X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-24061

Well Details

Well ID: 34-155-24061
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Hubbard Township
Operator Name: PAC DRILLING LLC
Well Pad ID:
Farm/Lease Name: LIPKA
License Status: Producing
License Date: 2012-12-14
Spud Date: 2013-01-17
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2013-01-22
Well Total Depth: 5364.00 ft
Configuration: Vertical
Latitude: 41.190000
Longitude: -80.610000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-12-11 Proposed Formations:CLINTON-MEDINA, Issued Date:12/11/2012, Expired Date:12/11/2014 12:00:00 PM, Drilling unit acres:40.92, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2012-12-14 Proposed Formations:CLINTON-MEDINA, Issued Date:12/14/2012, Expired Date:12/14/2014 12:00:00 PM, Drilling unit acres:40.92, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2013-01-22
Completion Report Received 2013-05-20
Construction Permit Expires 2013-12-14
Record Last Modified 2018-02-08

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-05-21 5050 5150 52
5050 5150 52
5050 5150 52

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-01-30 H2O 20 3240 Bbl 51400 Universal Well Services Inc.
2013-01-30 ACID 0 500 Gal 0 Universal Well Services Inc. On 1/30/2013, I witnessed Universal stimulate the Lipka Well for PAC Drilling. PAC treated with 500 gallons of acid for one hour. The bore hole was loaded up with 3,196 gallons of fresh water. Universal start pumping at 20 bbl/min and increased the rate 10 bbl/min topping at 50 bbl/min. A total amount of freshwater pumped was 135,450 gallons and 25 balls were dropped.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 PAC DRILLING LLC 10633.00 875.00 240
2014 PAC DRILLING LLC 12318.00 531.00 230
2015 PAC DRILLING LLC 10585.00 391.00 360
2016 PAC DRILLING LLC 7733.00 288.00 359
2017 PAC DRILLING LLC 6442.00 198.00 359
2018 PAC DRILLING LLC 6208.00 286.00 359

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 PAC DRILLING LLC Brine 300 240
2014 PAC DRILLING LLC Brine 72 230
2015 PAC DRILLING LLC Brine 58 360
2016 PAC DRILLING LLC Brine 0 359
2017 PAC DRILLING LLC Brine 0 359
2018 PAC DRILLING LLC Brine 14 359

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1130074626 2017-8-21 0:00: UP No Violations
-1157765868 2016-10-27 0:00 UP No Violations 0.50
-122605235 2017-3-7 0:00:0 UP No Violations 1.00
-1273753632 2013-3-4 0:00:0 UP No Violations 0.50
-1537106041 2019-8-15 0:00: UP No Violations
-1964055280 2013-1-15 0:00: DD No Violations 0.50
-726280296 2019-3-1 0:00:0 UP No Violations
0122605235 2017-03-07 UrbanProduction Wells No Violations

-up lines have plugs, but no locks. The required urban safety equipment has been installed on the production tank. The hatch on top of the production tank is open. An identification sign is posted at the tank battery. The identification sign is missing the required information per 1501:9-9-05(E)(1)(a--site inspection due to the hidden location. The access road is in good repair with no gate at the entrance. The gate was not waived during the pre-site inspection.

PAC needs to: 1) Correct the identification sign to be in compliance with 1501:9-9-05(E)(1)(a-e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 2) Install a gate with the proper identification sign at the access road entrance per 1501:9-9-05(E)(1)(a-f) & 1501:9-9-05(E)(2)(c). 3) Secure the hatch on the production take as required by 1501:9-9-05(E)(4)(d). 4) Install locks on the pick-up lines or remove the valve handles as required by 1501:9-9-05(E)(3).

