| Well ID: 37-111-20313
 
| Well ID: 37-111-20313
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.743447, -79.35768 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.743447, -79.357681 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Somerset County, Pennsylvania|Somerset]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Addison Township, Somerset County, Pennsylvania|Addison Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC]]
+
| County: [[Somerset_County,_Pennsylvania|Somerset]]
 
|-
 
|-
| Well Pad ID: [[149069|149069]]
+
| Municipality: [[Addison Township,_Somerset_County,_Pennsylvania|Addison Township]]
 
|-
 
|-
| Farm/Lease Name: PMG ALLEN UNIT 4H
+
| Operator Name: [[LPR ENERGY LLC]]
 
|-
 
|-
| First Permit Date: 2012-07-23
+
| Well Pad ID: [[149069]]
 
|-
 
|-
| Last Permit Date: 2012-07-23
+
| Farm/Lease Name: PMG ALLEN UNIT 4H
 
|-
 
|-
| Spud Date: 2013-03-15
+
| License Status: Active
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 03/15/2013
 
|-
 
|-
| Configuration: Horizontal
+
| Permit Date: 7/23/2012
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 0
+
| Configuration: Horizontal Well
 
|-
 
|-
 
| Latitude: 39.743447
 
| Latitude: 39.743447
 
|-
 
|-
| Longitude: -79.35768
+
| Longitude: -79.357681
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2012-2
+
| 2012
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-1
+
| 2014
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 237,190.00
 +
| style="text-align: right;" | 343
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-2
+
| 2016
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 147,659.92
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 101,186.00
 +
| style="text-align: right;" | 354
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-1
+
| 2018
| style="text-align:right;" | 0.0
+
| [[LPR ENERGY LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 123,707.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 363
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2019
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 26,677.00
 +
| style="text-align: right;" | 79
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-2
+
|}
| style="text-align:right;" | 0.0
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 0.0
+
| title =Oil and Gas Production Reports
| style="text-align:right;" | 0.0
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| style="text-align:right;" | 0.0
+
| date = 2019-03-31
| style="text-align:right;" | 0.0
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| style="text-align:right;" | 0.0
+
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 
|-
 
|-
 +
| 16APRU
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 106.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2015-02
+
| 16AUGU
| style="text-align:right;" | 4925.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 28.0
+
| style="text-align: right;" | 172.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 16DECU
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 135.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2015-01
+
| 16JULU
| style="text-align:right;" | 15307.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 9.0
+
| style="text-align: right;" | 353.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 16JUNU
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 131.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2015-03
+
| 16MAYU
| style="text-align:right;" | 16099.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 22.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 16NOVU
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 344.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 16-Jan
+
| 16OCTU
| style="text-align:right;" | 17606.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 150.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 16SEPU
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 145.00 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 
|-
 
|-
| 15-Aug
+
| 2013-1
| style="text-align:right;" | 19321.0
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 492.74 Tons
| style="text-align:right;" | 0.0
+
| LANDFILL
| style="text-align:right;" | 0.0
+
| 100419
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2013-1
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 1,575.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 
|-
 
|-
| 15DECU
+
| 2013-1
| style="text-align:right;" | 16671.0
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 88.00 Bbl
| style="text-align:right;" | 0.0
+
| REUSE OTHER THAN ROAD SPREADING
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15JULU
 
| style="text-align:right;" | 23468.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15MAYU
 
| style="text-align:right;" | 29213.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15OCTU
 
| style="text-align:right;" | 20415.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15OCTU
 
| style="text-align:right;" | 20415.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 15SEPU
 
| style="text-align:right;" | 20037.0
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 16APRU
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 16APRU
 
| style="text-align:right;" | 8470.13
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 16FEBU
 
| style="text-align:right;" | 14789.0
 
| style="text-align:right;" | 29.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 16MARU
 
| style="text-align:right;" | 15751.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| style="text-align:right;" | 0.0
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 200.00 Bbl
| style="text-align:right;" | 0.0
+
| REUSE OTHER THAN ROAD SPREADING
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| style="text-align:right;" | 0.0
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 472.78 Tons
| style="text-align:right;" | 0.0
+
| LANDFILL
| style="text-align:right;" | 0.0
+
| 100172
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| style="text-align:right;" | 0.0
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 11.67 Bbl
| style="text-align:right;" | 0.0
+
| REUSE OTHER THAN ROAD SPREADING
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2014-2
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 2,727.67 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
 
| 2014-2
 
| 2014-2
| style="text-align:right;" | 0.0
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 28.33 Bbl
| style="text-align:right;" | 0.0
+
| REUSE OTHER THAN ROAD SPREADING
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2014-2
 +
| Fracturing Fluid Waste (in Tons)
 +
| style="text-align: right;" | 58.23 Tons
 +
| LANDFILL
 +
| 76-00-08
 
|-
 
|-
| 2015-01
+
| 2014-2
| style="text-align:right;" | 15307.0
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 9.0
+
| style="text-align: right;" | 70.83 Bbl
| style="text-align:right;" | 0.0
+
| REUSE OTHER THAN ROAD SPREADING
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2015-1
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 4,304.17 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| 2015-02
+
| 2015-1
| style="text-align:right;" | 4925.0
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 28.0
+
| style="text-align: right;" | 13.33 Bbl
| style="text-align:right;" | 0.0
+
| REUSE OTHER THAN ROAD SPREADING
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2015-1
 +
| Fracturing Fluid Waste (in Tons)
 +
| style="text-align: right;" | 23.48 Tons
 +
| LANDFILL
 +
| 100592
 
|-
 
|-
| 2015-04
+
| 2015-1
| style="text-align:right;" | 31341.0
+
| Fracturing Fluid Waste (in Tons)
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 0.11 Tons
| style="text-align:right;" | 0.0
+
| STORAGE PENDING DISPOSAL OR REUSE
| style="text-align:right;" | 0.0
+
| MID0209062814
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2015-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 16.67 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| 2015-06
+
| 2015-1
| style="text-align:right;" | 23669.0
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 5,986.17 Bbl
| style="text-align:right;" | 0.0
+
| REUSE OTHER THAN ROAD SPREADING
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2015-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 13.33 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| 2015-11
+
| 2015-2
| style="text-align:right;" | 16724.0
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 4,930.67 Bbl
| style="text-align:right;" | 0.0
+
| REUSE OTHER THAN ROAD SPREADING
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-09
 
| style="text-align:right;" | 20037.0
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-08
 
| style="text-align:right;" | 19321.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-12
 
| style="text-align:right;" | 16671.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-07
 
| style="text-align:right;" | 23468.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 16099.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-05
 
| style="text-align:right;" | 29213.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-10
 
| style="text-align:right;" | 20415.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2016-04
 
| 2016-04
| style="text-align:right;" | 0.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 106.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2016-05
 
| 2016-05
| style="text-align:right;" | 0.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 22.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2016-06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 131.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2016-02
+
| 2016-07
| style="text-align:right;" | 14789.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 29.0
+
| style="text-align: right;" | 353.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2016-08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 172.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2016-10
+
| 2016-09
| style="text-align:right;" | 10259.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 145.00 Bbl
| style="text-align:right;" | 0.0
+
| STORAGE PENDING DISPOSAL OR REUSE
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 1,521.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2016-04
+
| 2016-10
| style="text-align:right;" | 8470.13
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 150.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-09
 
| style="text-align:right;" | 10523.0
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2016-11
 
| 2016-11
| style="text-align:right;" | 12541.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 344.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-06
 
| style="text-align:right;" | 12824.0
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-08
 
| style="text-align:right;" | 10215.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2016-12
 
