| Well ID: 34-155-24061
 
| Well ID: 34-155-24061
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.1910460785, -80.6130069729 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.19104608, -80.61300697 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Trumbull County, Ohio|Trumbull]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[PAC DRILLING LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-01-17
 
| Spud Date: 2013-01-17
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.1910460785
+
| Latitude: 41.19104608
 
|-
 
|-
| Longitude: -80.6130069729
+
| Longitude: -80.61300697
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 10633.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 875.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 12318.0
 +
| style="text-align:right;" | 230.0
 +
|
 +
|
 +
| style="text-align:right;" | 531.0
 +
| style="text-align:right;" | 230.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 76:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1273753632
 
| -1273753632
 
| 2013-03-04
 
| 2013-03-04
|
+
|  
 
| My inspection found the pit filled and all debris removed.  The tank battery was in place and contained one, 210 barrel production tank, one, 50 barrel brine tank, and a separator.  The safety equipment was installed on the production tank.  There was a plug on the load line.  A frac tank was on location.  Restoration operations were still in progress.
 
| My inspection found the pit filled and all debris removed.  The tank battery was in place and contained one, 210 barrel production tank, one, 50 barrel brine tank, and a separator.  The safety equipment was installed on the production tank.  There was a plug on the load line.  A frac tank was on location.  Restoration operations were still in progress.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -1964055280
 
| 2013-01-15
 
|
 
| My inspection found the well pad construction complete.  The pits will be dug later in the day.  Wildcat rig will be moving onto location starting 1/16/2012.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1356701364
 
| 1356701364
 
| 2012-12-28
 
| 2012-12-28
|
+
|  
 
| My inspection found the lease road and well pad under construction.
 
| My inspection found the lease road and well pad under construction.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1357574800
 
| 1357574800
 
| 2013-01-07
 
| 2013-01-07
|
+
|  
 
| My inspection found PAC Drilling still working on the lease road and well pad.
 
| My inspection found PAC Drilling still working on the lease road and well pad.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1358505995
 
| 1358505995
 
| 2013-01-18
 
| 2013-01-18
|
+
|  
 
| I witnessed Universal Well Service cement the conductor casing for PAC Drilling.  Hole #1 was drilled to 84' by Wildcat Drilling.  The conductor was set to a depth of 72' with 12' foot of rat hole.  Universal establish circulation with 8 barrels of fresh water, mixed 10 barrels of gel with unicele, and pumped 21 barrels of Type 1 3% Calcium 1/2 lb/sk Unicele cement.  They displaced with 8 barrels of fresh water to a depth of 64'.  There was 5 barrels of good cement return to surface.  The cement held at surface for 20 minutes.  The glacial till depth was estimated at 18'.
 
| I witnessed Universal Well Service cement the conductor casing for PAC Drilling.  Hole #1 was drilled to 84' by Wildcat Drilling.  The conductor was set to a depth of 72' with 12' foot of rat hole.  Universal establish circulation with 8 barrels of fresh water, mixed 10 barrels of gel with unicele, and pumped 21 barrels of Type 1 3% Calcium 1/2 lb/sk Unicele cement.  They displaced with 8 barrels of fresh water to a depth of 64'.  There was 5 barrels of good cement return to surface.  The cement held at surface for 20 minutes.  The glacial till depth was estimated at 18'.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1864017697
 
| 1864017697
 
| 2013-10-01
 
| 2013-10-01
|
+
|  
 
| My inspection found the site graded and seeded.  Vegetation was well established.  The proper safety equipment was installed on the production tank.  The dike met containment requirements.  The tank battery contained a 210 barrel production tank, a 50 barrel  brine tank, and a separator.  There were plugs on the load lines.  The proper identification signs were posted.  The lease road was in good condition.  The pits were filled and closed.  The proper drainage and erosion controls were in place.
 
| My inspection found the site graded and seeded.  Vegetation was well established.  The proper safety equipment was installed on the production tank.  The dike met containment requirements.  The tank battery contained a 210 barrel production tank, a 50 barrel  brine tank, and a separator.  There were plugs on the load lines.  The proper identification signs were posted.  The lease road was in good condition.  The pits were filled and closed.  The proper drainage and erosion controls were in place.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1964055280
 +
| 2013-01-15
 +
|
 +
| My inspection found the well pad construction complete.  The pits will be dug later in the day.  Wildcat rig will be moving onto location starting 1/16/2012.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 302502706
 
| 302502706
 
| 2013-10-01
 
| 2013-10-01
|
+
|  
 
| My inspection found the site graded and seeded.  Vegetation was well established.  The tank battery contained a 210 barrel production tank, a 50 barrel brine tank, and a separator.  There was a 7 day production chart in the separator.  The well was equipped with a plunger lift unit.  All debris has been removed.  The pits were filled and closed.  The proper identification sign was posted.  The proper safety equipment was installed on the production tank.
 
| My inspection found the site graded and seeded.  Vegetation was well established.  The tank battery contained a 210 barrel production tank, a 50 barrel brine tank, and a separator.  There was a 7 day production chart in the separator.  The well was equipped with a plunger lift unit.  All debris has been removed.  The pits were filled and closed.  The proper identification sign was posted.  The proper safety equipment was installed on the production tank.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 06:24, 16 July 2015

Well Details

Well ID: 34-155-24061
Loading map...
County: Trumbull
Municipality:
Operator Name: PAC DRILLING LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-01-17
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.19104608
Longitude: -80.61300697

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 10633.0 875.0
2014-0 12318.0 230.0 531.0 230.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1273753632 2013-03-04 My inspection found the pit filled and all debris removed. The tank battery was in place and contained one, 210 barrel production tank, one, 50 barrel brine tank, and a separator. The safety equipment was installed on the production tank. There was a plug on the load line. A frac tank was on location. Restoration operations were still in progress.
1356701364 2012-12-28 My inspection found the lease road and well pad under construction.
1357574800 2013-01-07 My inspection found PAC Drilling still working on the lease road and well pad.
1358505995 2013-01-18 I witnessed Universal Well Service cement the conductor casing for PAC Drilling. Hole #1 was drilled to 84' by Wildcat Drilling. The conductor was set to a depth of 72' with 12' foot of rat hole. Universal establish circulation with 8 barrels of fresh water, mixed 10 barrels of gel with unicele, and pumped 21 barrels of Type 1 3% Calcium 1/2 lb/sk Unicele cement. They displaced with 8 barrels of fresh water to a depth of 64'. There was 5 barrels of good cement return to surface. The cement held at surface for 20 minutes. The glacial till depth was estimated at 18'.
1864017697 2013-10-01 My inspection found the site graded and seeded. Vegetation was well established. The proper safety equipment was installed on the production tank. The dike met containment requirements. The tank battery contained a 210 barrel production tank, a 50 barrel brine tank, and a separator. There were plugs on the load lines. The proper identification signs were posted. The lease road was in good condition. The pits were filled and closed. The proper drainage and erosion controls were in place.
-1964055280 2013-01-15 My inspection found the well pad construction complete. The pits will be dug later in the day. Wildcat rig will be moving onto location starting 1/16/2012.
302502706 2013-10-01 My inspection found the site graded and seeded. Vegetation was well established. The tank battery contained a 210 barrel production tank, a 50 barrel brine tank, and a separator. There was a 7 day production chart in the separator. The well was equipped with a plunger lift unit. All debris has been removed. The pits were filled and closed. The proper identification sign was posted. The proper safety equipment was installed on the production tank.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.