If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-155-23999 | | Well ID: 34-155-23999 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.19072333, -80.99028591 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Trumbull County, Ohio|Trumbull]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[OHIO VALLEY ENERGY SYSTEM CORP]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2009-06-01 | | Spud Date: 2009-06-01 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.19072333 |
|- | |- | ||
− | | Longitude: -80. | + | | Longitude: -80.99028591 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2009-0 | ||
+ | | style="text-align:right;" | 197.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-0 | ||
+ | | style="text-align:right;" | 2847.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 216.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-0 | ||
+ | | style="text-align:right;" | 1573.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 95.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | style="text-align:right;" | 1519.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 1123.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 92.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 938.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 52.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 112: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1333636956 | | -1333636956 | ||
| 2012-05-18 | | 2012-05-18 | ||
− | | | + | | |
| On 5/18/2012, I conducted a production well inspection status check. My inspection found a ditch dug on the west wall on the dike surrounding the tank batter. I called Don Nething from Ohio Valley Energy Systems at 330-283-1861 to inform him of the violation and the need for an immediated repair. Don informed me the well tender would be sent out that day (05/18/2012) to correct the violation. I will perform a follow-up inspection on 5/21/2012. | | On 5/18/2012, I conducted a production well inspection status check. My inspection found a ditch dug on the west wall on the dike surrounding the tank batter. I called Don Nething from Ohio Valley Energy Systems at 330-283-1861 to inform him of the violation and the need for an immediated repair. Don informed me the well tender would be sent out that day (05/18/2012) to correct the violation. I will perform a follow-up inspection on 5/21/2012. | ||
− | | | + | | |
− | | 9-9- | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 1343249567 | ||
+ | | 2012-07-02 | ||
+ | | | ||
+ | | On 7/2/2012, I completed a production well Preliminary Restoration inspection. My inspection found this well equipped with a plunger lift (rabbit) system. The tank battery contains one 100 barrel oil storage tank, with the proper identification posted, one 50 barrel brine tank, and a separator. The pits have been filled and fencing has been placed around the tank battery and well head. The well meets the Ohio Revised Code (ORC) Chapter 1509:9-9-5 requirements. Preliminary Restoration is passed. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -277466294 | | -277466294 | ||
| 2012-05-21 | | 2012-05-21 | ||
− | | | + | | |
| On 5/21/2012, I completed a follow-up inspection. My inspection found the dike had been repaired. Inspection passed. | | On 5/21/2012, I completed a follow-up inspection. My inspection found the dike had been repaired. Inspection passed. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-155-23999 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.19072333,"lon":-80.99028591,"icon":""}]} |
County: Trumbull | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEM CORP | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-06-01 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.19072333 | |
Longitude: -80.99028591 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2009-0 | 197.0 | 0.0 | ||||
2010-0 | 2847.0 | 216.0 | ||||
2011-0 | 1573.0 | 95.0 | ||||
2012-0 | 1519.0 | 0.0 | ||||
2013-0 | 1123.0 | 92.0 | ||||
2014-0 | 938.0 | 365.0 | 52.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1333636956 | 2012-05-18 | On 5/18/2012, I conducted a production well inspection status check. My inspection found a ditch dug on the west wall on the dike surrounding the tank batter. I called Don Nething from Ohio Valley Energy Systems at 330-283-1861 to inform him of the violation and the need for an immediated repair. Don informed me the well tender would be sent out that day (05/18/2012) to correct the violation. I will perform a follow-up inspection on 5/21/2012. | ||||
1343249567 | 2012-07-02 | On 7/2/2012, I completed a production well Preliminary Restoration inspection. My inspection found this well equipped with a plunger lift (rabbit) system. The tank battery contains one 100 barrel oil storage tank, with the proper identification posted, one 50 barrel brine tank, and a separator. The pits have been filled and fencing has been placed around the tank battery and well head. The well meets the Ohio Revised Code (ORC) Chapter 1509:9-9-5 requirements. Preliminary Restoration is passed. | ||||
-277466294 | 2012-05-21 | On 5/21/2012, I completed a follow-up inspection. My inspection found the dike had been repaired. Inspection passed. |
For data sources see[2]