Well ID: 37-129-27814
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: North Huntingdon Township
Operator Name: HUNTLEY & HUNTLEY INC
Well Pad ID:
Farm/Lease Name: WILLOW GLENN 81-3
License Status:
Spud Date:
Permit Date: 2009-02-09
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.331438
Longitude: -79.759119

For data sources see[1][2][3]

Well History

Date Event
2009-02-09 New Permit Application
2009-08-11 Performed Spud Operation
2009-08-20 Drilling Completion
2009-12-15 Perforation
2013-05-31 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 HUNTLEY & HUNTLEY INC 441.00 30 0.00 0 0.00 0
2010 HUNTLEY & HUNTLEY INC 23,700.00 365 0.00 0 0.00 0
2011 HUNTLEY & HUNTLEY INC 21,044.00 365 0.00 0 0.00 0
2012 HUNTLEY & HUNTLEY INC 17,260.00 366 0.00 0 0.00 0
2013 HUNTLEY & HUNTLEY INC 11,571.67 365 0.00 0 0.00 0
2014 HUNTLEY & HUNTLEY INC 11,455.00 365 0.00 0 0.00 0
2015 HUNTLEY & HUNTLEY INC 9,629.00 365 0.00 0 0.00 0
2016 HUNTLEY & HUNTLEY INC 7,705.00 366 0.00 0 0.00 0
2017 HUNTLEY & HUNTLEY INC 6,102.00 365 0.00 0 0.00 0
2018 HUNTLEY & HUNTLEY INC 7,145.00 365 0.00 0 0.00 0
2019 HUNTLEY & HUNTLEY INC 7,125.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 HUNTLEY & HUNTLEY INC Drilling Fluid Waste 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2009 HUNTLEY & HUNTLEY INC Drilling Fluid Waste 1,770.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026913
2010 HUNTLEY & HUNTLEY INC Fracing Fluid Waste 85.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026913
2010 HUNTLEY & HUNTLEY INC Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 HUNTLEY & HUNTLEY INC Drilling Fluid Waste 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 HUNTLEY & HUNTLEY INC Drilling Fluid Waste 951.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026913
2011 HUNTLEY & HUNTLEY INC Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 HUNTLEY & HUNTLEY INC Produced Fluid 70.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 HUNTLEY & HUNTLEY INC Produced Fluid 100 Bbl CENT WASTE TRT FAC NPDES PA0095273
2013 HUNTLEY & HUNTLEY INC Produced Fluid 100.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2017 HUNTLEY & HUNTLEY INC Produced Fluid 25.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2018 HUNTLEY & HUNTLEY INC Produced Fluid 20.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1821665 Primary Facility 2009-08-12 Drilling/Alteration No Violations Noted US ENERGY DRILLING FOR HUNTLEY, I ARRIVE ON LOCATION WITH MIKE ARCH, FOUND ACCESS ROAD IN BAD SHAPE, PIT WALLS ARE STRAIGHT UP AND DOWN WITH NO FENCE AROUND PIT. E&S PLAN IS NOT SITE SPECIFIC. ERIC FINDLEY AGREED TO TAKE CARE OF ISSUES. I WILL RETURN TOMORROW TO OBSERVE PROGRESS
1821679 Primary Facility 2009-08-18 Drilling/Alteration No Violations Noted US ENERGY RIGGED BACK UP TO DRILL. HUNTLEY DECIDED NOT TO PRODUCE THE OPEN FLOW AT 1410. THEY CONTINUED TO DRILL UNTIL THEY HIT 100GPM, NOW THEY HAVE WATER TRUCKS RUNNING CONSTANTLY TO KEEP UP WITH THE WATER. FINDLEY SAYS HE CAN SUBSTITUTE HIS BOP AS A DIVERTER ONLY WITHOUT VOLATING 78.72. I INTERPRET THIS PASSAGE TO MEAN THAT A BOP STACK MAY NOT BE ATTACHED TO ANY LESS THAN 400' REGARDLESS OF INTENTION TO USE OR NOT
1821687 Primary Facility 2009-08-13 Drilling/Alteration No Violations Noted US ENERGY DRILLED TO 1922, SMELLED GAS BUT DID NOT REALIZE UNTIL THEY WERE TRIPPING OUT, HOW MUCH GAS THEY HAD. SUPERIOR WAS ON SITE LOGGING THE WELL WHEN I ARRIVED. DAVE JANCO & ERIC FINDLEY WERE ALSO ON LOCATION. THEY HIT 1/2 MILLION OPEN FLOW, HAVE CEASED DRILLING AND DETERMINED THE GAS TO BE COMING FROM 1410 FROM THE LOYALHANNA. ERIC HAS 1400' OF 4.5 ON IT'S WAY FROM MCJUNKEN AND AN 8 5/8-4.5 PACKER ON ROUTE FROM BIG JOHN AT MILLER'S. THEY ARE MOVING OUT THE RIG, MOVING IN A SERVICE RIG AND SETTING THE 4.5 ON A PACKER TO TAKE THE PRESSURE OFF THE 9 5/8. THEIR PLAN IS TO CLOSE IN AND MONITOR THE ANNULUS OUTSIDE THE 4.5 AND PUT IT INTO THEIR LINE (30LBS) AND PRODUCE LOYALHANNA GAS FROM 1410 WITH RATHOLE TO 1922. THEY PLAN TO APPLY FOR A 1000' VERTICAL VARIANCE, SKID ADN DRILL ANOTHER WELL NEXT TO THIS WELL, CEMENTING CASING IN FROM 2410 UP AND HAVE AGREED TO CEMENT CASING IN AT 400 ON THE NEXT WELL SO THEY CAN USE THEIR BOP IF THEY TAKE ANOTHER GAS KICK. THEIR E&S PLAN HAS BEEN UPDATED PITS ARE FENCED IN, ACCESS ROAD HAS MORE LIMESTONE
1870167 Primary Facility 2010-02-04 Follow-up Inspection No Violations Noted PRODUCING WELL, OPEN PIT, FENCE IS FALLING DOWN AND PARTIALLY MISSING. ANNULUS IS CLOSED, SITE HAS NOT YET BEEN RESTORED.

For data sources see[7]