| 2016-12
| style="text-align:right;" | 11297.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 135.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROCESSING FACILITY
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2017-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 164.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2016-07
+
| 2017-02
| style="text-align:right;" | 11662.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 185.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROCESSING FACILITY
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2017-03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 88.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 2016-05
+
| 2017-03
| style="text-align:right;" | 11722.79
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 138.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROCESSING FACILITY
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2017-04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 163.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 2016-01
+
| 2017-04
| style="text-align:right;" | 17606.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 13.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROCESSING FACILITY
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2016-03
 
| style="text-align:right;" | 15751.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-11
 
| style="text-align:right;" | 9379.0
 
| style="text-align:right;" | 21.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-02
 
| style="text-align:right;" | 9342.0
 
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2017-05
 
| 2017-05
| style="text-align:right;" | 8565.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 100.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| PAS2D561BSOM
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-10
 
| style="text-align:right;" | 611.0
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-09
 
| style="text-align:right;" | 7784.0
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2017-06
 
| 2017-06
| style="text-align:right;" | 8914.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 165.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| PAS2D561BSOM
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2017-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 88.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 2017-04
+
| 2017-08
| style="text-align:right;" | 9086.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 63.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| PAS2D561BSOM
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2017-08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 76.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
 
| 2017-08
 
| 2017-08
| style="text-align:right;" | 8698.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 13.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROCESSING FACILITY
| style="text-align:right;" | 0.0
+
| WMGR123SW010
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2017-09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 97.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2017-10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 15.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
 
| 2017-12
 
| 2017-12
| style="text-align:right;" | 9232.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 96.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROCESSING FACILITY
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2017-12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 14.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
| 2017-01
+
| 2018-01
| style="text-align:right;" | 10114.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 181.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROCESSING FACILITY
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-07
 
| style="text-align:right;" | 8914.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2017-03
 
| style="text-align:right;" | 10547.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2018-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 55.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
 
| 2018-02
 
| 2018-02
| style="text-align:right;" | 8739.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 28.0
+
| style="text-align: right;" | 42.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROCESSING FACILITY
| style="text-align:right;" | 0.0
+
| WMGR123SW010
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2018-12
 
| style="text-align:right;" | 9903.0
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2018-03
 
| 2018-03
| style="text-align:right;" | 9422.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 209.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| PAS2D561BSOM
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2018-09
 
| style="text-align:right;" | 11630.0
 
| style="text-align:right;" | 30.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2018-04
 
| 2018-04
| style="text-align:right;" | 7795.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 112.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| PAS2D561BSOM
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2018-05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 84.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
 
| 2018-06
 
| 2018-06
| style="text-align:right;" | 7755.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 80.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| PAS2D561BSOM
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2018-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 27.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 2018-11
+
| 2018-07
| style="text-align:right;" | 10055.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 13.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROCESSING FACILITY
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2018-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 102.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
 
| 2018-08
 
| 2018-08
| style="text-align:right;" | 14459.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 18.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| PAS2D561BSOM
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2018-08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 187.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
| 2018-01
+
| 2018-09
| style="text-align:right;" | 10443.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 116.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| PAS2D561BSOM
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2018-10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 62.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 2018-07
+
| 2018-10
| style="text-align:right;" | 12850.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 126.00 Bbl
| style="text-align:right;" | 0.0
+
| REUSE (AT WELL PAD)
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2018-11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
| 2018-05
+
| 2018-11
| style="text-align:right;" | 8053.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 36.00 Bbl
| style="text-align:right;" | 0.0
+
| REUSE (AT WELL PAD)
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2018-12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 87.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 2018-10
+
| 2018-12
| style="text-align:right;" | 12603.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 4.00 Bbl
| style="text-align:right;" | 0.0
+
| REUSE (AT WELL PAD)
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2019-01
 
| 2019-01
| style="text-align:right;" | 9826.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 26.0
+
| style="text-align: right;" | 93.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| PAS2D561BSOM
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2019-02
 
| 2019-02
| style="text-align:right;" | 5868.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 22.0
+
| style="text-align: right;" | 87.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| PAS2D561BSOM
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2019-03
 
| 2019-03
| style="text-align:right;" | 10983.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 73.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| PAS2D561BSOM
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
 
| 2120867
 
| 2120867
| 2012-11-30
+
| Primary Facility
 +
| 11/30/2012
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site. Surface casing was set at 68feet from grade with 30 sacks of Type I (24 モ pipe).
+
| At the time of inspection, no E&S issues were present at the site. Surface casing was set at 68feet from grade with 30 sacks of Type I (24 pipe).
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2121600
 
| 2121600
| 2012-11-28
+
| Primary Facility
 +
| 11/28/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Inspection result of spud notification. Multi-well pad.
 
| Inspection result of spud notification. Multi-well pad.
Site ID sign, valid permit, E&S plan, ESCGPI, PPC Plan present at access road entrance. Security on-site.
 
At the time of this inspection, cellar for 4H constructed. Actively drilling 5H, 1H had been drilled, cellars for 2H,3H constructed, 6H staked.
 
Minor erosion on hillside observed on back left corner of pad when facing wellheads from access road. Minor sediment from this erosion observed at base of hill in rock-lined ditch.
 
Observed tophole cuttings along soil pile. Department spoke with company representative who stated plans were to incorporate cuttings into soil pile and disperse across pad. Operator will address erosion concerns by routinely monitoring this area in order to prevent pollution event due to accelerated erosion and sedimentation.
 
Access road adequately rocked and no E&S issues were noted in relation to access road.  Department recommends that Operator continues to monitor and maintain access road and well-site as necessary.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2128467
 
| 2128467
| 2012-12-17
+
| Primary Facility
 +
| 12/17/2012
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 2H.
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 2H.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2128637
 
| 2128637
| 2013-01-08
+
| Primary Facility
 +
| 01/08/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 5H.
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 5H.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2143500
 
| 2143500
| 2013-02-11
+
| Primary Facility
 +
| 02/11/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Well 4H was drilled to 386 feet.  Keane 2144 rig shanked a bit and decided to stop drilling hole.  Chevron, Natasha Sackivichik (Drilling Engineer) called DEP and informed DEP of skidding rig to well 6H..  Chevron plugged well 4H will 910 sacks of Class A cement.
 
| At the time of inspection, no E&S issues were present at the site.  Well 4H was drilled to 386 feet.  Keane 2144 rig shanked a bit and decided to stop drilling hole.  Chevron, Natasha Sackivichik (Drilling Engineer) called DEP and informed DEP of skidding rig to well 6H..  Chevron plugged well 4H will 910 sacks of Class A cement.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2143513
 
| 2143513
| 2013-02-22
+
| Primary Facility
 +
| 02/22/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 6H.
+
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 6H.
 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2144637
 
| 2144637
| 2013-02-25
+
| Primary Facility
 +
| 02/25/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 4H spudded, TD not yet reached. 1H had been drilled. 2H, 3H, 5H, 6H also all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing. Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121600) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted.Department recommends that Operator remove debris from rock-lined ditches.
 
| Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 4H spudded, TD not yet reached. 1H had been drilled. 2H, 3H, 5H, 6H also all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing. Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121600) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted.Department recommends that Operator remove debris from rock-lined ditches.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2151598
 
| 2151598
| 2013-03-13
+
| Primary Facility
 +
| 03/13/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 3H.
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 3H.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2173642
 
| 2173642
| 2013-06-10
+
| Primary Facility
 +
| 06/10/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Routine inspection no issues noted.
 
| Routine inspection no issues noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2181331
 
| 2181331
| 2013-05-22
+
| Primary Facility
 +
| 05/22/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Met on site with Chevron. Signed off on a minor modification to the restoration plan.
 
