X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-015-20277"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-015-20277
 
| Well ID: 37-015-20277
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.860614, -76.677019 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.860614, -76.677019 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Bradford County, Pennsylvania|Bradford]]
 
| County: [[Bradford County, Pennsylvania|Bradford]]
Line 9: Line 9:
 
| Municipality: [[Springfield Township, Bradford County, Pennsylvania|Springfield Township]]
 
| Municipality: [[Springfield Township, Bradford County, Pennsylvania|Springfield Township]]
 
|-
 
|-
| Operator Name: [[EOG RESOURCES INC|EOG RESOURCES INC]]
+
| Operator Name: [[EOG RESOURCES INC]]
 
|-
 
|-
| Well Pad ID: [[146991]]
+
| Well Pad ID: [[146991|146991]]
 
|-
 
|-
 
| Farm/Lease Name: HARKNESS 2H
 
| Farm/Lease Name: HARKNESS 2H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
 
| Violations: 11
 
| Violations: 11
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
== Inspection Data ==
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | PERIOD
!scope="col" | DATE
+
!scope="col" | GAS QUANTITY
!scope="col" | DESCRIPTION
+
!scope="col" | GAS PRODUCTION DAYS
!scope="col" | COMMENT
+
!scope="col" | CONDENSATE QUANTITY
!scope="col" | VIOLATION ID
+
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 1871335
+
| 2010-3
| 2010-03-17
+
| style="text-align:right;" | 0.0
| Viol(s) Noted &  Immediately Corrected
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
| 583593
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1947395
+
| 2009-0
| 2011-02-03
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| Ran pipe to TD in preparation to perforate. Fracing expected to begin in approx. 3 weeks.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1981278
+
| 2010-2
| 2011-06-02
+
| style="text-align:right;" | 0.0
| Violation(s) Noted
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
| 613771
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1981278
+
| 2010-2
| 2011-06-02
+
| style="text-align:right;" | 0.0
| Violation(s) Noted
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
| 613772
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1981278
+
| 2011-1
| 2011-06-02
+
| style="text-align:right;" | 142852.0
| Violation(s) Noted
+
| style="text-align:right;" | 91.0
|  
+
| style="text-align:right;" | 0.0
| 613773
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1993526
+
| 2011-2
| 2011-08-05
+
| style="text-align:right;" | 572481.0
| Violation(s) Noted
 
|
 
| 617043
 
|-
 
|-
 
| 1993526
 
| 2011-08-05
 
| Violation(s) Noted
 
|
 
| 617044
 
|-
 
|-
 
| 1993526
 
| 2011-08-05
 
| Violation(s) Noted
 
|
 
| 617045
 
|-
 
|-
 
| 1993526
 
| 2011-08-05
 
| Violation(s) Noted
 
|
 
| 617191
 
|-
 
|-
 
| 1993633
 
| 2011-07-07
 
| Violation(s) Noted
 
| This is a follow-up. High conductivity puddles first noted in inspection report # 1981278.
 
This is a follow-up. High conductivity puddles first noted in inspection report 1981278.
 
| 617065
 
|-
 
|-
 
| 1993633
 
| 2011-07-07
 
| Violation(s) Noted
 
| This is a follow-up. High conductivity puddles first noted in inspection report # 1981278.
 
This is a follow-up. High conductivity puddles first noted in inspection report 1981278.
 
| 617066
 
|-
 
|-
 
| 1993633
 
| 2011-07-07
 
| Violation(s) Noted
 
| This is a follow-up. High conductivity puddles first noted in inspection report # 1981278.
 
This is a follow-up. High conductivity puddles first noted in inspection report 1981278.
 
| 617067
 
|-
 
|-
 
| 1997007
 
| 2011-08-17
 
| Outstanding Violations - No Viols Req'd
 
|
 
|
 
|-
 
|-
 
| 2001692
 
| 2011-09-07
 
| No Violations Noted
 
|
 
|
 
|-
 
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
| 2012-2
 
| style="text-align:right;" | 379068.0
 
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 171: Line 107:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2012-2
| style="text-align:right;" | 572481.0
+
| style="text-align:right;" | 379068.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 180: Line 116:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2013-1
| style="text-align:right;" | 142852.0
+
| style="text-align:right;" | 295266.0
| style="text-align:right;" | 91.0
+
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 189: Line 125:
 
|-
 
|-
 
|-
 
|-
| 2010-2
+
| 2013-2
 +
| style="text-align:right;" | 263433.0
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 218969.47
 +
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 198: Line 143:
 
