If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30671 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.622906,"lon":-79.361167,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Bend Township | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: G TOY 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-06-21 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.622906 | |
Longitude: -79.361167 |
Date | Event |
---|---|
2010-06-21 | New Permit Application |
2010-10-06 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 3,637.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 2,436.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 1,778.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 1,443.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 1,326.24 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 1,201.91 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 1,082.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 1,090.13 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 1,004.36 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | Fracing Fluid Waste | 1,520.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PENNECO OIL CO INC | Produced Fluid | 55.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PENNECO OIL CO INC | Drilling Fluid Waste | 480.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Produced Fluid | 65.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2012 | PENNECO OIL CO INC | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2017 | PENNECO OIL CO INC | Produced Fluid | 55.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1918565 | Primary Facility | 2010-10-07 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Site erosion controls had been implemented as outlined in the E&S plan. Noted in the E&S plan there were inadequate erosion controls. Specifically the plan did not utilize an effective method to deal with runoff on the access road and the short length of road and proximity to the paved road necessitated the rocking of the entire access road. Contacted operator representative Robert Carnahan regarding this matter. Mr. Carnahan called WQS Higgins back and stated that the road will be regraded to inslope to the cut side, a collection ditch rocked with rip-rap for stability will be implemented in the next few days. These actions should sufficiently address the access road concerns noted by WQS Higgins. |
1920402 | Primary Facility | 2010-10-08 | Drilling/Alteration | No Violations Noted | drilling - awaiting cement/E&S ok/ID&pit ok |
1947311 | Primary Facility | 2011-02-03 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and appeared to be in sound condition. Site had been regraded. Observed no erosion or sedimentation issues in relation to the access road or well-site. The operator should insure that the vegetative cover take hold and achieves the 70% uniform coverage criteria. In addition the operator should have the well tagged with the appropriate permit number as soon as possible. |
1961081 | Primary Facility | 2011-03-25 | Routine/Complete Inspection | No Violations Noted | Drilling complete. Well equipped for production. Site reclaimation underway. No open pits. |
2125187 | Primary Facility | 2012-12-21 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2440529 | Primary Facility | 2016-01-13 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus open. Well head casing- meter set-100 bbl tank-equipment ok. |
For data sources see[7]