The equipment on the pad consists of the following:



0302502706 2013-10-01 UrbanPreliminary Restoration No Violations My inspection found the site graded and seeded. Vegetation was well established. The tank battery contained a 210 barrel production tank, a 50 barrel brine tank, and a separator. There was a 7 day production chart in the separator. The well was equipped with a plunger lift unit. All debris has been removed. The pits were filled and closed. The proper identification sign was posted. The proper safety equipment was installed on the production tank.
0726280296 2019-03-01 UrbanProduction Wells Violations Noted I conducted an inspection on this well site location. At the time of this inspection, the well was equipped with a plunger lift assembly and in production. The gate valve on the tubing and the valve on the 2 inch flow line was open. There is identification posted at the well. The diked tank battery has one 210 BBL production tank, one 50 BBL poly brine tank and a mechanical separator. The valves on the separator were open and the chart on the separator showed production. The tank valve and pick-up lines have plugs and their handles have been removed. The required urban safety equipment has been installed on the production tank. The hatch on top of the production tank is not secured. An identification sign was posted at the tank battery, but needs amended with the required information per 1501:9-9-05(E)(1)(a-e). There is no landscaping at the tank battery and well; however, they are both located over 680 feet from Warner Road and hidden by trees and vegetation. Fencing around the well and tank battery was waived on the pre-site inspection. The lease access stable, however the access gate has not been installed. The gate was not waived during the pre-site inspection.

PAC needs to: 1) Correct the identification sign to be in compliance with 1501:9-9-05(E)(1)(a-e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 2) Install a gate with the proper identification sign at the access road entrance per 1501:9-9-05(E)(1)(a-f) & 1501:9-9-05(E)(2)(c). 3) Secure the hatch on the production take as required by 1501:9-9-05(E)(4)(d). 4) Install the landscaping as required per 1501:9-9-05(E)(6)(a-c).

1130074626 2017-08-21 UrbanProduction Wells No Violations At the time of my inspection there were no violations.
1157765868 2016-10-27 UrbanProduction Wells No Violations


PAC Drilling will: Install locks on the load lines or remove the valve handles

The equipment on the site consists of the following:



1273753632 2013-03-04 UrbanProduction Wells No Violations My inspection found the pit filled and all debris removed. The tank battery was in place and contained one, 210 barrel production tank, one, 50 barrel brine tank, and a separator. The safety equipment was installed on the production tank. There was a plug on the load line. A frac tank was on location. Restoration operations were still in progress.
1356701364 2012-12-28 Drill / Deepen / Reopen No Violations My inspection found the lease road and well pad under construction.
1357574800 2013-01-07 Drill / Deepen / Reopen No Violations My inspection found PAC Drilling still working on the lease road and well pad.
1358505995 2013-01-18 Drill / Deepen / Reopen No Violations I witnessed Universal Well Service cement the conductor casing for PAC Drilling. Hole #1 was drilled to 84 by Wildcat Drilling. The conductor was set to a depth of 72 with 12 foot of rat hole. Universal establish circulation with 8 barrels of fresh water, mixed 10 barrels of gel with unicele, and pumped 21 barrels of Type 1 3% Calcium 1/2 lb/sk Unicele cement. They displaced with 8 barrels of fresh water to a depth of 64. There was 5 barrels of good cement return to surface. The cement held at surface for 20 minutes. The glacial till depth was estimated at 18.
1587737479 2020-4-24 0:00: UP No Violations
1599231913 2020-9-4 0:00:0 UP No Violations
1864017697 2013-10-01 UrbanPreliminary Restoration No Violations My inspection found the site graded and seeded. Vegetation was well established. The proper safety equipment was installed on the production tank. The dike met containment requirements. The tank battery contained a 210 barrel production tank, a 50 barrel brine tank, and a separator. There were plugs on the load lines. The proper identification signs were posted. The lease road was in good condition. The pits were filled and closed. The proper drainage and erosion controls were in place.
1964055280 2013-01-15 Drill / Deepen / Reopen No Violations My inspection found the well pad construction complete. The pits will be dug later in the day. Wildcat rig will be moving onto location starting 1/16/2012.
302502706 2013-10-1 0:00: UL No Violations 0.50

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0726280296 US-OH-128282 2019-03-18 9-05E1 ID (a-i)
0726280296 US-OH-128283 2019-03-18 9-05E2 FENCING (a-d)
0726280296 US-OH-128284 2019-03-18 9-05E6 LANDSCAPING (a-c)

For data sources see[9]

References