If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-005-31027 | | Well ID: 37-005-31027 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.710661, -79.626202 | width=100% | height=100% }} |
|- | |- | ||
| County: [[Armstrong County, Pennsylvania|Armstrong]] | | County: [[Armstrong County, Pennsylvania|Armstrong]] | ||
Line 9: | Line 9: | ||
| Municipality: [[South Buffalo Township, Armstrong County, Pennsylvania|South Buffalo Township]] | | Municipality: [[South Buffalo Township, Armstrong County, Pennsylvania|South Buffalo Township]] | ||
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[SNYDER BROS INC]] |
|- | |- | ||
− | | Well Pad ID: [[147131]] | + | | Well Pad ID: [[147131|147131]] |
|- | |- | ||
| Farm/Lease Name: WILLIAM H RENSHAW ETUX 4M-161 | | Farm/Lease Name: WILLIAM H RENSHAW ETUX 4M-161 | ||
Line 25: | Line 25: | ||
| Horizontal: No | | Horizontal: No | ||
|- | |- | ||
− | | | + | | Well Status: ACTIVE |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
| Latitude: 40.710661 | | Latitude: 40.710661 | ||
|- | |- | ||
| Longitude: -79.626202 | | Longitude: -79.626202 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
Line 81: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2012-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
|- | |- | ||
| 2012-2 | | 2012-2 | ||
Line 91: | Line 62: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2013-1 |
+ | | style="text-align:right;" | 53700.0 | ||
+ | | style="text-align:right;" | 181.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-2 | ||
+ | | style="text-align:right;" | 26235.0 | ||
+ | | style="text-align:right;" | 179.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | style="text-align:right;" | 20146.0 | ||
+ | | style="text-align:right;" | 181.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | style="text-align:right;" | 16200.0 | ||
+ | | style="text-align:right;" | 181.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-02 | ||
+ | | style="text-align:right;" | 2383.0 | ||
+ | | style="text-align:right;" | 28.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-01 | ||
+ | | style="text-align:right;" | 1923.0 | ||
+ | | style="text-align:right;" | 23.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-03 | ||
+ | | style="text-align:right;" | 2653.0 | ||
+ | | style="text-align:right;" | 31.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 100: | Line 125: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 111: | Line 142: | ||
!scope="col" | FACILITY CITY | !scope="col" | FACILITY CITY | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | DRILL CUTTINGS | ||
+ | | style="text-align:right;" | 119.0 | ||
+ | | Tons | ||
+ | | ON SITE ENCAPSULATION | ||
+ | | | ||
+ | | ON SITE DISPOSAL PURSUANT TO 25 PA CODE 78.62 | ||
+ | | | ||
+ | | PA | ||
+ | |- | ||
|- | |- | ||
| 2012-2 | | 2012-2 | ||
| FRACING FLUID WASTE | | FRACING FLUID WASTE | ||
− | | style="text-align:right;" | | + | | style="text-align:right;" | 2.0 |
| Bbl | | Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 121: | Line 163: | ||
| CLARION | | CLARION | ||
| PA | | PA | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-2 | ||
+ | | FRACING FLUID WASTE | ||
+ | | style="text-align:right;" | 240.0 | ||
+ | | Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | | REUSE FOR HYDRAULIC FRACTURING | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 129: | Line 182: | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-155-21438 | | 34-155-21438 | ||
− | | KLEESE #1 (SWIW #18) | + | | KLEESE #1 (SWIW #18) |
| VIENNA | | VIENNA | ||
| OH | | OH | ||
Line 135: | Line 188: | ||
|- | |- | ||
| 2012-2 | | 2012-2 | ||
− | | | + | | PRODUCED FLUID |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 80.0 |
− | | | + | | Bbl |
− | | | + | | INJECTION DISPOSAL WELL |
− | | | + | | 34-155-23795 |
− | | | + | | PANDER #1 (SWIW #15) |
− | | | + | | NEWTON FALLS |
− | | | + | | OH |
|- | |- | ||
|- | |- | ||
Line 150: | Line 203: | ||
| Bbl | | Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-155- | + | | 34-155-21893 |
− | | | + | | WOLF #1 DISP WELL |
| NEWTON FALLS | | NEWTON FALLS | ||
| OH | | OH | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2013-1 |
− | | | + | | PRODUCED FLUID |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 80.0 |
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-21438 | ||
+ | | KLEESE #1 (SWIW #18) | ||
+ | | VIENNA | ||
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-1 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 80.0 | ||
| Bbl | | Bbl | ||
− | | | + | | INJECTION DISPOSAL WELL |
− | | | + | | 34-155-21447 |
− | | | + | | KLEESE #2 (SWIW #19) |
− | | | + | | VIENNA |
− | | | + | | OH |
|- | |- | ||
|- | |- | ||
− | | | + | | 2013-2 |
| PRODUCED FLUID | | PRODUCED FLUID | ||
| style="text-align:right;" | 80.0 | | style="text-align:right;" | 80.0 | ||
| Bbl | | Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | 34-155- | + | | 34-155-21438 |
− | | | + | | KLEESE #1 (SWIW #18) |
− | | | + | | VIENNA |
+ | | OH | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 105.0 | ||
+ | | Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-21438 | ||
+ | | KLEESE #1 (SWIW #18) | ||
+ | | VIENNA | ||
| OH | | OH | ||
|- | |- | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
− | + | | title = Oil and Gas Historical Waste Report | |
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
+ | == Inspection Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | INSPECTION ID | ||
+ | !scope="col" | DATE | ||
+ | !scope="col" | DESCRIPTION | ||
+ | !scope="col" | COMMENT | ||
+ | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
+ | |- | ||
+ | | 2099870 | ||
+ | | 2012-09-13 | ||
+ | | No Violations Noted | ||
+ | | Pre-operation inspection at the request of the Operator. At the time of inspection the Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that at the time of inspection an erosion ditch is forming on the fill side of the well pad area and left unchecked could result in sedimentation transported offsite. The Department suggests the Operator clean out the area behind the silt fence and mend the eroded fill side of the well pad. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2104747 | ||