| Met on site with Chevron. Signed off on a minor modification to the restoration plan.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2220943
 
| 2220943
| 2013-11-12
+
| Primary Facility
 +
| 11/12/2013
 +
| Administrative/File Review
 
| In Compliance with Policy
 
| In Compliance with Policy
 
| REPORTED SPILL OF APPROXIMATELY 8 GALS OF OIL BASED DRILLING MUD.  CHEVRON REP, BETH SMOCK, REPORTED THE REALSE AT 7:29AM ON 11/9/13.  DEPARTMENT FOLLOWED UP WITH OPERATOR AND IT APPEARS THAT OPERATOR IS IMPLEMENTING AND FOLLOWING CURRENT SPILL POLICY AND NOTIFIED THE DEPT AND BEGAN CLEAN UP MEASURES IN A TIMELY MANNER.
 
| REPORTED SPILL OF APPROXIMATELY 8 GALS OF OIL BASED DRILLING MUD.  CHEVRON REP, BETH SMOCK, REPORTED THE REALSE AT 7:29AM ON 11/9/13.  DEPARTMENT FOLLOWED UP WITH OPERATOR AND IT APPEARS THAT OPERATOR IS IMPLEMENTING AND FOLLOWING CURRENT SPILL POLICY AND NOTIFIED THE DEPT AND BEGAN CLEAN UP MEASURES IN A TIMELY MANNER.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2228134
 
| 2228134
| 2013-11-26
+
| Primary Facility
 +
| 11/26/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Well 4H was drilled to 12,224 ft TD with 6459 ft KOP and 9227 ft LP.  Production pipe was set and was cemented back to surface with 1730 sacks of Varicam (lead) 400 sks SoloCam (tail) with 32 bbl return.  Haliburton performed the cementing of the production pipe.
 
| At the time of inspection, no E&S issues were present at the site.  Well 4H was drilled to 12,224 ft TD with 6459 ft KOP and 9227 ft LP.  Production pipe was set and was cemented back to surface with 1730 sacks of Varicam (lead) 400 sks SoloCam (tail) with 32 bbl return.  Haliburton performed the cementing of the production pipe.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2228278
 
| 2228278
| 2013-10-31
+
| Primary Facility
 +
| 10/31/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H.
+
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H.
 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2228715
 
| 2228715
| 2013-10-09
+
| Primary Facility
 +
| 10/09/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H.
 
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2229858
 
| 2229858
| 2013-09-26
+
| Primary Facility
 +
| 09/26/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  Chevron was setting up to drill 4HA.
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  Chevron was setting up to drill 4HA.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2235871
 
| 2235871
| 2014-01-13
+
| Primary Facility
 +
| 01/13/2014
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
 
| On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
 
The entrance road to the well pad was well graveled. No mud was being drug out onto the main road.
 
 
Checked in with the guard.
 
 
Walked over the impoundment and met with Harvey Horner with Nuverra. Nuverra was working on the small truck turn around pad that is adjacent and on the Northern side of the impoundment. They were adding stone to the pad.
 
 
Walked over to the well pad. The well pad was inspected.
 
 
The # 1 well was not marked. Please mark this well and notify this inspector when the well is marked.
 
 
Large plastic pipe was being unloaded onto the well pad.
 
 
No signs of spills were noticed on the well pad.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2244509
 
| 2244509
| 2014-02-10
+
| Primary Facility
 +
| 02/10/2014
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Met with Curtis Small and inspected the well pad. Chevron was setting up on the well pad to frack a number of wells. The frack tanks will block access to the the pipeline companies access to their pipeline controls. Chevron propsed adding  an additional ramp tp allow the pipeline company access to their well controls. The access road will only  be temporary.
 
| Met with Curtis Small and inspected the well pad. Chevron was setting up on the well pad to frack a number of wells. The frack tanks will block access to the the pipeline companies access to their pipeline controls. Chevron propsed adding  an additional ramp tp allow the pipeline company access to their well controls. The access road will only  be temporary.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2250981
 
| 2250981
| 2014-03-05
+
| Primary Facility
 +
| 03/05/2014
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
 
| On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
 
The sign was correctly marked.
 
 
No mud was being drug out to the main road.
 
 
Checked in with the guard and donned the required PPE.
 
 
They were preparing the well pad for the frack equipment that will be coming on site. A road leading up to the Caymen pipeline was being reworked. This will allow the Caymen workers will have access to the pipeline.
 
 
A minor gas leak was observed at the Caymen pipeline. Chevron called Caymen and a Caymen worker responded to the site and repaired the leak.
 
 
The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2252447
 
| 2252447
| 2014-03-10
+
| Primary Facility
 +
| 03/10/2014
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On 3/10/14 met with Alex Grant with Chevron and inspected the site.
 
| On 3/10/14 met with Alex Grant with Chevron and inspected the site.
 
The sign was correctly marked.
 
 
No mud was being drug out to the main road.
 
 
Checked in with the guard and donned the required PPE.
 
 
They were preparing the well pad for the frack equipment that will be coming on site.
 
 
A road leading up to the Caymen pipeline was  reworked. This will allow the Caymen workers will have access to the pipeline.
 
 
The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed.
 
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 2298113
 +
| Primary Facility
 +
| 08/20/2014
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site.  Chevron was in process of fracking well 5H.  Well 1H was temporary shut in.  Wells 4HA, 3H and 6H have been completed.  Well 2H will be completed the following week.
 +
|-
 +
| 2298118
 +
| Primary Facility
 +
| 08/20/2014
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site.  Chevron was in process of fracking well 5H.  Well 1H was temporary shut in.  Wells 4HA, 3H and 6H have been completed.  Well 2H will be completed the following week.
 
|-
 
|-
 
| 2311283
 
| 2311283
| 2014-10-08
+
| Primary Facility
 +
| 10/08/2014
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
+
| Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
|
 
|
 
|
 
 
|-
 
|-
|}
+
| 2408931
For data sources see<ref>{{cite web
+
| Primary Facility
| title = Oil and Gas Historical Inspection Report
+
| 09/18/2015
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| Routine/Complete Inspection
| date = 2015-05-26
+
| No Violations Noted
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
| At time of inspection, well tag present and legible.
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2014-1
+
| 2486267
| Produced Fluid (in Barrels)
+
| Primary Facility
| style="text-align:right;" | 11.67
+
| 2016-05-19
| Bbl
+
| Routine/Complete Inspection
| REUSE OTHER THAN ROAD SPREADING
+
| No Violations Noted
|
+
| no issues.  system running
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
 
|  
 
|  
 
 
|-
 
|-
 +
| 2532224
 +
| Primary Facility
 +
| 2016-10-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running
 
|-
 
|-
| 2014-2
+
| 2549692
| Produced Fluid (in Barrels)
+
| Primary Facility
| style="text-align:right;" | 70.83
+
| 2016-12-29
| Bbl
+
| Routine/Complete Inspection
| REUSE OTHER THAN ROAD SPREADING
+
| Violation(s) Noted
|
+
| Multi-well Marcellus pad.
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
+
Site ID sign, E&S plan, ERP and PPC plan on site.
|
+
At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked.
|
+
Well appears to be in production. Well tag present and legible.
 +
Brine tank located in secondary containment. At this time approx 10 inches of liquid located in secondary containment. Department observed a hose discharging fluids from tank secondary containment onto well pad.  This hose begins in bottom of secondary containment, goes over containment wall, and ends on rocked area of well pad. No oil/sheen was observed on fluid located in containment or on/around fluid released onto pad. No erosion gullies or ponding of water was observed near discharge point.
 +
Department recorded a pH of 8.7 and specific conductivity of 1595 microsemens/cm from water sample taken from containment area and a pH of 8.6 and specific conductivity of 1595 microsemens/cm from water sample taken from discharging hose. Department contacted Operator Rep Clayton Hill (Dall
 