|-
 
|-
 
|-
 
|-
| 2010-3
+
| 2014-2
 +
| style="text-align:right;" | 193587.85
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-02
 +
| style="text-align:right;" | 26292.04
 +
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 207: Line 161:
 
|-
 
|-
 
|-
 
|-
| 2009-0
+
| 2015-01
 +
| style="text-align:right;" | 29867.96
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 +
| style="text-align:right;" | 28470.17
 +
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 216: Line 179:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 227: Line 196:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 254.0
 
| Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
Line 252: Line 210:
 
| 2011-1
 
| 2011-1
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 1692.0
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 263: Line 221:
 
| 2011-2
 
| 2011-2
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 3611.0
+
| style="text-align:right;" | 3.0
 
| Bbl
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 279: Line 237:
 
|  
 
|  
 
| REUSE FOR HYDRAULIC FRACTURING
 
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2012-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 254.0
 +
| Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
| TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
| PA
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 87.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR HYDRAULIC FRACTURING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 94.5
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123D001X
 +
| TERRAQUA RESOURCE MANAGEMENT
 +
| WILLIAMSPORT
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 219.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 135.5
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 210.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 1871335
 +
| 2010-03-17
 +
| Viol(s) Noted &  Immediately Corrected
 +
|
 +
| 583593
 +
| 78.122 - Drillers Log not on site
 +
|
 +
|-
 +
|-
 +
| 1947395
 +
| 2011-02-03
 +
| No Violations Noted
 +
| Ran pipe to TD in preparation to perforate.  Fracing expected to begin in approx. 3 weeks.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1981278
 +
| 2011-06-02
 +
| Violation(s) Noted
 +
|
 +
| 613771
 +
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 +
| On cut slope fronting onto well pad, there are large cracks and gashes where slope is slumping away.
 +
|-
 +
|-
 +
| 1981278
 +
| 2011-06-02
 +
| Violation(s) Noted
 +
|
 +
| 613772
 +
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 +
| At toe of slope on east side. trench has been breached, silt sock is not in place, stakes have been pulled out of ground and sediment is moving off site.
 +
|-
 +
|-
 +
| 1981278
 +
| 2011-06-02
 +
| Violation(s) Noted
 +
|
 +
| 613773
 +
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 +
| At toe of slope on east side. trench has been breached, silt sock is not in place, stakes have been pulled out of ground and sediment is moving off site.
 +
|-
 +
|-
 +
| 1993526
 +
| 2011-08-05
 +
| Violation(s) Noted
 +
|
 +
| 617043
 +
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 +
| Production fluid leak from containment onto well pad.
 +
|-
 +
|-
 +
| 1993526
 +
| 2011-08-05
 +
| Violation(s) Noted
 +
|
 +
| 617044
 +
| 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution.
 +
| Production fluid leak from containment onto well pad.
 +
|-
 +
|-
 +
| 1993526
 +
| 2011-08-05
 +
| Violation(s) Noted
 +
|
 +
| 617045
 +
| 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith
 +
| No notification was attempted or made.
 +
|-
 +
|-
 +
| 1993526
 +
| 2011-08-05
 +
| Violation(s) Noted
 +
|
 +
| 617191
 +
| 78.57 - Failure to post pit approval number
 +
| Viol Type Description:  Chapter 78.57(a) of the Rules and Regulations of the Environmental Quality Board
 +
|-
 +
|-
 +
| 1993633
 +
| 2011-07-07
 +
| Violation(s) Noted
 +
| This is a follow-up. High conductivity puddles first noted in inspection report # 1981278.
 +
This is a follow-up. High conductivity puddles first noted in inspection report 1981278.
 +
| 617065
 +
| 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances.
 +
| 78.56(a) The operator shall contain pollutional substances. Results of sampling high conductivity puddles showed that  the pollutional substances (water with elevated Sr, Cl, Br, Ba) was not contained.
 +
|-
 +
|-
 +
| 1993633
 +
| 2011-07-07
 +
| Violation(s) Noted
 +
| This is a follow-up. High conductivity puddles first noted in inspection report # 1981278.
 +
This is a follow-up. High conductivity puddles first noted in inspection report 1981278.
 +
| 617066
 +
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 +
| Residual waste was discharged onto the ground.
 +
|-
 +
|-
 +
| 1993633
 +
| 2011-07-07
 +
| Violation(s) Noted
 +
| This is a follow-up. High conductivity puddles first noted in inspection report # 1981278.
 +
This is a follow-up. High conductivity puddles first noted in inspection report 1981278.
 +
| 617067
 +
| 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith
 +
| The department was not notified about these leaks or spills.
 +
|-
 +
|-
 +
| 1997007
 +
| 2011-08-17
 +
| Outstanding Violations - No Viols Req'd
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2001692
 +
| 2011-09-07
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2169735
 +
| 2013-05-23
 +
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 23:02, 26 June 2015

