X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21324

Well Details

Well ID: 34-067-21324
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Archer Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000814
Farm/Lease Name: HELEN HALTER 23-11-5
License Status: Producing
License Date: 2014-04-30
Spud Date: 2014-05-15
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-11-02
Well Total Depth: 17078.00 ft
Configuration: Horizontal
Latitude: 40.350000
Longitude: -81.050000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-04-30 Proposed Formations:POINT PLEASANT, Issued Date:4/30/2014, Expired Date:4/29/2016 12:00:00 PM, Drilling unit acres:606.64, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2014-11-02
Correction to Well 2015-02-06 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-07-06
Construction Permit Expires 2016-04-29
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-07-06 8533 16850 750
8533 16850 750
8533 16850 750

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/04/2015 01/16/2015 8218 7,188,260.0 563124

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 84.5818 0
A264, B244, B317, J218, J475, J580,

J609, J610, L058, Acid, Hydrochloric 15pct, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural Hexadec-1-ene 629-73-2 0 0.00002000 0
1-Octadecene (C18) 112-88-9 0 0.00001000 0
Diammonium peroxidisulphate 7727-54-0 0.02 0.00291 0
Urea 57-13-6 0 0.00034 0
Copper(II) sulfate 7758-98-7 0 0 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.03 0.00523 0
Potassium chloride (impurity) 7447-40-7 0.01 0.00106 0
Calcium chloride 10043-52-4 0.25 0.03768 0
Trisodium ortho phosphate 7601-54-9 0 0.00072 0
Non-crystalline silica (impurity) 7631-86-9 0 0.00033 0
Glutaraldehyde 111-30-8 0.04 0.00568 0
Sodium erythorbate 6381-77-7 0 0.00043 0
Fatty acids, tall-oil 61790-12-3 0 0.00026 0
poly(tetrafluoroethylene) 9002-84-0 0 0.00001000 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0 0.00058 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0 0 0
Glycerol 56-81-5 0.05 0.00748 0
Formaldehyde 50-00-0 0 0 0
Sodium chloride (impurity) 7647-14-5 0 0.00057 0
Guar gum 9000-30-0 0.66 0.10191 0
Potassium hydroxide 1310-58-3 0.06 0.00847 0
Ammonium sulfate 7783-20-2 0.05 0.00709 0
Sodium sulfate 7757-82-6 0 0.00008000 0
Octamethylcyclotetrasiloxane 556-67-2 0 0 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0 0.0001 0
Decamethyl cyclopentasiloxane 541-02-6 0 0 0
Methanol 67-56-1 0 0.00037 0
Crystalline silica 14808-60-7 98 15.0515 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0 0.00056 0
Hydrochloric acid 7647-01-0 0.72 0.11126 0
Potassium borate 1332-77-0 0.15 0.02293 0
Dimethyl siloxanes and silicones 63148-62-9 0 0 0
Propargyl alcohol 107-19-7 0 0.00007000 0
Ethylene Glycol 107-21-1 0 0.0002 0
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen

phosphate), sodium salt

68171-29-9 0.01 0.00163 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0 0.00001000 0
2-propenamid 79-06-1 0 0.00002000 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0 0.00022 0
Magnesium silicate hydrate (talc) 14807-96-6 0 0.00002000 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-01-16 H2O 8 725 Bbl 330260 Schlumberger STAGE 30/30

25 SHOTS

2015-01-04 H2O 15 1252 Bbl 336910 Schlumberger STAGE 1/30

25 SHOTS STAGES 2-29 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC 557900 23634 216
2016 CHESAPEAKE EXPLORATION LLC 481175 14720 366
2017 CHESAPEAKE EXPLORATION LLC 323488 7625 344
2018 CHESAPEAKE EXPLORATION LLC 137038 3854 295
2019 CHESAPEAKE EXPLORATION LLC 48655 1349 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC Brine 19394 216
2016 CHESAPEAKE EXPLORATION LLC Brine 5082 366
2017 CHESAPEAKE EXPLORATION LLC Brine 3245 344
2018 CHESAPEAKE EXPLORATION LLC Brine 6619 295
2019 CHESAPEAKE EXPLORATION LLC Brine 1847 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1208825130 2016-1-11 0:00: PL No Violations 0.50
-1341306860 2014-10-31 0:00 DD No Violations
-1712413964 2016-2-19 0:00: PL No Violations 0.50
-271988729 2014-5-15 0:00: DD No Violations 1.00
-283899915 2019-8-22 0:00: PW No Violations 0.60
-484561075 2014-10-27 0:00 CS No Violations
0271988729 2014-05-15 Drill / Deepen / Reopen No Violations Rocky Mountain Drilling has a top hole rig on site to drill and set the conductor casing. Ready later today.
0484561075 2014-10-27 Casing String Witnessed No Violations The rig ran 2322 of 9-5/8 casing and the associated float equipment. Schlumberger cemented it with 870 sacks of Class A cement. Good cement was returned to the surface. See the casing ticket for the details.
0574881462 2014-05-15 Casing String Witnessed No Violations On the day of my inspection I found that Rocky Mountain Drilling had drilled a 26 hole to a depth of 120 with and auger rig. They ran new 20 conductor casing to 120. Universal Well Services cemented the casing to surface with 245 sacks of class A cement. There were approximately 12 barrels of cement circulated to the surface.
1208825130 2016-01-11 Preliminary Restoration No Violations On the day of my inspection, I witnessed the well was equipped with a production tree. Production equipment for the well included a sand trap and a gas production unit. Production equipment that was shared with permitted wells 34067212010000, 34067212020000, 34067212030000, 34067212040000, 34067212050000, 3406721206000, and 34067213250000 included a vapor recovery system, a gas compressor, a flare stack and 12-400 bbl. tanks that where placed inside proper containment. The site passed preliminary restoration in accordance with ORC 1509.072 A.
1341306860 2014-10-31 Drill / Deepen / Reopen No Violations At 10766 and tripping back into the hole after a bottom hole assembly change. No problems were noted at the time of the inspection.
1414391804 2014-10-25 Casing String Witnessed No Violations The rig ran 591 of 13-3/8 casing and the associated float equipment. Schlumberger cemented it with 580sacks of Class A cement. Good cement was returned to the surface. See the casing ticket for the details.
1547647931 2019-9-13 0:00: PW No Violations 1.00
1712413964 2016-02-19 Preliminary Restoration No Violations I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are producing off of natural reservoir pressure. With the exception of permitted well no. 34067212030000, which is utilizing a plunger lift system to produce. RBDMS production records indicate that the well is in producing order.
The production equipment on the pad consists of the following:

12 400 bbl. Production tanks 8 Producing wells 8 Sand separators

1 Horizontal heater-treater that was disconnected 1 combustor 1 low pressure separator/ Vapor recovery system 1 compressor There was approximately 2 to 3 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A.

574881462 2014-5-15 0:00: CS No Violations

For data sources see[10]

References