|-
 
|-
 +
| 2562081
 +
| Primary Facility
 +
| 2017-02-13
 +
| Administrative/File Review
 +
| Outstanding Violations - Viols Req'd
 +
| Admin inspection to Inspection Record # 2549692 where violations were issued for failure to properly store, transport, process or dispose of a residual waste, for land applied top-hole water or precipitation water that does not meet requirements for pH, conductivity and sheen, and for failure to spread top-hole water or precipitation water from a pit over an undisturbed, vegetated area capable of absorbing the water.
 +
 +
Operator Rep Clayton Hill contacted Department by phone. Mr. Hill requested clarification on the violation issued for failure to properly store, transport, process or dispose of a residual waste. Department stated that the violation was issued because production fluid was moved from one site (the Allen) to another site (the Saylor). Mr. Hill stated they were bringing the Saylor Unit 2H well online and used the produced fluid to assist in setting pipe down hole.
 +
Mr. Hill offered to provide disposal manifests from the Saylor well. Department stated manifests could be sent electronically or by mai
 
|-
 
|-
| 2014-2
+
| 2568069
| Fracing Fluid Waste (in Barrels)
+
| Primary Facility
| style="text-align:right;" | 28.33
+
| 2017-02-24
| Bbl
+
| Administrative/File Review
| REUSE OTHER THAN ROAD SPREADING
+
| Outstanding Violations - Viols Req'd
|
+
| Admin inspection to Inspection Record # 2549692 where violations were issued for failure to properly store, transport, process or dispose of a residual waste, for land applied top-hole water or precipitation water that does not meet requirements for pH, conductivity and sheen, and for failure to spread top-hole water or precipitation water from a pit over an undisturbed, vegetated area capable of absorbing the water.
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
+
 
|
+
Department received response to NOV from Operator.
|
+
In response to the violation issued under 78a.60 DISHCHARGE REQUIREMENTS, Operator states that a new freshwater discharge plan has been implemented and new pH and conductivity meters purchased. In addition, Operator has increased employee training regarding 78a regulations. Department recommends Operator conduct field tests to ensure the soils where the top-hole release occurred are not contaminated. Department requests Operator provide Department with results when results are obtained. 
 +
 
 +
In response to the violation issued for failure to prop
 
|-
 
|-
 +
| 2586747
 +
| Primary Facility
 +
| 2017-04-17
 +
| Administrative/File Review
 +
| Outstanding Violations - Viols Req'd
 +
| Admin inspection to Inspection Record # 2549692 where violations were issued for failure to properly store, transport, process or dispose of a residual waste, for land applied top-hole water or precipitation water that does not meet requirements for pH, conductivity and sheen, and for failure to spread top-hole water or precipitation water from a pit over an undisturbed, vegetated area capable of absorbing the water.
 +
 +
As per previous inspection (inspection record #2568069), Department requested field tests be performed to ensure soil where top-hole release occurred are not contaminated. At the time of this inspection Department has not received those results. Department contacted Operator by phone and left message requesting sample results. Operator Rep. Clayton Hill responded and sent sample results via e-mail.
 +
 +
Previously issued violation for land applied top-hole water that does not meet requirements for pH, conductivity, and sheen remains outstanding. Other violations issued under inspection record #2549
 
|-
 
|-
| 2013-1
+
| 2588067
| Drilling Fluid Waste (in Barrels)
+
| Primary Facility
| style="text-align:right;" | 88.0
+
| 2017-04-24
| Bbl
+
| Compliance Evaluation
| REUSE OTHER THAN ROAD SPREADING
+
| No Violations Noted
|  
+
| Compliance Evaluation Inspection to Inspection Record # 2549692 where violations were issued for failure to properly store, transport, process or dispose of a residual waste, for land applied top-hole water or precipitation water that does not meet requirements for pH, conductivity and sheen, and for failure to spread top-hole water or precipitation water from a pit over an undisturbed, vegetated area capable of absorbing the water.
| REUSE FOR DRILLING OR PLUGGING
+
Department contacted Operator Rep Clayton Hill by phone with questions regarding sample results submitted by Operator. Mr. Hill returned call on 4-25-17. In response to the Department's questions, Mr. Hill stated that a background sample was not collected, a sample of the fluid released was not collected, and that coordinates of where the grab sample was collected were not recorded. He also stated that the grab sample was collected 6” deep at the location of the top-hole discharge; the sample was not a composite sample.
|
+
Sample results provided by Operator do not include a test fo
|
 
 
|-
 
|-
 +
| 2594470
 +
| Primary Facility
 +
| 2017-04-25
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running.  no issues
 
|-
 
|-
| 2013-1
+
| 2594584
| Fracing Fluid Waste (in Barrels)
+
| Primary Facility
| style="text-align:right;" | 200.0
+
| 2017-05-16
| Bbl
+
| Routine/Complete Inspection
| REUSE OTHER THAN ROAD SPREADING
+
| No Violations Noted
|
+
| system running.  no issues
| REUSE FOR DRILLING OR PLUGGING
 
|  
 
|  
 
 
|-
 
|-
 +
| 2619665
 +
| Primary Facility
 +
| 2017-07-19
 +
| Administrative/File Review
 +
| No Violations Noted
 +
| Admin inspection to a phone call received from Operator rep Bob Liddle. Mr. Liddle requested regulation clarification regarding a landowner constructing a field road off of a current access road.
 +
According to Department records, the ESCGP for this site was terminated in 2015. Therefore, the Operator is only responsible for the access road, well pad, and any PCSM BMP’s. The Operator remains responsible for any E&S issues that develop on the access road and well pad, even if landowner activity results in those E&S issues.
 
|-
 
|-
| 2013-1
+
| 2626056
| Drill Cuttings (in Tons)
+
| Primary Facility
| style="text-align:right;" | 492.74
+
| 2017-08-16
| Tons
+
| Routine/Complete Inspection
| LANDFILL
+
| No Violations Noted
| 100419
+
| system running.  no issues
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
 
| MCCLELLANDTOWN
 
| PA
 
 
|-
 
|-
 +
| 2656139
 +
| Primary Facility
 +
| 2017-11-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| System running nomissues
 
|-
 
|-
| 2013-1
+
| 2672035
| Drilling Fluid Waste (in Barrels)
+
| Primary Facility
| style="text-align:right;" | 1575.0
+
| 2017-12-18
| Bbl
+
| Routine/Complete Inspection
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| WMGR123SW001
+
| System producing. No,issues
| APPALACHIAN WATER SERVICES LLC
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2672070
 +
| Primary Facility
 +
| 2017-12-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection.
 
|-
 
|-
| 2014-2
+
| 2685386
| Fracing Fluid Waste (in Barrels)
+
| Primary Facility
| style="text-align:right;" | 2727.67
+
| 2018-01-23
| Bbl
+
| Routine/Complete Inspection
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| No Violations Noted
| WMGR123SW001
+
| System producing.  Emergency contact present.  Well tag present.
| APPALACHIAN WATER SERVICES LLC
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2700769
 +
| Primary Facility
 +
| 2018-03-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well tag present and emergency contact information present.  No issues at the site
 
|-
 
|-
| 2014-2
+
| 2700821
| Fracturing Fluid Waste (in Tons)
+
| Primary Facility
| style="text-align:right;" | 58.23
+
| 2018-03-05
| Tons
+
| Routine/Complete Inspection
| LANDFILL
+
| No Violations Noted
| 76-00-08
+
| Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection.
| WASTE MANAGEMENT, INC - AMERICAN LANDFILL, INC
 
| WAYNESBURG
 
| OH
 
 
|-
 
|-
 +
| 2719556
 +
| Primary Facility
 +
| 2018-04-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment.
 