Well Details

Well ID: 37-015-20277
Loading map...
County: Bradford
Municipality: Springfield Township
Operator Name: EOG RESOURCES INC
Well Pad ID: 146991
Farm/Lease Name: HARKNESS 2H
First Permit Date: 2009-05-14
Last Permit Date: 2010-03-16
Spud Date: 2010-02-23
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 11
Latitude: 41.860614
Longitude: -76.677019

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 142852.0 91.0 0.0 0.0 0.0 0.0
2011-2 572481.0 184.0 0.0 0.0 0.0 0.0
2012-1 457302.0 182.0 0.0 0.0 0.0 0.0
2012-2 379068.0 184.0 0.0 0.0 0.0 0.0
2013-1 295266.0 181.0 0.0 0.0 0.0 0.0
2013-2 263433.0 184.0 0.0 0.0 0.0 0.0
2014-1 218969.47 181.0 0.0 0.0 0.0 0.0
2014-2 193587.85 184.0 0.0 0.0 0.0 0.0
2015-02 26292.04 28.0 0.0 0.0 0.0 0.0
2015-01 29867.96 31.0 0.0 0.0 0.0 0.0
2015-03 28470.17 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-1 DRILL CUTTINGS 248.88 Tons LANDFILL 31346244 CASELLA WASTE SYSTEMS PAINTED POST NY
2011-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2011-2 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2012-1 PRODUCED FLUID 490.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 254.0 Bbl STORAGE PENDING DISPOSAL OR REUSE TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE PA
2013-1 PRODUCED FLUID 87.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-1 PRODUCED FLUID 94.5 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123D001X TERRAQUA RESOURCE MANAGEMENT WILLIAMSPORT PA
2013-2 PRODUCED FLUID 219.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 135.5 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 210.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1871335 2010-03-17 Viol(s) Noted & Immediately Corrected 583593 78.122 - Drillers Log not on site
1947395 2011-02-03 No Violations Noted Ran pipe to TD in preparation to perforate. Fracing expected to begin in approx. 3 weeks.
1981278 2011-06-02 Violation(s) Noted 613771 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. On cut slope fronting onto well pad, there are large cracks and gashes where slope is slumping away.
1981278 2011-06-02 Violation(s) Noted 613772 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. At toe of slope on east side. trench has been breached, silt sock is not in place, stakes have been pulled out of ground and sediment is moving off site.
1981278 2011-06-02 Violation(s) Noted 613773 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. At toe of slope on east side. trench has been breached, silt sock is not in place, stakes have been pulled out of ground and sediment is moving off site.
1993526 2011-08-05 Violation(s) Noted 617043 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Production fluid leak from containment onto well pad.
1993526 2011-08-05 Violation(s) Noted 617044 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Production fluid leak from containment onto well pad.
1993526 2011-08-05 Violation(s) Noted 617045 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith No notification was attempted or made.
1993526 2011-08-05 Violation(s) Noted 617191 78.57 - Failure to post pit approval number Viol Type Description: Chapter 78.57(a) of the Rules and Regulations of the Environmental Quality Board
1993633 2011-07-07 Violation(s) Noted This is a follow-up. High conductivity puddles first noted in inspection report # 1981278.

This is a follow-up. High conductivity puddles first noted in inspection report 1981278.

617065 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. 78.56(a) The operator shall contain pollutional substances. Results of sampling high conductivity puddles showed that the pollutional substances (water with elevated Sr, Cl, Br, Ba) was not contained.
1993633 2011-07-07 Violation(s) Noted This is a follow-up. High conductivity puddles first noted in inspection report # 1981278.

This is a follow-up. High conductivity puddles first noted in inspection report 1981278.

617066 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Residual waste was discharged onto the ground.
1993633 2011-07-07 Violation(s) Noted This is a follow-up. High conductivity puddles first noted in inspection report # 1981278.

This is a follow-up. High conductivity puddles first noted in inspection report 1981278.

617067 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith The department was not notified about these leaks or spills.
1997007 2011-08-17 Outstanding Violations - No Viols Req'd
2001692 2011-09-07 No Violations Noted
2169735 2013-05-23 No Violations Noted

For data sources see[3]

References