If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-067-21324 | | Well ID: 34-067-21324 | ||
+ | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.3599835, -81.05945778 | width=100% | height=100% }} | ||
|- | |- | ||
− | | County: | + | | County: [[Harrison County, Ohio|Harrison]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[CHESAPEAKE EXPLORATION LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: 2014-05-15 |
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Well Drilled |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
− | | Latitude: | + | | Latitude: 40.3599835 |
|- | |- | ||
− | | Longitude: | + | | Longitude: -81.05945778 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 63: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
+ | |- | ||
+ | | -1341306860 | ||
+ | | 2014-10-31 | ||
+ | | | ||
+ | | At 10766' and tripping back into the hole after a bottom hole assembly change. No problems were noted at the time of the inspection. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1414391804 | ||
+ | | 2014-10-25 | ||
+ | | | ||
+ | | The rig ran 591' of 13-3/8 casing and the associated float equipment. Schlumberger cemented it with 580sacks of Class A cement. Good cement was returned to the surface. See the casing ticket for the details. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| -271988729 | | -271988729 | ||
| 2014-05-15 | | 2014-05-15 | ||
− | | | + | | |
| Rocky Mountain Drilling has a top hole rig on site to drill and set the conductor casing. Ready later today. | | Rocky Mountain Drilling has a top hole rig on site to drill and set the conductor casing. Ready later today. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -484561075 | ||
+ | | 2014-10-27 | ||
+ | | | ||
+ | | The rig ran 2322' of 9-5/8 casing and the associated float equipment. Schlumberger cemented it with 870 sacks of Class A cement. Good cement was returned to the surface. See the casing ticket for the details. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 574881462 | | 574881462 | ||
| 2014-05-15 | | 2014-05-15 | ||
− | | | + | | |
− | | On the day of my inspection I found that Rocky Mountain Drilling had drilled a 26 | + | | On the day of my inspection I found that Rocky Mountain Drilling had drilled a 26 hole to a depth of 120' with and auger rig. They ran new 20 conductor casing to 120'. Universal Well Services cemented the casing to surface with 245 sacks of class A cement. There were approximately 12 barrels of cement circulated to the surface. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-067-21324 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.3599835,"lon":-81.05945778,"icon":""}]} |
County: Harrison | |
Municipality: | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-05-15 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 40.3599835 | |
Longitude: -81.05945778 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1341306860 | 2014-10-31 | At 10766' and tripping back into the hole after a bottom hole assembly change. No problems were noted at the time of the inspection. | ||||
1414391804 | 2014-10-25 | The rig ran 591' of 13-3/8 casing and the associated float equipment. Schlumberger cemented it with 580sacks of Class A cement. Good cement was returned to the surface. See the casing ticket for the details. | ||||
-271988729 | 2014-05-15 | Rocky Mountain Drilling has a top hole rig on site to drill and set the conductor casing. Ready later today. | ||||
-484561075 | 2014-10-27 | The rig ran 2322' of 9-5/8 casing and the associated float equipment. Schlumberger cemented it with 870 sacks of Class A cement. Good cement was returned to the surface. See the casing ticket for the details. | ||||
574881462 | 2014-05-15 | On the day of my inspection I found that Rocky Mountain Drilling had drilled a 26 hole to a depth of 120' with and auger rig. They ran new 20 conductor casing to 120'. Universal Well Services cemented the casing to surface with 245 sacks of class A cement. There were approximately 12 barrels of cement circulated to the surface. |
For data sources see[1]