X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-167-29729

Well Details

Well ID: 34-167-29729
Loading map...
Country: United States
State: Ohio
County: Washington
Municipality: Adams Township
Operator Name: UTICA RESOURCE OPERATING LLC
Well Pad ID: US-OH-000672
Farm/Lease Name: GARVIN
License Status: Producing
License Date: 2013-08-23
Spud Date: 2013-10-02
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2014-03-02
Well Total Depth: 12459.00 ft
Configuration: Horizontal
Latitude: 39.560000
Longitude: -81.500000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-08-23 Proposed Formations:POINT PLEASANT, Issued Date:8/23/2013, Expired Date:8/23/2015 12:00:00 PM, Drilling unit acres:574, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2014-01-17 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 431.0 ACRES.
Reached Total Depth 2014-03-02

-1/22/19 ALE.

Completion Report Received 2015-07-23

-1/22/19 ALE.

Construction Permit Expires 2015-08-23

-1/22/19 ALE.

Change of Owner 2018-05-04 Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC
Record Last Modified 2019-01-22

-1/22/19 ALE.

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/20/2014 02/12/2014 0 6,408,420.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 15% HCL, Slickwater, WF120, YF120Flex Schlumberger Corrosion Inhibitor, Surfactant , Bactericide (Myacide GA25), Scale Inhibitor, AntiFoam Agent, Acid, Breaker, Gelling Agent, Friction Reducer, Crossli Vinylidene chloride/methylacrylate copolymer 25038-72-6 0.00624 0.00093 0
Guar gum 9000-30-0 0.56053 0.08323 0
Decamethyl cyclopentasiloxane 541-02-6 0.00001000 0 0
Propan-2-ol 67-63-0 0.09008 0.01338 0
Octamethylcyclotetrasiloxane 556-67-2 0.00001000 0 0
Alkenes, C>10 a- 64743-02-8 0.00031 0.00005000 0
Potassium chloride 7447-40-7 0.00079 0.00012 0
Crystalline silica 14808-60-7 97.7776 14.5185 0
Calcium chloride 10043-52-4 0.01338 0.00199 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0.00016 0.00002000 0
Dimethyl siloxanes and silicones 63148-62-9 0.00007000 0.00001000 0
Urea 57-13-6 0.00516 0.00077 0
Castor oil, ethoxylated 61791-12-6 0.02386 0.00354 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0 0
Magnesium silicate hydrate (talc) 14807-96-6 0.00019 0.00003000 0
Trisodium ortho phosphate 7601-54-9 0.00283 0.00042 0
Water (Including Mix Water Supplied by Client)* NA 0 85.1515 0
Prop-2-yn-1-ol 107-19-7 0.00046 0.00007000 0
Diammonium peroxidisulphate 7727-54-0 0.05291 0.00786 0
Glutaraldehyde 111-30-8 0.04584 0.00681 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0.00069 0.0001 0
Sodium sulfate 7757-82-6 0.03204 0.00476 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0.00148 0.00022 0
Propane-1,2-diol 57-55-6 0.06158 0.00914 0
Polypropylene glycol 25322-69-4 0.00083 0.00012 0
Sodium erythorbate 6381-77-7 0.00247 0.00037 0
2,2`-(Ethylenedioxy)diethanol (triethylene glycol) 112-27-6 0.05459 0.00811 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0.00001000 0 0
Potassium borate 1332-77-0 0.08639 0.01283 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.07843 0.01165 0
Sodium chloride 7647-14-5 0.00024 0.00004000 0
Alcohols, C12-15 linear, ethoxylated 68131-39-5 0.08347 0.01239 0
Glycerol 56-81-5 0.02817 0.00418 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0.0084 0.00125 0
Ethanol, 2,2',2-nitrilotris-,

1,1',1-tris(dihydrogen phosphate), sodium salt

68171-29-9 0.00644 0.00096 0
Hydrogen chloride 7647-01-0 0.77772 0.11548 0
poly(tetrafluoroethylene) 9002-84-0 0.00008000 0.00001000 0
Ammonium sulfate 7783-20-2 0.07412 0.01101 0
Sodium hydroxide 1310-73-2 0.00001000 0 0
Non-crystalline silica 7631-86-9 0.00228 0.00034 0
Orange, sweet, extact 8028-48-6 0.1201 0.01783 0
Ethane-1,2-diol 107-21-1 0.00081 0.00012 0
Methanol 67-56-1 0.00245 0.00036 0
Fatty acids, tall-oil 61790-12-3 0.0018 0.00027 0
Potassium hydroxide 1310-58-3 0.03193 0.00474 0

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 PDC ENERGY INC 249792 6788 264
2015 PDC ENERGY INC 155325 1817 363
2016 PDC ENERGY INC 94915 967 365
2017 PDC ENERGY INC 74996 651 358
2018 UTICA RESOURCE OPERATING LLC 48639 550 273
2019 UTICA RESOURCE OPERATING LLC 13961 155 90

