X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-113-20273"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-113-20273
 
| Well ID: 37-113-20273
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.538908, -76.259238 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.538908, -76.259239 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Sullivan County, Pennsylvania|Sullivan]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Colley Township, Sullivan County, Pennsylvania|Colley Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Sullivan_County,_Pennsylvania|Sullivan]]
 +
|-
 +
| Municipality: [[Colley Township,_Sullivan_County,_Pennsylvania|Colley Township]]
 
|-
 
|-
 
| Operator Name: [[CHESAPEAKE APPALACHIA LLC]]
 
| Operator Name: [[CHESAPEAKE APPALACHIA LLC]]
Line 15: Line 19:
 
| Farm/Lease Name: CHAMPLIN NE SUL 2H
 
| Farm/Lease Name: CHAMPLIN NE SUL 2H
 
|-
 
|-
| First Permit Date: 2014-04-23
+
| License Status:
 +
|-
 +
| Spud Date:
 +
|-
 +
| Permit Date: 4/23/2014
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 
|-
 
|-
| Last Permit Date: 2015-04-14
+
| Latitude: 41.538908
 
|-
 
|-
| Spud Date:  
+
| Longitude: -76.259239
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| Unconventional: Yes
+
|}-->
 +
 
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 
|-
 
|-
| Configuration: Horizontal
+
|}-->
 +
 
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
| Well Status:
+
| 2296530
 +
| Primary Facility
 +
| 07/30/2014
 +
| Preoperation Inspection
 +
| No Violations Noted
 +
|
 
|-
 
|-
| Violations: 0
+
| 2446027
 +
| Primary Facility
 +
| 2016-02-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine inspection conducted to assess general site conditions. No Chesapeake representatives were present.
 +
 
 +
Temporary erosion and sediment control BMPs are in place and in good repair. Most of the site has >70% perennial vegetation, though there are some patches with less and several rocky areas. No evidence of accelerated erosion or sedimentation was observed. 
 +
 
 +
No violations were cited during this inspection.
 
|-
 
|-
| Latitude: 41.538908
+
| 2542744
 +
| Primary Facility
 +
| 2016-12-07
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine inspection conducted to assess overall site conditions. No Chesapeake representatives were present.
 +
 
 +
Temporary erosion and sediment control BMPs are in place and in good repair. Vegetative cover over most of the site is greater than 70% perennial vegetation, though there are some patches with less and several rocky areas. No evidence of accelerated erosion or sedimentation was observed. 
 +
 
 +
The post-construction stormwater management (PCSM) BMPs required by the Department's March 03, 2016 approval of an extension of time for site restoration have been installed. Temproary stabilization and erosion and sediment control BMPs have been installed in the areas affected by PCSM construction.
 +
 
 +
No violations were cited during this inspection.
 
|-
 
|-
| Longitude: -76.259238
+
| 2751203
 +
| Primary Facility
 +
| 2018-07-12
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Spud notification received on 7/12/2018 for the 6H and 23H wells.
 +
 
 +
Nomac  Peakrig 71 already drilled 1H and 21H wells within the past month.
 +
 
 +
Neil Brown did a walk-around with the Department during this inspection. No violations noted.
 
|-
 
|-
 
|}
 
|}
== References ==
+
<!--==== Violations Commited ====
{{reflist}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 03:15, 15 July 2019

Well Details

Well ID: 37-113-20273
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Colley Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID:
Farm/Lease Name: CHAMPLIN NE SUL 2H
License Status:
Spud Date:
Permit Date: 4/23/2014
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.538908
Longitude: -76.259239

For data sources see[1][2][3]


Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2296530 Primary Facility 07/30/2014 Preoperation Inspection No Violations Noted
2446027 Primary Facility 2016-02-02 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess general site conditions. No Chesapeake representatives were present.

Temporary erosion and sediment control BMPs are in place and in good repair. Most of the site has >70% perennial vegetation, though there are some patches with less and several rocky areas. No evidence of accelerated erosion or sedimentation was observed.

No violations were cited during this inspection.

2542744 Primary Facility 2016-12-07 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess overall site conditions. No Chesapeake representatives were present.

Temporary erosion and sediment control BMPs are in place and in good repair. Vegetative cover over most of the site is greater than 70% perennial vegetation, though there are some patches with less and several rocky areas. No evidence of accelerated erosion or sedimentation was observed.

The post-construction stormwater management (PCSM) BMPs required by the Department's March 03, 2016 approval of an extension of time for site restoration have been installed. Temproary stabilization and erosion and sediment control BMPs have been installed in the areas affected by PCSM construction.

No violations were cited during this inspection.

2751203 Primary Facility 2018-07-12 Drilling/Alteration No Violations Noted Spud notification received on 7/12/2018 for the 6H and 23H wells.

Nomac Peakrig 71 already drilled 1H and 21H wells within the past month.

Neil Brown did a walk-around with the Department during this inspection. No violations noted.

For data sources see[4]

References