|-
 
|-
| 2013-2
+
| 2766917
| Drill Cuttings (in Tons)
+
| Primary Facility
| style="text-align:right;" | 472.78
+
| 2018-08-23
| Tons
+
| Routine/Complete Inspection
| LANDFILL
+
| No Violations Noted
| 100172
+
| Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed.
| ARDEN LANDFILL
 
| WASHINGTON
 
| PA
 
 
|-
 
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 
|-
 
|-
| 2015-1
+
| 2549692
| Produced Fluid (in Barrels)
+
| 778114
| style="text-align:right;" | 5986.17
+
| 2016-12-29
| Bbl
+
| 2017-02-24
| REUSE OTHER THAN ROAD SPREADING
+
| SWMA 301
 +
| Environmental Health & Safety
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
+
|-
 +
| 2549692
 +
| 778115
 +
| 2016-12-29
 +
| 2017-04-24
 +
| 78a60(b)2
 +
| Environmental Health & Safety
 
|  
 
|  
 +
|-
 +
| 2549692
 +
| 778116
 +
| 2016-12-29
 +
| 2017-02-24
 +
| 78a60(b)5
 +
| Environmental Health & Safety
 
|  
 
|  
 
|-
 
|-
 +
| 2562081
 +
| 778537
 +
| 2017-02-13
 +
| 2017-02-24
 +
| SWMA 301
 +
| Environmental Health & Safety
 +
|
 
|-
 
|-
| 2015-2
+
| 2562081
| Produced Fluid (in Barrels)
+
| 778538
| style="text-align:right;" | 4930.67
+
| 2017-02-13
| Bbl
+
| 2017-04-24
| REUSE OTHER THAN ROAD SPREADING
+
| 78a60(b)2
 +
| Environmental Health & Safety
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
+
|-
 +
| 2562081
 +
| 778539
 +
| 2017-02-13
 +
| 2017-04-24
 +
| 78a60(b)5
 +
| Environmental Health & Safety
 
|  
 
|  
 +
|-
 +
| 2568069
 +
| 780327
 +
| 2017-02-24
 +
| 2017-04-24
 +
| 78a60(b)2
 +
| Environmental Health & Safety
 
|  
 
|  
 
|-
 
|-
 +
| 2568069
 +
| 780328
 +
| 2017-02-24
 +
| 2017-04-24
 +
| 78a60(b)2
 +
| Environmental Health & Safety
 +
|
 
|-
 
|-
| 2015-1
+
| 2586747
| Produced Fluid (in Barrels)
+
| 784140
| style="text-align:right;" | 16.67
+
| 2017-04-17
| Bbl
+
| 2017-04-24
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| 78a60(b)2
| WMGR123SW001
+
| Environmental Health & Safety
| APPALACHIAN WATER SERVICES LLC
 
| MASONTOWN
 
| PA
 
|-
 
|-
 
| 2015-2
 
| Produced Fluid (in Barrels)
 
| style="text-align:right;" | 13.33
 
| Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| APPALACHIAN WATER SERVICES LLC
 
| MASONTOWN
 
| PA
 
|-
 
|-
 
| 2015-1
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align:right;" | 4304.17
 
| Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| APPALACHIAN WATER SERVICES LLC
 
| MASONTOWN
 
| PA
 
|-
 
|-
 
| 2015-1
 
| Fracturing Fluid Waste (in Tons)
 
| style="text-align:right;" | 23.48
 
| Tons
 
| LANDFILL
 
| 100592
 
| SOUTH HILLS LANDFILL
 
| SOUTH HILLS
 
| PA
 
|-
 
|-
 
| 2015-1
 
| Fracturing Fluid Waste (in Tons)
 
| style="text-align:right;" | 0.11
 
| Tons
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| MID0209062814
 
| NORTHERN A-1 SERVICES
 
| KALKASKA
 
| MI
 
|-
 
|-
 
| 2015-1
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align:right;" | 13.33
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY (
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 16SEPU
+
| 778114
| Produced Fluid (in Barrels) RWC 802
+
| 350907
| style="text-align:right;" | 145.0
+
| NOV - Notice of Violation
| Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
 
|  
 
|  
| TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE
 
 
|  
 
|  
| PA
+
| 2017-05-25
|-
+
| style="text-align: right;" |  
|-
+
| style="text-align: right;" |  
| 16DECU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 135.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 16OCTU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 150.0
 
| Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 16NOVU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 344.0
 
| Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 16MAYU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 22.0
 
| Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 16JUNU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 131.0
 
| Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 16JULU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 353.0
 
| Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 16AUGU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 172.0
 
| Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 16APRU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 106.0
 
| Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 2017-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 100.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
|-
 
| 2017-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 88.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
|-
 
| 2017-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 163.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
|-
 
| 2017-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 63.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
|-
 
| 2017-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 88.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
|-
 
| 2017-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 165.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
|-
 
| 2017-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 97.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW010
 
| GREENE COUNTY WATER TREATMENT LLC
 
| TELFORD
 
| PA
 
|-
 
|-
 
| 2017-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 15.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW010
 
| GREENE COUNTY WATER TREATMENT LLC
 
| TELFORD
 
| PA
 
|-
 
|-
 
| 2017-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 13.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW010
 
| GREENE COUNTY WATER TREATMENT LLC
 
| TELFORD
 
| PA
 
|-
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 14.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW010
 
| GREENE COUNTY WATER TREATMENT LLC
 
| TELFORD
 
| PA
 
|-
 
|-
 
| 2017-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 13.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 2017-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 76.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 96.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 2017-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 185.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 2017-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 164.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 2017-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 138.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
|-
 
 
|-
 
|-
| 2018-10
+
| 778115
| Produced Fluid (in Barrels) RWC 802
+
| 350907
| style="text-align:right;" | 126.0
+
| NOV - Notice of Violation
| Bbl
 
| REUSE (AT WELL PAD)
 
 
|  
 
|  
| POLK UNIT 1H (Well Pad Id: 149075)
 
 
|  
 
|  
| PA
+
| 2017-05-25
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
|-
+
| 778116
| 2018-11
+
| 350907
| Produced Fluid (in Barrels) RWC 802
+
| NOV - Notice of Violation
| style="text-align:right;" | 36.0
 
| Bbl
 
| REUSE (AT WELL PAD)
 
 
|  
 
|  
| POLK UNIT 1H (Well Pad Id: 149075)
 
 
|  
 
|  
| PA
+
| 2017-05-25
|-
+
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2018-12
+
| 784140
| Produced Fluid (in Barrels) RWC 802
+
| 350907
| style="text-align:right;" | 4.0
+
| NOV - Notice of Violation
| Bbl
 
| REUSE (AT WELL PAD)
 
 
|  
 
|  
| POLK UNIT 1H (Well Pad Id: 149075)
 
 
|  
 
|  
| PA
+
| 2017-05-25
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 2018-10
+
| 1
| Produced Fluid (in Barrels) RWC 802
+
| 07/21/2014
| style="text-align:right;" | 62.0
+
| 07/24/2014
| Bbl
+
| style="text-align: right;" | 8840
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 4,799,200.0
| PAS2D561BSOM
+
| style="text-align: right;" |  
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
 
|-
 
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 2018-05
+
|- valign="top"
| Produced Fluid (in Barrels) RWC 802
+
| rowspan="18"| 1
| style="text-align:right;" | 84.0
+
| rowspan="3"| EC6116A
| Bbl
+
| rowspan="3"| Nalco
| INJECTION DISPOSAL WELL
+
| rowspan="3"| Biocide
| PAS2D561BSOM
+
| Polyethylene Glycol
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
+
| 25322-68-3
| FRIEDENS
+
| style="text-align: right;" | 60
| PA
+
| style="text-align: right;" | 0.00154473
|-
+
| style="text-align: right;" | 0
|-
 
| 2018-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 209.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 80.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 27.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 116.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 87.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
 
|-
 
|-
| 2018-08
+
| 2,2-Dibromo-3-nitrilopropionamide
| Produced Fluid (in Barrels) RWC 802
+
| 10222-01-2
| style="text-align:right;" | 18.0
+
| style="text-align: right;" | 30
| Bbl
+
| style="text-align: right;" | 0.00077236
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 0
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
 
