X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30671"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30671
 
| Well ID: 37-005-30671
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.622905, -79.361166 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.622906, -79.361167 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Armstrong County, Pennsylvania|Armstrong]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[South Bend Township, Armstrong County, Pennsylvania|South Bend Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Armstrong_County,_Pennsylvania|Armstrong]]
 +
|-
 +
| Municipality: [[South Bend Township,_Armstrong_County,_Pennsylvania|South Bend Township]]
 
|-
 
|-
 
| Operator Name: [[PENNECO OIL CO INC]]
 
| Operator Name: [[PENNECO OIL CO INC]]
Line 15: Line 19:
 
| Farm/Lease Name: G TOY 2
 
| Farm/Lease Name: G TOY 2
 
|-
 
|-
| First Permit Date: 2010-06-21
+
| License Status: Active
|-
 
| Last Permit Date: 2010-06-21
 
 
|-
 
|-
| Spud Date: 2010-10-06
+
| Spud Date: 10/06/2010
 
|-
 
|-
| Unconventional: No
+
| Permit Date: 6/21/2010
 
|-
 
|-
| Horizontal: No
+
| Unconventional Well: N
 
|-
 
|-
| Well Status: INACTIVE
+
| Configuration: Vertical Well
 
|-
 
|-
| Violations: 0
+
| Latitude: 40.622906
|-
 
| Latitude: 40.622905
 
|-
 
| Longitude: -79.361166
 
 
|-
 
|-
 +
| Longitude: -79.361167
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2010-0
+
| 2010
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 3,637.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2011-0
+
| 2012
| style="text-align:right;" | 3637.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 334.0
+
| style="text-align: right;" | 2,436.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 366
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 1,778.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2012-0
+
| 2014
| style="text-align:right;" | 2436.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 366.0
+
| style="text-align: right;" | 1,443.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 1,326.24
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2013-0
+
| 2016
| style="text-align:right;" | 1778.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 1,201.91
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 366
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2017
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 1,082.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2014-0
+
| 2018
| style="text-align:right;" | 1443.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 1,090.13
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 480.0
+
| style="text-align: right;" | 480.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,520.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 55.0
+
| style="text-align: right;" | 55.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-0
 
| 2011-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 65.0
+
| style="text-align: right;" | 65.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-0
 
| 2012-0
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 80.0
+
| style="text-align: right;" | 80.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
+
|-
| FRANKLIN
+
| 2017-0
| PA
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 55.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1918565
 
| 1918565
| 2010-10-07
+
| Primary Facility
 +
| 10/07/2010
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling was ongoing at the time of the inspection.  Below grade pit located onsite and it had more than the required two feet of lined freeboard.  Site erosion controls had been implemented as outlined in the E&S plan.  Noted in the E&S plan there were inadequate erosion controls.  Specifically the plan did not utilize an effective method to deal with runoff on the access road and the short length of road and proximity to the paved road necessitated the rocking of the entire access road.  Contacted operator representative Robert Carnahan regarding this matter.  Mr. Carnahan called WQS Higgins back and stated that the road will be regraded to inslope to the cut side, a collection ditch rocked with rip-rap for stability will be implemented in the next few days.  These actions should sufficiently address the access road concerns noted by WQS Higgins.
 
| Drilling was ongoing at the time of the inspection.  Below grade pit located onsite and it had more than the required two feet of lined freeboard.  Site erosion controls had been implemented as outlined in the E&S plan.  Noted in the E&S plan there were inadequate erosion controls.  Specifically the plan did not utilize an effective method to deal with runoff on the access road and the short length of road and proximity to the paved road necessitated the rocking of the entire access road.  Contacted operator representative Robert Carnahan regarding this matter.  Mr. Carnahan called WQS Higgins back and stated that the road will be regraded to inslope to the cut side, a collection ditch rocked with rip-rap for stability will be implemented in the next few days.  These actions should sufficiently address the access road concerns noted by WQS Higgins.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1920402
 
| 1920402
| 2010-10-08
+
| Primary Facility
 +
| 10/08/2010
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| drilling - awaiting cement/E&S ok/ID&pit ok
 
| drilling - awaiting cement/E&S ok/ID&pit ok
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1947311
 
