams were recorded at 85﾿to 90﾿ and 665﾿ to 670﾿ intervals. | |||
2035246 | 2012-01-19 | No Violations Noted | Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Intermediate pipe (7﾿) was set at 1,526 feet with 270 sacks of Type I with 9 bbls of return. Production pipe was set at 4,639 feet. U.S. Energy completed gas well and was moving to next site. | |||
2041224 | 2012-01-30 | No Violations Noted | Site visit was part of spud notification.
Access road was rocked and stable. Culverts were installed as noted on E&S plan. A corregated pipe was installed at the corner of the toe of slope near the access road. It was not actively discharging during inspection. It was also not noted on the E&S plan. The site id sign was incorrect. The permit number listed is invalid. PA DEP Water Quality SPecialist April Weiland was present during inspection. |
|||
2152271 | 2013-03-22 | No Violations Noted | At time of inspection, well in production. Well tag present. Brine tank sound. Access road in excellent condition. Installed culverts appear maintained, structurally sound.
Production equipment on rocked pad, stable. Surrounding area of well site uniformly and adequately vegetated, permanently stabilized. No erosion or sedimentation issues observed in relation to access road or well site. Department recommends Operator continue to monitor and maintain well site and access road as necessary. |
|||
2206279 | 2013-09-19 | No Violations Noted | At time of inspection, well equipped for production. Site has been restored and permanently stabilized. No accelerated erosion observed. Vegetation growth is adequate across site. Tank appears structurally sound. Access road in good condition. Well tag present. |
For data sources see[3]