|-
 
|-
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00012873
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2018-04
+
|- valign="top"
| Produced Fluid (in Barrels) RWC 802
+
| rowspan="1"| EC6486A
| style="text-align:right;" | 112.0
+
| rowspan="1"| Nalco
| Bbl
+
| rowspan="1"| Scale Inhibitor
| INJECTION DISPOSAL WELL
+
| Ethylene Glycol
| PAS2D561BSOM
+
| 107-21-1
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
+
| style="text-align: right;" | 30
| FRIEDENS
+
| style="text-align: right;" | 0.00078168
| PA
+
| style="text-align: right;" | 0
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| 7.5% Acid
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Perf Cleanup
 +
| Hydrocloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 8
 +
| style="text-align: right;" | 0.00420768
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2018-11
+
|- valign="top"
| Produced Fluid (in Barrels) RWC 802
+
| rowspan="1"| Proppant
| style="text-align:right;" | 36.0
+
| rowspan="1"| Schlumberger
| Bbl
+
| rowspan="1"| Proppant
| RESIDUAL WASTE PROCESSING FACILITY
+
| Crystalline Silica
| WMGR123SW010
+
| 14808-60-7
| GREENE COUNTY WATER TREATMENT LLC
+
| style="text-align: right;" | 100
| TELFORD
+
| style="text-align: right;" | 11.7068
| PA
+
| style="text-align: right;" | 0
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| Base Fluid
 +
| rowspan="1"| Chevron
 +
| rowspan="1"| Carrier/Base Fluid
 +
| Water (Including Mix Water Supplied by Client)
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 88.179
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2018-07
+
|- valign="top"
| Produced Fluid (in Barrels) RWC 802
+
| rowspan="1"| L058
| style="text-align:right;" | 102.0
+
| rowspan="1"| Schlumberger
| Bbl
+
| rowspan="1"| Iron Stabilizer
| RESIDUAL WASTE PROCESSING FACILITY
+
| Sodium erythorbate
| WMGR123SW010
+
| 6381-77-7
| GREENE COUNTY WATER TREATMENT LLC
+
| style="text-align: right;" | 100
| TELFORD
+
| style="text-align: right;" | 0.00032751
| PA
+
| style="text-align: right;" | 0
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="4"| A264
 +
| rowspan="4"| Schlumberger
 +
| rowspan="4"| Iron Control
 +
| Aliphatic alcohols, ethoxylayed #1
 +
| Proprietary
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00002517
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2018-01
+
| Methanol
| Produced Fluid (in Barrels) RWC 802
+
| 67-56-1
| style="text-align:right;" | 55.0
+
| style="text-align: right;" | 40
| Bbl
+
| style="text-align: right;" | 0.00003356
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 0
| WMGR123SW010
 
| GREENE COUNTY WATER TREATMENT LLC
 
| TELFORD
 
| PA
 
 
|-
 
|-
 +
| Prop-2-yn-1-ol
 +
| 107-19-7
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00000839
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2018-02
+
| Aliphatic acids
| Produced Fluid (in Barrels) RWC 802
+
| Proprietary
| style="text-align:right;" | 42.0
+
| style="text-align: right;" | 30
| Bbl
+
| style="text-align: right;" | 0.00002517
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 0
| WMGR123SW010
 
| GREENE COUNTY WATER TREATMENT LLC
 
| TELFORD
 
| PA
 
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| J580
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Gelling Agent
 +
| Carboydrate polymer
 +
| Proprietary
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0315582
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2018-08
+
|- valign="top"
| Produced Fluid (in Barrels) RWC 802
+
| rowspan="1"| EC6673W
| style="text-align:right;" | 187.0
+
| rowspan="1"| Nalco
| Bbl
+
| rowspan="1"| Iron Control
| RESIDUAL WASTE PROCESSING FACILITY
+
| Ethylene Glycol
| WMGR123SW010
+
| 107-21-1
| GREENE COUNTY WATER TREATMENT LLC
+
| style="text-align: right;" | 30
| TELFORD
+
| style="text-align: right;" | 0.00360148
| PA
+
| style="text-align: right;" | 0
|-
 
|-
 
| 2018-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 181.0
 
| Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="3"| B466
 +
| rowspan="3"| Schlumberger
 +
| rowspan="3"| Friction Reducer
 +
| Distillates (petroleum), hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.0007526
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2018-07
+
| Alcohol Ethoxylates
| Produced Fluid (in Barrels) RWC 802
+
| Proprietary
| style="text-align:right;" | 13.0
+
| style="text-align: right;" | 5
| Bbl
+
| style="text-align: right;" | 0.00012543
| RESIDUAL WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 0
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| Ammonium Acetate
 +
| 631-61-8
 +
| style="text-align: right;" | 6
 +
| style="text-align: right;" | 0.00015052
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2019-01
+
|- valign="top"
| Produced Fluid (in Barrels) RWC 802
+
| rowspan="1"| J134
| style="text-align:right;" | 93.0
+
| rowspan="1"| Schlumberger
| Bbl
+
| rowspan="1"| Gel Breaker
| INJECTION DISPOSAL WELL
+
| Hemicellulase Enzyme
| PAS2D561BSOM
+
| 9012-54-8
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
+
| style="text-align: right;" | 100
| FRIEDENS
+
| style="text-align: right;" | 0.00146299
| PA
+
| style="text-align: right;" | 0
|-
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 87.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
|-
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align:right;" | 73.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| W SHANKSVILLE SALTWATER DISP WELL #1 (111-20059)
 
| FRIEDENS
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-26 }}</ref>
+
==References==
== References ==
+
<references/>
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Revision as of 02:45, 15 July 2019

Well Details

Well ID: 37-111-20313
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Addison Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 149069
Farm/Lease Name: PMG ALLEN UNIT 4H
License Status: Active
Spud Date: 03/15/2013
Permit Date: 7/23/2012
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.743447
Longitude: -79.357681