+ | | 2012-10-03 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the Operator was actively drilling the onsite. The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that suggestions made during the 9/13 inspection in relation to the erosion ditch and sediment fence maintenance have not been corrected. The Department suggests again that the Operator mend the erosion ditch forming on the corner of the well pad furthest from the cut slope and pull the built up sediment away from the sediment fence. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2111180 | ||
+ | | 2012-10-24 | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the site appeared to be drilled but not equipped for production The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that suggestions made during the 9/13 and 10/3 inspection in relation to the erosion ditch and sediment fence maintenance have been corrected. The Department notes that the Operator mended the erosion ditch forming on the corner of the well pad furthest from the cut slope and pulled the built up sediment away from the sediment fence. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2118997 | ||
+ | | 2012-11-28 | ||
+ | | No Violations Noted | ||
+ | | Well producing in line after recent frac. Pit lined and freeboard maintained. | ||
+ | Well equipped with production unit (separators, heater, meter), and two (2) produced fluids tanks. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2170517 | ||
+ | | 2013-05-24 | ||
+ | | No Violations Noted | ||
+ | | Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. Site had been regraded, seeded, mulched and the vegetation ahd begun to emerge. The operator should continue to monitor the site to isnure the continued growth of the vegetation. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2185962 | ||
+ | | 2013-07-19 | ||
+ | | No Violations Noted | ||
+ | | Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. Site had been regraded, seeded, mulched and the vegetation met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Inspection Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-005-31027 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.710661,"lon":-79.626202,"icon":""}]} |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 147131 | |
Farm/Lease Name: WILLIAM H RENSHAW ETUX 4M-161 | |
First Permit Date: 2012-03-13 | |
Last Permit Date: 2012-03-13 | |
Spud Date: 2012-09-25 | |
Unconventional: Yes | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 40.710661 | |
Longitude: -79.626202 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 4397.0 | 7.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 53700.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 26235.0 | 179.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 20146.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 16200.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 2383.0 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 1923.0 | 23.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 2653.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | DRILL CUTTINGS | 119.0 | Tons | ON SITE ENCAPSULATION | ON SITE DISPOSAL PURSUANT TO 25 PA CODE 78.62 | PA | ||
2012-2 | FRACING FLUID WASTE | 2.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 | CAES WATER TRMT & RECYCLING FAC | CLARION | PA |
2012-2 | FRACING FLUID WASTE | 240.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) | VIENNA | OH |
2012-2 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL | NEWTON FALLS | OH |
2013-1 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) | VIENNA | OH |
2013-1 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) | VIENNA | OH |
2013-2 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) | VIENNA | OH |
2014-2 | PRODUCED FLUID | 105.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) | VIENNA | OH |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2099870 | 2012-09-13 | No Violations Noted | Pre-operation inspection at the request of the Operator. At the time of inspection the Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that at the time of inspection an erosion ditch is forming on the fill side of the well pad area and left unchecked could result in sedimentation transported offsite. The Department suggests the Operator clean out the area behind the silt fence and mend the eroded fill side of the well pad. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained. | |||
2104747 | 2012-10-03 | No Violations Noted | At the time of inspection the Operator was actively drilling the onsite. The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that suggestions made during the 9/13 inspection in relation to the erosion ditch and sediment fence maintenance have not been corrected. The Department suggests again that the Operator mend the erosion ditch forming on the corner of the well pad furthest from the cut slope and pull the built up sediment away from the sediment fence. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained. | |||
2111180 | 2012-10-24 | No Violations Noted | At the time of inspection the site appeared to be drilled but not equipped for production The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that suggestions made during the 9/13 and 10/3 inspection in relation to the erosion ditch and sediment fence maintenance have been corrected. The Department notes that the Operator mended the erosion ditch forming on the corner of the well pad furthest from the cut slope and pulled the built up sediment away from the sediment fence. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained. | |||
2118997 | 2012-11-28 | No Violations Noted | Well producing in line after recent frac. Pit lined and freeboard maintained.
Well equipped with production unit (separators, heater, meter), and two (2) produced fluids tanks. |
|||
2170517 | 2013-05-24 | No Violations Noted | Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. Site had been regraded, seeded, mulched and the vegetation ahd begun to emerge. The operator should continue to monitor the site to isnure the continued growth of the vegetation. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. | |||
2185962 | 2013-07-19 | No Violations Noted | Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. Site had been regraded, seeded, mulched and the vegetation met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. |
For data sources see[3]