If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-167-29729 | | Well ID: 34-167-29729 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.56289552, -81.50685636 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Washington County, Ohio|Washington]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[PDC ENERGY INC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2013-10-02 | | Spud Date: 2013-10-02 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.56289552 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.50685636 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | style="text-align:right;" | 11475.0 | ||
+ | | style="text-align:right;" | 17.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 389.0 | ||
+ | | style="text-align:right;" | 17.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | style="text-align:right;" | 86571.0 | ||
+ | | style="text-align:right;" | 63.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 3435.0 | ||
+ | | style="text-align:right;" | 63.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-3 | ||
+ | | style="text-align:right;" | 90247.0 | ||
+ | | style="text-align:right;" | 92.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 1984.0 | ||
+ | | style="text-align:right;" | 92.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-4 | ||
+ | | style="text-align:right;" | 61499.0 | ||
+ | | style="text-align:right;" | 92.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 980.0 | ||
+ | | style="text-align:right;" | 92.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-1 | ||
+ | | style="text-align:right;" | 47136.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 638.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 103: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
− | | | + | | 1318624657 |
− | | 2013- | + | | 2013-10-02 |
− | + | | | |
− | + | | Witnessed the running and cementing of the conductor pipe. 100 ft of 30 in pipe was ran and cemented to surface. Good circulation and good returns were observed at the surface. | |
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | Witnessed the | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 1382620984 | | 1382620984 | ||
| 2013-10-23 | | 2013-10-23 | ||
− | | | + | | |
| Drilling rig is rigging up. Spoke with company man Mr. Dave Grey. He was hoping to get started drilling by Friday 10/25/13. | | Drilling rig is rigging up. Spoke with company man Mr. Dave Grey. He was hoping to get started drilling by Friday 10/25/13. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1384954688 | | 1384954688 | ||
| 2013-11-18 | | 2013-11-18 | ||
− | | | + | | |
| Total depth of the well during the time of inspection was 2100 ft. They were running a 12.25 in bit. I spoke with Mr. Dave Grey on site and picked up paperwork for the 13.375 in. casing cement job. | | Total depth of the well during the time of inspection was 2100 ft. They were running a 12.25 in bit. I spoke with Mr. Dave Grey on site and picked up paperwork for the 13.375 in. casing cement job. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1386597356 | | 1386597356 | ||
| 2013-12-05 | | 2013-12-05 | ||
− | | | + | | |
| Drilling has been completed on this well. Total depth is 12,502 ft. Company is running sweeps to stabilize the hole before they run pipe. From 8047 ft. to 12,502 ft the hole is 8.5 in. in diameter. The azimuth is 334 degrees and the inclination is 89.31 degrees as per the last downhole survey. The third party gas reading was at 1590 units. | | Drilling has been completed on this well. Total depth is 12,502 ft. Company is running sweeps to stabilize the hole before they run pipe. From 8047 ft. to 12,502 ft the hole is 8.5 in. in diameter. The azimuth is 334 degrees and the inclination is 89.31 degrees as per the last downhole survey. The third party gas reading was at 1590 units. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1835399769 | | 1835399769 | ||
| 2013-12-09 | | 2013-12-09 | ||
− | | | + | | |
− | | Picked up paperwork for the cementing of the 5.5 | + | | Picked up paperwork for the cementing of the 5.5 casing that was ran over the weekend. I received a job log, P-R graph, and a pipe tally. Spoke with company man on site. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1954889617 | ||
+ | | 2013-12-02 | ||
+ | | | ||
+ | | Total depth at the time of inspection was 8559 ft. Drillers started the curve at 7099 ft, and landed it at 7973 ft. It was reported to me as per the last survey, the inclination was 93.3 degrees and the azimuth was 334.2 degrees. Drilling was halted due to top drive issues. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -2042398831 | ||
+ | | 2013-11-25 | ||
+ | | | ||
+ | | Witnessed the cementing of the 9.625 in casing. Good circulation, and good returns were witnessed at the surface. Due to cold weather, the cement contractor experienced technical difficulties. Valves and the manifold were frozen. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -2063686733 | ||
+ | | 2013-10-21 | ||
+ | | | ||
+ | | Drilling rig was being assembled at the time of inspection. I called Mr. Catlan Ball from PDC energy and spoke with him about this well and others. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -321525386 | ||
+ | | 2014-07-14 | ||
+ | | | ||