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 237,190.00 343 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 147,659.92 365 0.00 0 0.00 0
2017 LPR ENERGY LLC 101,186.00 354 0.00 0 0.00 0
2018 LPR ENERGY LLC 123,707.00 363 0.00 0 0.00 0
2019 LPR ENERGY LLC 26,677.00 79 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
16APRU Produced Fluid (in Barrels) RWC 802 106.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16AUGU Produced Fluid (in Barrels) RWC 802 172.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16DECU Produced Fluid (in Barrels) RWC 802 135.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
16JULU Produced Fluid (in Barrels) RWC 802 353.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16JUNU Produced Fluid (in Barrels) RWC 802 131.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16MAYU Produced Fluid (in Barrels) RWC 802 22.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16NOVU Produced Fluid (in Barrels) RWC 802 344.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16OCTU Produced Fluid (in Barrels) RWC 802 150.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16SEPU Produced Fluid (in Barrels) RWC 802 145.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013-1 Drill Cuttings (in Tons) 492.74 Tons LANDFILL 100419
2013-1 Drilling Fluid Waste (in Barrels) 1,575.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013-1 Drilling Fluid Waste (in Barrels) 88.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-1 Fracing Fluid Waste (in Barrels) 200.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-2 Drill Cuttings (in Tons) 472.78 Tons LANDFILL 100172
2014-1 Produced Fluid (in Barrels) 11.67 Bbl REUSE OTHER THAN ROAD SPREADING
2014-2 Fracing Fluid Waste (in Barrels) 2,727.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014-2 Fracing Fluid Waste (in Barrels) 28.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014-2 Fracturing Fluid Waste (in Tons) 58.23 Tons LANDFILL 76-00-08
2014-2 Produced Fluid (in Barrels) 70.83 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Fracing Fluid Waste (in Barrels) 4,304.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-1 Fracing Fluid Waste (in Barrels) 13.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Fracturing Fluid Waste (in Tons) 23.48 Tons LANDFILL 100592
2015-1 Fracturing Fluid Waste (in Tons) 0.11 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2015-1 Produced Fluid (in Barrels) 16.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-1 Produced Fluid (in Barrels) 5,986.17 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Produced Fluid (in Barrels) 13.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-2 Produced Fluid (in Barrels) 4,930.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016-04 Produced Fluid (in Barrels) RWC 802 106.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-05 Produced Fluid (in Barrels) RWC 802 22.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-06 Produced Fluid (in Barrels) RWC 802 131.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-07 Produced Fluid (in Barrels) RWC 802 353.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-08 Produced Fluid (in Barrels) RWC 802 172.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-09 Produced Fluid (in Barrels) RWC 802 145.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016-1 Produced Fluid (in Barrels) RWC 802 1,521.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-10 Produced Fluid (in Barrels) RWC 802 150.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-11 Produced Fluid (in Barrels) RWC 802 344.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-12 Produced Fluid (in Barrels) RWC 802 135.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-01 Produced Fluid (in Barrels) RWC 802 164.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-02 Produced Fluid (in Barrels) RWC 802 185.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-03 Produced Fluid (in Barrels) RWC 802 88.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-03 Produced Fluid (in Barrels) RWC 802 138.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-04 Produced Fluid (in Barrels) RWC 802 163.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-04 Produced Fluid (in Barrels) RWC 802 13.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-05 Produced Fluid (in Barrels) RWC 802 100.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-06 Produced Fluid (in Barrels) RWC 802 165.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-07 Produced Fluid (in Barrels) RWC 802 88.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-08 Produced Fluid (in Barrels) RWC 802 63.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-08 Produced Fluid (in Barrels) RWC 802 76.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-08 Produced Fluid (in Barrels) RWC 802 13.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-09 Produced Fluid (in Barrels) RWC 802 97.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-10 Produced Fluid (in Barrels) RWC 802 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-12 Produced Fluid (in Barrels) RWC 802 96.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-12 Produced Fluid (in Barrels) RWC 802 14.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-01 Produced Fluid (in Barrels) RWC 802 181.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-01 Produced Fluid (in Barrels) RWC 802 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-02 Produced Fluid (in Barrels) RWC 802 42.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-03 Produced Fluid (in Barrels) RWC 802 209.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-04 Produced Fluid (in Barrels) RWC 802 112.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-05 Produced Fluid (in Barrels) RWC 802 84.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-06 Produced Fluid (in Barrels) RWC 802 80.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-07 Produced Fluid (in Barrels) RWC 802 27.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-07 Produced Fluid (in Barrels) RWC 802 13.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-07 Produced Fluid (in Barrels) RWC 802 102.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-08 Produced Fluid (in Barrels) RWC 802 18.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-08 Produced Fluid (in Barrels) RWC 802 187.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-09 Produced Fluid (in Barrels) RWC 802 116.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-10 Produced Fluid (in Barrels) RWC 802 62.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-10 Produced Fluid (in Barrels) RWC 802 126.00 Bbl REUSE (AT WELL PAD)
2018-11 Produced Fluid (in Barrels) RWC 802 36.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-11 Produced Fluid (in Barrels) RWC 802 36.00 Bbl REUSE (AT WELL PAD)
2018-12 Produced Fluid (in Barrels) RWC 802 87.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-12 Produced Fluid (in Barrels) RWC 802 4.00 Bbl REUSE (AT WELL PAD)
2019-01 Produced Fluid (in Barrels) RWC 802 93.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019-02 Produced Fluid (in Barrels) RWC 802 87.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019-03 Produced Fluid (in Barrels) RWC 802 73.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2120867 Primary Facility 11/30/2012 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Surface casing was set at 68feet from grade with 30 sacks of Type I (24 “ pipe).
2121600 Primary Facility 11/28/2012 Routine/Complete Inspection No Violations Noted Inspection result of spud notification. Multi-well pad.
2128467 Primary Facility 12/17/2012 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 2H.
2128637 Primary Facility 01/08/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 5H.
2143500 Primary Facility 02/11/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Well 4H was drilled to 386 feet. Keane 2144 rig shanked a bit and decided to stop drilling hole. Chevron, Natasha Sackivichik (Drilling Engineer) called DEP and informed DEP of skidding rig to well 6H.. Chevron plugged well 4H will 910 sacks of Class A cement.
2143513 Primary Facility 02/22/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H.
2144637 Primary Facility 02/25/2013 Routine/Complete Inspection No Violations Noted Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 4H spudded, TD not yet reached. 1H had been drilled. 2H, 3H, 5H, 6H also all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing. Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121600) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted.Department recommends that Operator remove debris from rock-lined ditches.
2151598 Primary Facility 03/13/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H.
2173642 Primary Facility 06/10/2013 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2181331 Primary Facility 05/22/2013 Routine/Complete Inspection No Violations Noted Met on site with Chevron. Signed off on a minor modification to the restoration plan.
2220943 Primary Facility 11/12/2013 Administrative/File Review In Compliance with Policy REPORTED SPILL OF APPROXIMATELY 8 GALS OF OIL BASED DRILLING MUD. CHEVRON REP, BETH SMOCK, REPORTED THE REALSE AT 7:29AM ON 11/9/13. DEPARTMENT FOLLOWED UP WITH OPERATOR AND IT APPEARS THAT OPERATOR IS IMPLEMENTING AND FOLLOWING CURRENT SPILL POLICY AND NOTIFIED THE DEPT AND BEGAN CLEAN UP MEASURES IN A TIMELY MANNER.
2228134 Primary Facility 11/26/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Well 4H was drilled to 12,224 ft TD with 6459 ft KOP and 9227 ft LP. Production pipe was set and was cemented back to surface with 1730 sacks of Varicam (lead) 400 sks SoloCam (tail) with 32 bbl return. Haliburton performed the cementing of the production pipe.
2228278 Primary Facility 10/31/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H.
2228715 Primary Facility 10/09/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H.
2229858 Primary Facility 09/26/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was setting up to drill 4HA.
2235871 Primary Facility 01/13/2014 Routine/Complete Inspection No Violations Noted On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
2244509 Primary Facility 02/10/2014 Routine/Complete Inspection No Violations Noted Met with Curtis Small and inspected the well pad. Chevron was setting up on the well pad to frack a number of wells. The frack tanks will block access to the the pipeline companies access to their pipeline controls. Chevron propsed adding an additional ramp tp allow the pipeline company access to their well controls. The access road will only be temporary.
2250981 Primary Facility 03/05/2014 Routine/Complete Inspection No Violations Noted On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
2252447 Primary Facility 03/10/2014 Routine/Complete Inspection No Violations Noted On 3/10/14 met with Alex Grant with Chevron and inspected the site.
2298113 Primary Facility 08/20/2014 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was in process of fracking well 5H. Well 1H was temporary shut in. Wells 4HA, 3H and 6H have been completed. Well 2H will be completed the following week.
2298118 Primary Facility 08/20/2014 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was in process of fracking well 5H. Well 1H was temporary shut in. Wells 4HA, 3H and 6H have been completed. Well 2H will be completed the following week.
2311283 Primary Facility 10/08/2014 Routine/Complete Inspection No Violations Noted Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
2408931 Primary Facility 09/18/2015 Routine/Complete Inspection No Violations Noted At time of inspection, well tag present and legible.
2486267 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted no issues. system running
2532224 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted system running
2549692 Primary Facility 2016-12-29 Routine/Complete Inspection Violation(s) Noted Multi-well Marcellus pad.

