X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-22988"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-22988
 
| Well ID: 34-153-22988
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.2859482793, -81.4280536679 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.28576445, -81.42838611 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Summit County, Ohio|Summit]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[TRANSCONTINENTAL O & G]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2009-07-20
 
| Spud Date: 2009-07-20
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.2859482793
+
| Latitude: 41.28576445
 
|-
 
|-
| Longitude: -81.4280536679
+
| Longitude: -81.42838611
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 3990.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 174.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 7812.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 216.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 5135.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 136.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 3979.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 123.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 3691.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 103:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -1415966745
 
| 2009-08-06
 
|
 
| The pits have been solidified and graded over. The well is scheduled to be fraced next week.
 
|
 
|
 
|
 
|-
 
|-
 
| -1868533033
 
| 2009-09-03
 
|
 
| No change in the status of this well. The site has been rought graded, the pits have been solidified and closed and the tank battery is under construction. The well has not been fraced.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 106817803
 
| 106817803
 
| 2010-07-23
 
| 2010-07-23
|
+
|  
 
| Preliminary restoration is approved.
 
| Preliminary restoration is approved.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1249938029
 
| 1249938029
 
| 2009-07-31
 
| 2009-07-31
|
+
|  
 
| Status check inspection found the pits fenced, lined and in good condition with sufficient freeboard. Solidification is scheduled for 08/04.
 
| Status check inspection found the pits fenced, lined and in good condition with sufficient freeboard. Solidification is scheduled for 08/04.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1250086058
 
| 1250086058
 
| 2009-08-04
 
| 2009-08-04
|
+
|  
 
| Transcontinental was on site to solidify the drilling pits. The air can tractor trailer dust application method caused a large portion of the affected area to be covered. I talked to Cal Marks about changing the application method to control the dust. A dump truck will be used when the pits at the Ferrara well are solidified.
 
| Transcontinental was on site to solidify the drilling pits. The air can tractor trailer dust application method caused a large portion of the affected area to be covered. I talked to Cal Marks about changing the application method to control the dust. A dump truck will be used when the pits at the Ferrara well are solidified.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1275665626
 
| 1275665626
 
| 2010-06-02
 
| 2010-06-02
|
+
|  
 
| The well is in production and the tank battery and wellhead are fenced. Preliminary restoration is due now. The site still needs a considerable amout of grading before seed and mulch. If the work is not completed by the end of June, a NOV will be issued.
 
| The well is in production and the tank battery and wellhead are fenced. Preliminary restoration is due now. The site still needs a considerable amout of grading before seed and mulch. If the work is not completed by the end of June, a NOV will be issued.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1415966745
 +
| 2009-08-06
 +
|
 +
| The pits have been solidified and graded over. The well is scheduled to be fraced next week.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1868533033
 +
| 2009-09-03
 +
|
 +
| No change in the status of this well. The site has been rought graded, the pits have been solidified and closed and the tank battery is under construction. The well has not been fraced.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 2076416839
 
| 2076416839
 
| 2009-07-20
 
| 2009-07-20
|
+
|  
 
| Capstar Drilling Rig 4 is moving on location and should spud later tonight. The permit and ID sign are posted as required. No violations at this time.
 
| Capstar Drilling Rig 4 is moving on location and should spud later tonight. The permit and ID sign are posted as required. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 560190326
 
| 560190326
 
| 2009-07-23
 
| 2009-07-23
|
+
|  
 
| Capstar is drilling ahead. The pits are fenced, lined and in good condition. No violations at this time.
 
| Capstar is drilling ahead. The pits are fenced, lined and in good condition. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 21:35, 15 July 2015

Well Details

Well ID: 34-153-22988
Loading map...
County: Summit
Municipality:
Operator Name: TRANSCONTINENTAL O & G
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2009-07-20
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.28576445
Longitude: -81.42838611

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 3990.0 174.0
2011-0 7812.0 216.0
2012-0 5135.0 136.0
2013-0 3979.0 123.0
2014-0 3691.0 365.0 0.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
106817803 2010-07-23 Preliminary restoration is approved.
1249938029 2009-07-31 Status check inspection found the pits fenced, lined and in good condition with sufficient freeboard. Solidification is scheduled for 08/04.
1250086058 2009-08-04 Transcontinental was on site to solidify the drilling pits. The air can tractor trailer dust application method caused a large portion of the affected area to be covered. I talked to Cal Marks about changing the application method to control the dust. A dump truck will be used when the pits at the Ferrara well are solidified.
1275665626 2010-06-02 The well is in production and the tank battery and wellhead are fenced. Preliminary restoration is due now. The site still needs a considerable amout of grading before seed and mulch. If the work is not completed by the end of June, a NOV will be issued.
-1415966745 2009-08-06 The pits have been solidified and graded over. The well is scheduled to be fraced next week.
-1868533033 2009-09-03 No change in the status of this well. The site has been rought graded, the pits have been solidified and closed and the tank battery is under construction. The well has not been fraced.
2076416839 2009-07-20 Capstar Drilling Rig 4 is moving on location and should spud later tonight. The permit and ID sign are posted as required. No violations at this time.
560190326 2009-07-23 Capstar is drilling ahead. The pits are fenced, lined and in good condition. No violations at this time.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.