If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-129-27814 | | Well ID: 37-129-27814 | ||
| − | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.331437, -79.759119 | width=100% | height=100% }} |
| + | |- | ||
| + | | County: [[Westmoreland County, Pennsylvania|Westmoreland]] | ||
| + | |- | ||
| + | | Municipality: [[North Huntingdon Township, Westmoreland County, Pennsylvania|North Huntingdon Township]] | ||
|- | |- | ||
| Operator Name: [[HUNTLEY & HUNTLEY INC]] | | Operator Name: [[HUNTLEY & HUNTLEY INC]] | ||
| + | |- | ||
| + | | Well Pad ID: | ||
| + | |- | ||
| + | | Farm/Lease Name: WILLOW GLENN 81-3 | ||
|- | |- | ||
| First Permit Date: 2009-02-09 | | First Permit Date: 2009-02-09 | ||
| Line 17: | Line 25: | ||
| Horizontal: No | | Horizontal: No | ||
|- | |- | ||
| − | | Violations: | + | | Well Status: ACTIVE |
| + | |- | ||
| + | | Violations: 0 | ||
|- | |- | ||
| Latitude: 40.331437 | | Latitude: 40.331437 | ||
| Line 34: | Line 44: | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
|- | |- | ||
| − | | | + | | 2009-0 |
| − | | style="text-align:right;" | | + | | style="text-align:right;" | 441.0 |
| − | | style="text-align:right;" | | + | | style="text-align:right;" | 30.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| Line 43: | Line 53: | ||
|- | |- | ||
|- | |- | ||
| − | | | + | | 2010-0 |
| − | | style="text-align:right;" | | + | | style="text-align:right;" | 23700.0 |
| − | | style="text-align:right;" | | + | | style="text-align:right;" | 365.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| Line 61: | Line 71: | ||
|- | |- | ||
|- | |- | ||
| − | | | + | | 2012-0 |
| − | | style="text-align:right;" | | + | | style="text-align:right;" | 17260.0 |
| + | | style="text-align:right;" | 366.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | | style="text-align:right;" | 0.0 | ||
| + | |- | ||
| + | |- | ||
| + | | 2013-0 | ||
| + | | style="text-align:right;" | 11571.67 | ||
| style="text-align:right;" | 365.0 | | style="text-align:right;" | 365.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| Line 70: | Line 89: | ||
|- | |- | ||
|- | |- | ||
| − | | | + | | 2014-0 |
| − | | style="text-align:right;" | | + | | style="text-align:right;" | 11455.0 |
| − | | style="text-align:right;" | | + | | style="text-align:right;" | 365.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| Line 79: | Line 98: | ||
|- | |- | ||
|} | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Oil and Gas Historical Production Report | ||
| + | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
| + | | date = 2015-05-26 | ||
| + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
| + | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
| Line 90: | Line 115: | ||
!scope="col" | FACILITY CITY | !scope="col" | FACILITY CITY | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
|- | |- | ||
| 2009-0 | | 2009-0 | ||
| DRILLING FLUID WASTE | | DRILLING FLUID WASTE | ||
| − | | style="text-align:right;" | | + | | style="text-align:right;" | 1.0 |
| Bbl | | Bbl | ||
| PUBLIC SEWAGE TREATMENT PLANT | | PUBLIC SEWAGE TREATMENT PLANT | ||
| Line 119: | Line 133: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0091472 | | PA0091472 | ||
| − | | TUNNELTON LIQUIDS | + | | TUNNELTON LIQUIDS TREATMENT FACILITY |
| SALTSBURG | | SALTSBURG | ||
| PA | | PA | ||
| Line 132: | Line 146: | ||
| MCKEESPORT SEWAGE TREATMENT PLANT | | MCKEESPORT SEWAGE TREATMENT PLANT | ||
| MCKEESPORT | | MCKEESPORT | ||
| + | | PA | ||
| + | |- | ||
| + | |- | ||
| + | | 2010-0 | ||
| + | | DRILLING FLUID WASTE | ||
| + | | style="text-align:right;" | 110.0 | ||