Site ID sign, E&S plan, ERP and PPC plan on site. At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked. Well appears to be in production. Well tag present and legible. Brine tank located in secondary containment. At this time approx 10 inches of liquid located in secondary containment. Department observed a hose discharging fluids from tank secondary containment onto well pad. This hose begins in bottom of secondary containment, goes over containment wall, and ends on rocked area of well pad. No oil/sheen was observed on fluid located in containment or on/around fluid released onto pad. No erosion gullies or ponding of water was observed near discharge point. Department recorded a pH of 8.7 and specific conductivity of 1595 microsemens/cm from water sample taken from containment area and a pH of 8.6 and specific conductivity of 1595 microsemens/cm from water sample taken from discharging hose. Department contacted Operator Rep Clayton Hill (Dall

2562081 Primary Facility 2017-02-13 Administrative/File Review Outstanding Violations - Viols Req'd Admin inspection to Inspection Record # 2549692 where violations were issued for failure to properly store, transport, process or dispose of a residual waste, for land applied top-hole water or precipitation water that does not meet requirements for pH, conductivity and sheen, and for failure to spread top-hole water or precipitation water from a pit over an undisturbed, vegetated area capable of absorbing the water.

Operator Rep Clayton Hill contacted Department by phone. Mr. Hill requested clarification on the violation issued for failure to properly store, transport, process or dispose of a residual waste. Department stated that the violation was issued because production fluid was moved from one site (the Allen) to another site (the Saylor). Mr. Hill stated they were bringing the Saylor Unit 2H well online and used the produced fluid to assist in setting pipe down hole. Mr. Hill offered to provide disposal manifests from the Saylor well. Department stated manifests could be sent electronically or by mai

2568069 Primary Facility 2017-02-24 Administrative/File Review Outstanding Violations - Viols Req'd Admin inspection to Inspection Record # 2549692 where violations were issued for failure to properly store, transport, process or dispose of a residual waste, for land applied top-hole water or precipitation water that does not meet requirements for pH, conductivity and sheen, and for failure to spread top-hole water or precipitation water from a pit over an undisturbed, vegetated area capable of absorbing the water.

Department received response to NOV from Operator. In response to the violation issued under 78a.60 DISHCHARGE REQUIREMENTS, Operator states that a new freshwater discharge plan has been implemented and new pH and conductivity meters purchased. In addition, Operator has increased employee training regarding 78a regulations. Department recommends Operator conduct field tests to ensure the soils where the top-hole release occurred are not contaminated. Department requests Operator provide Department with results when results are obtained.

In response to the violation issued for failure to prop

2586747 Primary Facility 2017-04-17 Administrative/File Review Outstanding Violations - Viols Req'd Admin inspection to Inspection Record # 2549692 where violations were issued for failure to properly store, transport, process or dispose of a residual waste, for land applied top-hole water or precipitation water that does not meet requirements for pH, conductivity and sheen, and for failure to spread top-hole water or precipitation water from a pit over an undisturbed, vegetated area capable of absorbing the water.

As per previous inspection (inspection record #2568069), Department requested field tests be performed to ensure soil where top-hole release occurred are not contaminated. At the time of this inspection Department has not received those results. Department contacted Operator by phone and left message requesting sample results. Operator Rep. Clayton Hill responded and sent sample results via e-mail.

Previously issued violation for land applied top-hole water that does not meet requirements for pH, conductivity, and sheen remains outstanding. Other violations issued under inspection record #2549

2588067 Primary Facility 2017-04-24 Compliance Evaluation No Violations Noted Compliance Evaluation Inspection to Inspection Record # 2549692 where violations were issued for failure to properly store, transport, process or dispose of a residual waste, for land applied top-hole water or precipitation water that does not meet requirements for pH, conductivity and sheen, and for failure to spread top-hole water or precipitation water from a pit over an undisturbed, vegetated area capable of absorbing the water.

Department contacted Operator Rep Clayton Hill by phone with questions regarding sample results submitted by Operator. Mr. Hill returned call on 4-25-17. In response to the Department's questions, Mr. Hill stated that a background sample was not collected, a sample of the fluid released was not collected, and that coordinates of where the grab sample was collected were not recorded. He also stated that the grab sample was collected 6” deep at the location of the top-hole discharge; the sample was not a composite sample. Sample results provided by Operator do not include a test fo

2594470 Primary Facility 2017-04-25 Routine/Complete Inspection No Violations Noted system running. no issues
2594584 Primary Facility 2017-05-16 Routine/Complete Inspection No Violations Noted system running. no issues
2619665 Primary Facility 2017-07-19 Administrative/File Review No Violations Noted Admin inspection to a phone call received from Operator rep Bob Liddle. Mr. Liddle requested regulation clarification regarding a landowner constructing a field road off of a current access road.

According to Department records, the ESCGP for this site was terminated in 2015. Therefore, the Operator is only responsible for the access road, well pad, and any PCSM BMP’s. The Operator remains responsible for any E&S issues that develop on the access road and well pad, even if landowner activity results in those E&S issues.

2626056 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted system running. no issues
2656139 Primary Facility 2017-11-02 Routine/Complete Inspection No Violations Noted System running nomissues
2672035 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted System producing. No,issues
2672070 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection.
2685386 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted System producing. Emergency contact present. Well tag present.
2700769 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Well tag present and emergency contact information present. No issues at the site
2700821 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection.
2719556 Primary Facility 2018-04-18 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment.
2766917 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2549692 778114 2016-12-29 2017-02-24 SWMA 301 Environmental Health & Safety
2549692 778115 2016-12-29 2017-04-24 78a60(b)2 Environmental Health & Safety
2549692 778116 2016-12-29 2017-02-24 78a60(b)5 Environmental Health & Safety
2562081 778537 2017-02-13 2017-02-24 SWMA 301 Environmental Health & Safety
2562081 778538 2017-02-13 2017-04-24 78a60(b)2 Environmental Health & Safety
2562081 778539 2017-02-13 2017-04-24 78a60(b)5 Environmental Health & Safety
2568069 780327 2017-02-24 2017-04-24 78a60(b)2 Environmental Health & Safety
2568069 780328 2017-02-24 2017-04-24 78a60(b)2 Environmental Health & Safety
2586747 784140 2017-04-17 2017-04-24 78a60(b)2 Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
778114 350907 NOV - Notice of Violation 2017-05-25
778115 350907 NOV - Notice of Violation 2017-05-25
778116 350907 NOV - Notice of Violation 2017-05-25
784140 350907 NOV - Notice of Violation 2017-05-25

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/21/2014 07/24/2014 8840 4,799,200.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.00154473 0
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00077236 0
Dibromoacetonitrile 3252-43-5 5 0.00012873 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00078168 0
7.5% Acid Schlumberger Perf Cleanup Hydrocloric Acid 7647-01-0 8 0.00420768 0
Proppant Schlumberger Proppant Crystalline Silica 14808-60-7 100 11.7068 0
Base Fluid Chevron Carrier/Base Fluid Water (Including Mix Water Supplied by Client) 7732-18-5 100 88.179 0
L058 Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.00032751 0
A264 Schlumberger Iron Control Aliphatic alcohols, ethoxylayed #1 Proprietary 30 0.00002517 0
Methanol 67-56-1 40 0.00003356 0
Prop-2-yn-1-ol 107-19-7 10 0.00000839 0
Aliphatic acids Proprietary 30 0.00002517 0
J580 Schlumberger Gelling Agent Carboydrate polymer Proprietary 100 0.0315582 0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00360148 0
B466 Schlumberger Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 30 0.0007526 0
Alcohol Ethoxylates Proprietary 5 0.00012543 0
Ammonium Acetate 631-61-8 6 0.00015052 0
J134 Schlumberger Gel Breaker Hemicellulase Enzyme 9012-54-8 100 0.00146299 0

For data sources see[7]