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 PDC ENERGY INC Brine 28626 264
2015 PDC ENERGY INC Brine 8941 363
2016 PDC ENERGY INC Brine 3560 365
2017 PDC ENERGY INC Brine 3207 358
2018 UTICA RESOURCE OPERATING LLC Brine 1361 273
2019 UTICA RESOURCE OPERATING LLC Brine 458 90

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1954889617 2013-12-2 0:00: DD No Violations 1.00
-2042398831 2013-11-25 0:00 DD No Violations 7.00
-2063686733 2013-10-21 0:00 DD No Violations 1.50
-321525386 2014-7-14 0:00: PL No Violations 0.50
-54146010 2016-1-26 0:00: PW No Violations 1.00
-828044432 2013-11-12 0:00 DD No Violations 5.50
0054146010 2016-01-26 Production Wells No Violations Upon inspection, it was observed that this well is currently in production. Pressure on the production tubing read 280 psi. No violations noted. I was accompanied on this inspection by DOGRM Emergency Response Coordinator Nathan Lane.
0321525386 2014-07-14 Preliminary Restoration No Violations Upon inspection, it was observed that a vegetative cover has been established throughout the limits of disturbance for this pad location. Any and all drilling equipment has been removed from the location, and any and all pits used for drilling activities have been filled. This satisfies the requirements for the preliminary restoration. Accompanied on this inspection by DOGRM Engineer Jason Simmerman, and DOGRM Engineering Technicians Andy Thomas and Anthony Carson.
0561409863 2014-03-27 Drill / Deepen / Reopen No Violations Checked on the status of flowback operations. There are numerous 500 barrel frac tanks on site. Spoke with contractor on site. There is no pollution or contamination on site. Well is equipped with tubing and a rabbit catcher.
0828044432 2013-11-12 Drill / Deepen / Reopen No Violations Witnessed cementing of the surface casing. Company was having trouble running casing due to parted conductor pipe. It was parted at 86 ft. down. The company welded straps on the collars of the pipe to ease it past the parted section of pipe. I tested the mix water for the cement job and it showed no chlorides were present. Good circulation and good returns were observed at the surface.
0842756662 2015-06-22 Production Wells No Violations Upon inspection, it was observed that this well is currently producing. The well is equipped with a standard production tree and is producing on the 5.5 production casing as well as the 2.875 tubing. Gauges on the well read 200 psi on the tubing and 481 psi on the casing. The tank battery consists of 6 400 bbl production tanks and 3 large mechanical separators. There is also 3 flow control separators on location as well as a large degassing tower. There is a metal, poly lined containment dike around the tank battery. Legible and correct ID information is present on the tanks as well as the entry to the lease road. No violations were observed.
1318624657 2013-10-02 Drill / Deepen / Reopen No Violations Witnessed the running and cementing of the conductor pipe. 100 ft of 30 in pipe was ran and cemented to surface. Good circulation and good returns were observed at the surface.
1382620984 2013-10-23 Drill / Deepen / Reopen No Violations Drilling rig is rigging up. Spoke with company man Mr. Dave Grey. He was hoping to get started drilling by Friday 10/25/13.
1384954688 2013-11-18 Drill / Deepen / Reopen No Violations Total depth of the well during the time of inspection was 2100 ft. They were running a 12.25 in bit. I spoke with Mr. Dave Grey on site and picked up paperwork for the 13.375 in. casing cement job.
1386597356 2013-12-05 Drill / Deepen / Reopen No Violations Drilling has been completed on this well. Total depth is 12,502 ft. Company is running sweeps to stabilize the hole before they run pipe. From 8047 ft. to 12,502 ft the hole is 8.5 in. in diameter. The azimuth is 334 degrees and the inclination is 89.31 degrees as per the last downhole survey. The third party gas reading was at 1590 units.
1403360305 2017-11-27 Production Wells No Violations The inspection this day found that the well is producing using a plunger lift system. The valves are open on the wellhead and gas could be heard flowing through the well at the time of inspection. The tank battery for this well is equipped with six (6) 410 barrel tanks with identification posted near the tank battery. There are no issues to report and the well is in production.
1835399769 2013-12-09 Drill / Deepen / Reopen No Violations Picked up paperwork for the cementing of the 5.5 casing that was ran over the weekend. I received a job log, P-R graph, and a pipe tally. Spoke with company man on site.
1954889617 2013-12-02 Drill / Deepen / Reopen No Violations Total depth at the time of inspection was 8559 ft. Drillers started the curve at 7099 ft, and landed it at 7973 ft. It was reported to me as per the last survey, the inclination was 93.3 degrees and the azimuth was 334.2 degrees. Drilling was halted due to top drive issues.
2042398831 2013-11-25 Drill / Deepen / Reopen No Violations Witnessed the cementing of the 9.625 in casing. Good circulation, and good returns were witnessed at the surface. Due to cold weather, the cement contractor experienced technical difficulties. Valves and the manifold were frozen.
2063686733 2013-10-21 Drill / Deepen / Reopen No Violations Drilling rig was being assembled at the time of inspection. I called Mr. Catlan Ball from PDC energy and spoke with him about this well and others.
561409863 2014-3-27 0:00: DD No Violations 0.50
842756662 2015-6-22 0:00: PW No Violations 0.50

For data sources see[8]

References