| + | | Bbl | ||
| + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| + | | PA0091472 | ||
| + | | TUNNELTON LIQUIDS TREATMENT FACILITY | ||
| + | | SALTSBURG | ||
| PA | | PA | ||
|- | |- | ||
| Line 143: | Line 168: | ||
| MCKEESPORT SEWAGE TREATMENT PLANT | | MCKEESPORT SEWAGE TREATMENT PLANT | ||
| MCKEESPORT | | MCKEESPORT | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| PA | | PA | ||
|- | |- | ||
| Line 163: | Line 177: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0091472 | | PA0091472 | ||
| − | | TUNNELTON LIQUIDS | + | | TUNNELTON LIQUIDS TREATMENT FACILITY |
| SALTSBURG | | SALTSBURG | ||
| PA | | PA | ||
| Line 174: | Line 188: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
| − | | | + | | FLUID RECOVERY SERVICE JOSEPHINE FACILITY |
| JOSEPHINE | | JOSEPHINE | ||
| PA | | PA | ||
| Line 185: | Line 199: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0254185 | | PA0254185 | ||
| − | | RESERVED | + | | RESERVED ENV SVC WASTE WATER TREATMENT FACILITY |
| MOUNT PLEASANT | | MOUNT PLEASANT | ||
| PA | | PA | ||
| Line 201: | Line 215: | ||
|- | |- | ||
|} | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Oil and Gas Historical Waste Report | ||
| + | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
| + | | date = 2015-05-26 | ||
| + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
| + | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
| Line 208: | Line 228: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
| + | !scope="col" | VIOLATION CODE | ||
| + | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 1821665 | | 1821665 | ||
| Line 213: | Line 235: | ||
| No Violations Noted | | No Violations Noted | ||
| US ENERGY DRILLING FOR HUNTLEY, I ARRIVE ON LOCATION WITH MIKE ARCH, FOUND ACCESS ROAD IN BAD SHAPE, PIT WALLS ARE STRAIGHT UP AND DOWN WITH NO FENCE AROUND PIT. E&S PLAN IS NOT SITE SPECIFIC. ERIC FINDLEY AGREED TO TAKE CARE OF ISSUES. I WILL RETURN TOMORROW TO OBSERVE PROGRESS | | US ENERGY DRILLING FOR HUNTLEY, I ARRIVE ON LOCATION WITH MIKE ARCH, FOUND ACCESS ROAD IN BAD SHAPE, PIT WALLS ARE STRAIGHT UP AND DOWN WITH NO FENCE AROUND PIT. E&S PLAN IS NOT SITE SPECIFIC. ERIC FINDLEY AGREED TO TAKE CARE OF ISSUES. I WILL RETURN TOMORROW TO OBSERVE PROGRESS | ||
| + | | | ||
| + | | | ||
| | | | ||
|- | |- | ||
| Line 220: | Line 244: | ||
| No Violations Noted | | No Violations Noted | ||
| US ENERGY RIGGED BACK UP TO DRILL. HUNTLEY DECIDED NOT TO PRODUCE THE OPEN FLOW AT 1410. THEY CONTINUED TO DRILL UNTIL THEY HIT 100GPM, NOW THEY HAVE WATER TRUCKS RUNNING CONSTANTLY TO KEEP UP WITH THE WATER. FINDLEY SAYS HE CAN SUBSTITUTE HIS BOP AS A DIVERTER ONLY WITHOUT VOLATING 78.72. I INTERPRET THIS PASSAGE TO MEAN THAT A BOP STACK MAY NOT BE ATTACHED TO ANY LESS THAN 400' REGARDLESS OF INTENTION TO USE OR NOT | | US ENERGY RIGGED BACK UP TO DRILL. HUNTLEY DECIDED NOT TO PRODUCE THE OPEN FLOW AT 1410. THEY CONTINUED TO DRILL UNTIL THEY HIT 100GPM, NOW THEY HAVE WATER TRUCKS RUNNING CONSTANTLY TO KEEP UP WITH THE WATER. FINDLEY SAYS HE CAN SUBSTITUTE HIS BOP AS A DIVERTER ONLY WITHOUT VOLATING 78.72. I INTERPRET THIS PASSAGE TO MEAN THAT A BOP STACK MAY NOT BE ATTACHED TO ANY LESS THAN 400' REGARDLESS OF INTENTION TO USE OR NOT | ||
| + | | | ||
| + | | | ||
| | | | ||
|- | |- | ||
| Line 227: | Line 253: | ||
| No Violations Noted | | No Violations Noted | ||