+ | | Upon inspection, it was observed that a vegetative cover has been established throughout the limits of disturbance for this pad location. Any and all drilling equipment has been removed from the location, and any and all pits used for drilling activities have been filled. This satisfies the requirements for the preliminary restoration. Accompanied on this inspection by DOGRM Engineer Jason Simmerman, and DOGRM Engineering Technicians Andy Thomas and Anthony Carson. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 561409863 | | 561409863 | ||
| 2014-03-27 | | 2014-03-27 | ||
− | | | + | | |
| Checked on the status of flowback operations. There are numerous 500 barrel frac tanks on site. Spoke with contractor on site. There is no pollution or contamination on site. Well is equipped with tubing and a rabbit catcher. | | Checked on the status of flowback operations. There are numerous 500 barrel frac tanks on site. Spoke with contractor on site. There is no pollution or contamination on site. Well is equipped with tubing and a rabbit catcher. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -828044432 | ||
+ | | 2013-11-12 | ||
+ | | | ||
+ | | Witnessed cementing of the surface casing. Company was having trouble running casing due to parted conductor pipe. It was parted at 86 ft. down. The company welded straps on the collars of the pipe to ease it past the parted section of pipe. I tested the mix water for the cement job and it showed no chlorides were present. Good circulation and good returns were observed at the surface. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-167-29729 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.56289552,"lon":-81.50685636,"icon":""}]} |
County: Washington | |
Municipality: | |
Operator Name: PDC ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-10-02 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.56289552 | |
Longitude: -81.50685636 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-1 | 11475.0 | 17.0 | 389.0 | 17.0 | ||
2014-2 | 86571.0 | 63.0 | 3435.0 | 63.0 | ||
2014-3 | 90247.0 | 92.0 | 1984.0 | 92.0 | ||
2014-4 | 61499.0 | 92.0 | 980.0 | 92.0 | ||
2015-1 | 47136.0 | 90.0 | 638.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1318624657 | 2013-10-02 | Witnessed the running and cementing of the conductor pipe. 100 ft of 30 in pipe was ran and cemented to surface. Good circulation and good returns were observed at the surface. | ||||
1382620984 | 2013-10-23 | Drilling rig is rigging up. Spoke with company man Mr. Dave Grey. He was hoping to get started drilling by Friday 10/25/13. | ||||
1384954688 | 2013-11-18 | Total depth of the well during the time of inspection was 2100 ft. They were running a 12.25 in bit. I spoke with Mr. Dave Grey on site and picked up paperwork for the 13.375 in. casing cement job. | ||||
1386597356 | 2013-12-05 | Drilling has been completed on this well. Total depth is 12,502 ft. Company is running sweeps to stabilize the hole before they run pipe. From 8047 ft. to 12,502 ft the hole is 8.5 in. in diameter. The azimuth is 334 degrees and the inclination is 89.31 degrees as per the last downhole survey. The third party gas reading was at 1590 units. | ||||
1835399769 | 2013-12-09 | Picked up paperwork for the cementing of the 5.5 casing that was ran over the weekend. I received a job log, P-R graph, and a pipe tally. Spoke with company man on site. | ||||
-1954889617 | 2013-12-02 | Total depth at the time of inspection was 8559 ft. Drillers started the curve at 7099 ft, and landed it at 7973 ft. It was reported to me as per the last survey, the inclination was 93.3 degrees and the azimuth was 334.2 degrees. Drilling was halted due to top drive issues. | ||||
-2042398831 | 2013-11-25 | Witnessed the cementing of the 9.625 in casing. Good circulation, and good returns were witnessed at the surface. Due to cold weather, the cement contractor experienced technical difficulties. Valves and the manifold were frozen. | ||||
-2063686733 | 2013-10-21 | Drilling rig was being assembled at the time of inspection. I called Mr. Catlan Ball from PDC energy and spoke with him about this well and others. | ||||
-321525386 | 2014-07-14 | Upon inspection, it was observed that a vegetative cover has been established throughout the limits of disturbance for this pad location. Any and all drilling equipment has been removed from the location, and any and all pits used for drilling activities have been filled. This satisfies the requirements for the preliminary restoration. Accompanied on this inspection by DOGRM Engineer Jason Simmerman, and DOGRM Engineering Technicians Andy Thomas and Anthony Carson. | ||||
561409863 | 2014-03-27 | Checked on the status of flowback operations. There are numerous 500 barrel frac tanks on site. Spoke with contractor on site. There is no pollution or contamination on site. Well is equipped with tubing and a rabbit catcher. | ||||
-828044432 | 2013-11-12 | Witnessed cementing of the surface casing. Company was having trouble running casing due to parted conductor pipe. It was parted at 86 ft. down. The company welded straps on the collars of the pipe to ease it past the parted section of pipe. I tested the mix water for the cement job and it showed no chlorides were present. Good circulation and good returns were observed at the surface. |
For data sources see[2]