| Well ID: 34-163-20947
 
| Well ID: 34-163-20947
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.2447230071, -82.3022209427 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.24466777, -82.30244725 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Vinton County, Ohio|Vinton]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BANCEQUITY PETROLEUM CORP]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2012-02-20
 
| Spud Date: 2012-02-20
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.2447230071
+
| Latitude: 39.24466777
 
|-
 
|-
| Longitude: -82.3022209427
+
| Longitude: -82.30244725
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 94:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1287647759
 
| -1287647759
 
| 2012-02-21
 
| 2012-02-21
|
+
|  
 
| Checked on rig status.  Total depth was at 796 feet.  Surface casing would  be cemented later that evening.
 
| Checked on rig status.  Total depth was at 796 feet.  Surface casing would  be cemented later that evening.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1331144981
 +
| 2012-02-28
 +
|
 +
| Checked status of pit closure.  Pits had been emptied of fluid.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1580242960
 
| -1580242960
 
| 2012-03-08
 
| 2012-03-08
|
+
|  
 
| Met with Mr. Mike McPeak to pick up frac ticket.
 
| Met with Mr. Mike McPeak to pick up frac ticket.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1591907510
 
| -1591907510
 
| 2012-02-22
 
| 2012-02-22
|
+
|  
 
| Witnessed running and cementing of the production string.  Good circulation was achieved.  Accompanied by Inspector Kip Thompson.
 
| Witnessed running and cementing of the production string.  Good circulation was achieved.  Accompanied by Inspector Kip Thompson.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -807176186
 
| 2012-03-05
 
|
 
| Witnessed beginning stages of frac job.
 
|
 
|
 
|
 
|-
 
|-
 
| 1331144981
 
| 2012-02-28
 
|
 
| Checked status of pit closure.  Pits had been emptied of fluid.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1687164155
 
| 1687164155
 
| 2012-08-02
 
| 2012-08-02
|
+
|  
 
| No violations were noted at the time of inspection.  Accompanied by inspector Morgan Button.
 
| No violations were noted at the time of inspection.  Accompanied by inspector Morgan Button.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1786901377
 
| 1786901377
 
| 2012-06-14
 
| 2012-06-14
|
+
|  
 
| Site has been graded, seeded and strawed.  Well was pumping at the time of inspection.
 
| Site has been graded, seeded and strawed.  Well was pumping at the time of inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1788135389
 
| 1788135389
 
| 2012-04-18
 
| 2012-04-18
|
+
|  
 
| Preliminary restoration not yet completed.  Grading needs to be done on the site.  Well has been completed and was pumping at the time of inspection.  Talked to Mr. Mike McPeak about it and he plans on working on it this week.
 
| Preliminary restoration not yet completed.  Grading needs to be done on the site.  Well has been completed and was pumping at the time of inspection.  Talked to Mr. Mike McPeak about it and he plans on working on it this week.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1897810311
 
| 1897810311
 
| 2012-02-21
 
| 2012-02-21
|
+
|  
 
| Witnessed cementing of surface casing.  Good circulation was achieved and good returns were witnessed.  Cement fell back after the job was finished.  It was topped off, and it stayed up after that.
 
| Witnessed cementing of surface casing.  Good circulation was achieved and good returns were witnessed.  Cement fell back after the job was finished.  It was topped off, and it stayed up after that.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -807176186
 +
| 2012-03-05
 +
|
 +
| Witnessed beginning stages of frac job.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 23:59, 14 July 2015

Well Details

Well ID: 34-163-20947
Loading map...
County: Vinton
Municipality:
Operator Name: BANCEQUITY PETROLEUM CORP
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-02-20
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.24466777
Longitude: -82.30244725

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 0.0 0.0
2012-0 0.0 0.0
2013-0 0.0 0.0
2014-0 0.0 365.0 0.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1287647759 2012-02-21 Checked on rig status. Total depth was at 796 feet. Surface casing would be cemented later that evening.
1331144981 2012-02-28 Checked status of pit closure. Pits had been emptied of fluid.
-1580242960 2012-03-08 Met with Mr. Mike McPeak to pick up frac ticket.
-1591907510 2012-02-22 Witnessed running and cementing of the production string. Good circulation was achieved. Accompanied by Inspector Kip Thompson.
1687164155 2012-08-02 No violations were noted at the time of inspection. Accompanied by inspector Morgan Button.
1786901377 2012-06-14 Site has been graded, seeded and strawed. Well was pumping at the time of inspection.
1788135389 2012-04-18 Preliminary restoration not yet completed. Grading needs to be done on the site. Well has been completed and was pumping at the time of inspection. Talked to Mr. Mike McPeak about it and he plans on working on it this week.
1897810311 2012-02-21 Witnessed cementing of surface casing. Good circulation was achieved and good returns were witnessed. Cement fell back after the job was finished. It was topped off, and it stayed up after that.
-807176186 2012-03-05 Witnessed beginning stages of frac job.

For data sources see[2]