| US ENERGY DRILLED TO 1922, SMELLED GAS BUT DID NOT REALIZE UNTIL THEY WERE TRIPPING OUT, HOW MUCH GAS THEY HAD. SUPERIOR WAS ON SITE LOGGING THE WELL WHEN I ARRIVED. DAVE JANCO & ERIC FINDLEY WERE ALSO ON LOCATION. THEY HIT 1/2 MILLION OPEN FLOW, HAVE CEASED DRILLING AND DETERMINED THE GAS TO BE COMING FROM 1410 FROM THE LOYALHANNA. ERIC HAS 1400' OF 4.5 ON IT'S WAY FROM MCJUNKEN AND AN 8 5/8-4.5 PACKER ON ROUTE FROM BIG JOHN AT MILLER'S. THEY ARE MOVING OUT THE RIG, MOVING IN A SERVICE RIG AND SETTING THE 4.5 ON A PACKER TO TAKE THE PRESSURE OFF THE 9 5/8. THEIR PLAN IS TO CLOSE IN AND MONITOR THE ANNULUS OUTSIDE THE 4.5 AND PUT IT INTO THEIR LINE (30LBS) AND PRODUCE LOYALHANNA GAS FROM 1410 WITH RATHOLE TO 1922. THEY PLAN TO APPLY FOR A 1000' VERTICAL VARIANCE, SKID ADN DRILL ANOTHER WELL NEXT TO THIS WELL, CEMENTING CASING IN FROM 2410 UP AND HAVE AGREED TO CEMENT CASING IN AT 400 ON THE NEXT WELL SO THEY CAN USE THEIR BOP IF THEY TAKE ANOTHER GAS KICK. THEIR E&S PLAN HAS BEEN UPDATED PITS ARE FENCED IN, ACCESS ROAD HAS MORE LIMESTONE | | US ENERGY DRILLED TO 1922, SMELLED GAS BUT DID NOT REALIZE UNTIL THEY WERE TRIPPING OUT, HOW MUCH GAS THEY HAD. SUPERIOR WAS ON SITE LOGGING THE WELL WHEN I ARRIVED. DAVE JANCO & ERIC FINDLEY WERE ALSO ON LOCATION. THEY HIT 1/2 MILLION OPEN FLOW, HAVE CEASED DRILLING AND DETERMINED THE GAS TO BE COMING FROM 1410 FROM THE LOYALHANNA. ERIC HAS 1400' OF 4.5 ON IT'S WAY FROM MCJUNKEN AND AN 8 5/8-4.5 PACKER ON ROUTE FROM BIG JOHN AT MILLER'S. THEY ARE MOVING OUT THE RIG, MOVING IN A SERVICE RIG AND SETTING THE 4.5 ON A PACKER TO TAKE THE PRESSURE OFF THE 9 5/8. THEIR PLAN IS TO CLOSE IN AND MONITOR THE ANNULUS OUTSIDE THE 4.5 AND PUT IT INTO THEIR LINE (30LBS) AND PRODUCE LOYALHANNA GAS FROM 1410 WITH RATHOLE TO 1922. THEY PLAN TO APPLY FOR A 1000' VERTICAL VARIANCE, SKID ADN DRILL ANOTHER WELL NEXT TO THIS WELL, CEMENTING CASING IN FROM 2410 UP AND HAVE AGREED TO CEMENT CASING IN AT 400 ON THE NEXT WELL SO THEY CAN USE THEIR BOP IF THEY TAKE ANOTHER GAS KICK. THEIR E&S PLAN HAS BEEN UPDATED PITS ARE FENCED IN, ACCESS ROAD HAS MORE LIMESTONE | ||
| + | | | ||
| + | | | ||
| | | | ||
|- | |- | ||
| Line 234: | Line 262: | ||
| No Violations Noted | | No Violations Noted | ||
| PRODUCING WELL, OPEN PIT, FENCE IS FALLING DOWN AND PARTIALLY MISSING. ANNULUS IS CLOSED, SITE HAS NOT YET BEEN RESTORED. | | PRODUCING WELL, OPEN PIT, FENCE IS FALLING DOWN AND PARTIALLY MISSING. ANNULUS IS CLOSED, SITE HAS NOT YET BEEN RESTORED. | ||
| + | | | ||
| + | | | ||
| | | | ||
|- | |- | ||
|} | |} | ||
| − | ==References== | + | For data sources see<ref>{{cite web |
| − | {{ | + | | title = Oil and Gas Historical Inspection Report |
| − | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
| + | | date = 2015-05-26 | ||
| + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
| + | | accessdate = 2015-05-27 }}</ref> | ||
| + | == References == | ||
| + | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] | ||
| Well ID: 37-129-27814 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.331437,"lon":-79.759119,"icon":""}]} |
| County: Westmoreland | |
| Municipality: North Huntingdon Township | |
| Operator Name: HUNTLEY & HUNTLEY INC | |
| Well Pad ID: | |
| Farm/Lease Name: WILLOW GLENN 81-3 | |
| First Permit Date: 2009-02-09 | |
| Last Permit Date: 2009-02-09 | |
| Spud Date: 2009-08-11 | |
| Unconventional: No | |
| Horizontal: No | |
| Well Status: ACTIVE | |
| Violations: 0 | |
| Latitude: 40.331437 | |
| Longitude: -79.759119 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|---|---|---|---|---|---|
| 2009-0 | 441.0 | 30.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2010-0 | 23700.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2011-0 | 21044.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2012-0 | 17260.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2013-0 | 11571.67 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2014-0 | 11455.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|---|---|---|---|---|---|---|---|