| 1947311
| 2011-02-03
+
| Primary Facility
 +
| 02/03/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Drilling had been completed, well appeared to be equipped for production.  Brine tank located onsite and appeared to be in sound condition. Site had been regraded.  Observed no erosion or sedimentation issues in relation to the access road or well-site.  The operator should insure that the vegetative cover take hold and achieves the 70% uniform coverage criteria.  In addition the operator should have the well tagged with the appropriate permit number as soon as possible.  
+
| Drilling had been completed, well appeared to be equipped for production.  Brine tank located onsite and appeared to be in sound condition. Site had been regraded.  Observed no erosion or sedimentation issues in relation to the access road or well-site.  The operator should insure that the vegetative cover take hold and achieves the 70% uniform coverage criteria.  In addition the operator should have the well tagged with the appropriate permit number as soon as possible.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1961081
 
| 1961081
| 2011-03-25
+
| Primary Facility
 +
| 03/25/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling complete. Well equipped for production. Site reclaimation underway. No open pits.
 
| Drilling complete. Well equipped for production. Site reclaimation underway. No open pits.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2125187
 
| 2125187
| 2012-12-21
+
| Primary Facility
 +
| 12/21/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Well appeared to be equipped for production at the time of the inspection.  Brine tank located onsite and it appeared to be in sound condition.  Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
| Well appeared to be equipped for production at the time of the inspection.  Brine tank located onsite and it appeared to be in sound condition.  Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
|  
+
|-
|  
+
| 2440529
|  
+
| Primary Facility
 +
| 2016-01-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well tagged-in production. Annulus open. Well head casing- meter set-100 bbl tank-equipment ok.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 15:18, 13 July 2019

Well Details

Well ID: 37-005-30671
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Bend Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: G TOY 2
License Status: Active
Spud Date: 10/06/2010
Permit Date: 6/21/2010
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.622906
Longitude: -79.361167

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 0.00 0.00 0.00
2011 PENNECO OIL CO INC 3,637.00 334 0.00 0.00
2012 PENNECO OIL CO INC 2,436.00 366 0.00 0.00
2013 PENNECO OIL CO INC 1,778.00 365 0.00 0.00
2014 PENNECO OIL CO INC 1,443.00 365 0.00 0.00
2015 PENNECO OIL CO INC 1,326.24 365 0.00 0.00
2016 PENNECO OIL CO INC 1,201.91 366 0.00 0.00
2017 PENNECO OIL CO INC 1,082.00 365 0.00 0.00
2018 PENNECO OIL CO INC 1,090.13 365 0.00 0.00

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-0 Drilling Fluid Waste (in Barrels) 480.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-0 Fracing Fluid Waste (in Barrels) 1,520.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-0 Produced Fluid (in Barrels) 55.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011-0 Produced Fluid (in Barrels) 65.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012-0 Produced Fluid (in Barrels) 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2017-0 Produced Fluid (in Barrels) RWC 802 55.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1918565 Primary Facility 10/07/2010 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Site erosion controls had been implemented as outlined in the E&S plan. Noted in the E&S plan there were inadequate erosion controls. Specifically the plan did not utilize an effective method to deal with runoff on the access road and the short length of road and proximity to the paved road necessitated the rocking of the entire access road. Contacted operator representative Robert Carnahan regarding this matter. Mr. Carnahan called WQS Higgins back and stated that the road will be regraded to inslope to the cut side, a collection ditch rocked with rip-rap for stability will be implemented in the next few days. These actions should sufficiently address the access road concerns noted by WQS Higgins.
1920402 Primary Facility 10/08/2010 Drilling/Alteration No Violations Noted drilling - awaiting cement/E&S ok/ID&pit ok
1947311 Primary Facility 02/03/2011 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and appeared to be in sound condition. Site had been regraded. Observed no erosion or sedimentation issues in relation to the access road or well-site. The operator should insure that the vegetative cover take hold and achieves the 70% uniform coverage criteria. In addition the operator should have the well tagged with the appropriate permit number as soon as possible.
1961081 Primary Facility 03/25/2011 Routine/Complete Inspection No Violations Noted Drilling complete. Well equipped for production. Site reclaimation underway. No open pits.
2125187 Primary Facility 12/21/2012 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2440529 Primary Facility 2016-01-13 Routine/Complete Inspection No Violations Noted Well tagged-in production. Annulus open. Well head casing- meter set-100 bbl tank-equipment ok.

For data sources see[6]

References