X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22988

Well Details

Well ID: 34-153-22988
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Twinsburg Township
Operator Name: TRANSCONTINENTAL OIL & GAS INC
Well Pad ID:
Farm/Lease Name: SUTKOWSKI/HUTCHINSON
License Status: Producing
License Date: 2008-09-02
Spud Date: 2009-07-20
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2009-07-24
Well Total Depth: 4048.00 ft
Configuration: Vertical
Latitude: 41.280000
Longitude: -81.420000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-11-29 Proposed Formations:CLINTON, Issued Date:11/29/2006, Expired Date:11/29/2007 6:00:00 AM, Drilling unit acres:20.849, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2008-09-02 Proposed Formations:CLINTON, Issued Date:9/2/2008, Expired Date:9/2/2009 6:00:00 AM, Drilling unit acres:20.849, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2009-07-24
Construction Permit Expires 2009-09-02
Completion Report Received 2009-12-22
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-03-17 3808 3877 25
3808 3877 25
3808 3877 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
N2 0 169 Mscf 42300

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 TRANSCONTINENTAL OIL & GAS INC 3990.00 174.00 365
2011 TRANSCONTINENTAL OIL & GAS INC 7812.00 216.00 365
2012 TRANSCONTINENTAL OIL & GAS INC 5135.00 136.00 366
2013 TRANSCONTINENTAL OIL & GAS INC 3979.00 123.00 365
2014 TRANSCONTINENTAL OIL & GAS INC 3691.00 0.00 365
2015 TRANSCONTINENTAL OIL & GAS INC 3473.00 116.00 365
2016 TRANSCONTINENTAL OIL & GAS INC 3328.00 73.00 365
2017 TRANSCONTINENTAL OIL & GAS INC 2985.00 85.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 TRANSCONTINENTAL OIL & GAS INC Brine 144 365
2011 TRANSCONTINENTAL OIL & GAS INC Brine 75 365
2012 TRANSCONTINENTAL OIL & GAS INC Brine 85 366
2013 TRANSCONTINENTAL OIL & GAS INC Brine 99 365
2014 TRANSCONTINENTAL OIL & GAS INC Brine 40 365
2015 TRANSCONTINENTAL OIL & GAS INC Brine 77 365
2016 TRANSCONTINENTAL OIL & GAS INC Brine 35 365
2017 TRANSCONTINENTAL OIL & GAS INC Brine 82 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1415966745 2009-8-6 0:00:0 DD No Violations
-1868533033 2009-9-3 0:00:0 DD No Violations
0106817803 2010-07-23 Preliminary Restoration No Violations Preliminary restoration is approved.
0560190326 2009-07-23 Drill / Deepen / Reopen No Violations Capstar is drilling ahead. The pits are fenced, lined and in good condition. No violations at this time.
106817803 2010-7-23 0:00: PL No Violations
1249938029 2009-07-31 Drill / Deepen / Reopen No Violations Status check inspection found the pits fenced, lined and in good condition with sufficient freeboard. Solidification is scheduled for 08/04.
1250086058 2009-08-04 Drill / Deepen / Reopen No Violations Transcontinental was on site to solidify the drilling pits. The air can tractor trailer dust application method caused a large portion of the affected area to be covered. I talked to Cal Marks about changing the application method to control the dust. A dump truck will be used when the pits at the Ferrara well are solidified.
1275665626 2010-06-02 Production Wells No Violations The well is in production and the tank battery and wellhead are fenced. Preliminary restoration is due now. The site still needs a considerable amout of grading before seed and mulch. If the work is not completed by the end of June, a NOV will be issued.
1415966745 2009-08-06 Drill / Deepen / Reopen No Violations The pits have been solidified and graded over. The well is scheduled to be fraced next week.
1868533033 2009-09-03 Drill / Deepen / Reopen No Violations No change in the status of this well. The site has been rought graded, the pits have been solidified and closed and the tank battery is under construction. The well has not been fraced.
2076416839 2009-07-20 Drill / Deepen / Reopen No Violations Capstar Drilling Rig 4 is moving on location and should spud later tonight. The permit and ID sign are posted as required. No violations at this time.
560190326 2009-7-23 0:00: DD No Violations

For data sources see[9]

References