| 2009-0 | DRILLING FLUID WASTE | 1.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026913 | MCKEESPORT SEWAGE TREATMENT PLANT | MCKEESPORT | PA |
| 2009-0 | DRILLING FLUID WASTE | 160.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS TREATMENT FACILITY | SALTSBURG | PA |
| 2010-0 | DRILLING FLUID WASTE | 951.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026913 | MCKEESPORT SEWAGE TREATMENT PLANT | MCKEESPORT | PA |
| 2010-0 | DRILLING FLUID WASTE | 110.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS TREATMENT FACILITY | SALTSBURG | PA |
| 2010-0 | FRACING FLUID WASTE | 85.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026913 | MCKEESPORT SEWAGE TREATMENT PLANT | MCKEESPORT | PA |
| 2010-0 | PRODUCED FLUID | 80.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS TREATMENT FACILITY | SALTSBURG | PA |
| 2011-0 | PRODUCED FLUID | 80.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
| 2012-0 | PRODUCED FLUID | 70.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 | RESERVED ENV SVC WASTE WATER TREATMENT FACILITY | MOUNT PLEASANT | PA |
| 2013-0 | PRODUCED FLUID | 100.0 | Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
For data sources see[2]
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
|---|---|---|---|---|---|---|
| 1821665 | 2009-08-12 | No Violations Noted | US ENERGY DRILLING FOR HUNTLEY, I ARRIVE ON LOCATION WITH MIKE ARCH, FOUND ACCESS ROAD IN BAD SHAPE, PIT WALLS ARE STRAIGHT UP AND DOWN WITH NO FENCE AROUND PIT. E&S PLAN IS NOT SITE SPECIFIC. ERIC FINDLEY AGREED TO TAKE CARE OF ISSUES. I WILL RETURN TOMORROW TO OBSERVE PROGRESS | |||
| 1821679 | 2009-08-18 | No Violations Noted | US ENERGY RIGGED BACK UP TO DRILL. HUNTLEY DECIDED NOT TO PRODUCE THE OPEN FLOW AT 1410. THEY CONTINUED TO DRILL UNTIL THEY HIT 100GPM, NOW THEY HAVE WATER TRUCKS RUNNING CONSTANTLY TO KEEP UP WITH THE WATER. FINDLEY SAYS HE CAN SUBSTITUTE HIS BOP AS A DIVERTER ONLY WITHOUT VOLATING 78.72. I INTERPRET THIS PASSAGE TO MEAN THAT A BOP STACK MAY NOT BE ATTACHED TO ANY LESS THAN 400' REGARDLESS OF INTENTION TO USE OR NOT | |||
| 1821687 | 2009-08-13 | No Violations Noted | US ENERGY DRILLED TO 1922, SMELLED GAS BUT DID NOT REALIZE UNTIL THEY WERE TRIPPING OUT, HOW MUCH GAS THEY HAD. SUPERIOR WAS ON SITE LOGGING THE WELL WHEN I ARRIVED. DAVE JANCO & ERIC FINDLEY WERE ALSO ON LOCATION. THEY HIT 1/2 MILLION OPEN FLOW, HAVE CEASED DRILLING AND DETERMINED THE GAS TO BE COMING FROM 1410 FROM THE LOYALHANNA. ERIC HAS 1400' OF 4.5 ON IT'S WAY FROM MCJUNKEN AND AN 8 5/8-4.5 PACKER ON ROUTE FROM BIG JOHN AT MILLER'S. THEY ARE MOVING OUT THE RIG, MOVING IN A SERVICE RIG AND SETTING THE 4.5 ON A PACKER TO TAKE THE PRESSURE OFF THE 9 5/8. THEIR PLAN IS TO CLOSE IN AND MONITOR THE ANNULUS OUTSIDE THE 4.5 AND PUT IT INTO THEIR LINE (30LBS) AND PRODUCE LOYALHANNA GAS FROM 1410 WITH RATHOLE TO 1922. THEY PLAN TO APPLY FOR A 1000' VERTICAL VARIANCE, SKID ADN DRILL ANOTHER WELL NEXT TO THIS WELL, CEMENTING CASING IN FROM 2410 UP AND HAVE AGREED TO CEMENT CASING IN AT 400 ON THE NEXT WELL SO THEY CAN USE THEIR BOP IF THEY TAKE ANOTHER GAS KICK. THEIR E&S PLAN HAS BEEN UPDATED PITS ARE FENCED IN, ACCESS ROAD HAS MORE LIMESTONE | |||
| 1870167 | 2010-02-04 | No Violations Noted | PRODUCING WELL, OPEN PIT, FENCE IS FALLING DOWN AND PARTIALLY MISSING. ANNULUS IS CLOSED, SITE HAS NOT YET BEEN RESTORED. |
For data sources see[3]