Well ID: 37-113-20273 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.538908,"lon":-76.259239,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Colley Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: | |
Farm/Lease Name: CHAMPLIN NE SUL 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-04-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.538908 | |
Longitude: -76.259239 |
Date | Event |
---|---|
2014-04-23 | New Permit Application |
2015-04-14 | Permit Renewal Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2296530 | Primary Facility | 2014-07-30 | Preoperation Inspection | No Violations Noted | |
2446027 | Primary Facility | 2016-02-02 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess general site conditions. No Chesapeake representatives were present.
Temporary erosion and sediment control BMPs are in place and in good repair. Most of the site has >70% perennial vegetation, though there are some patches with less and several rocky areas. No evidence of accelerated erosion or sedimentation was observed. No violations were cited during this inspection. |
2542744 | Primary Facility | 2016-12-07 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess overall site conditions. No Chesapeake representatives were present.
Temporary erosion and sediment control BMPs are in place and in good repair. Vegetative cover over most of the site is greater than 70% perennial vegetation, though there are some patches with less and several rocky areas. No evidence of accelerated erosion or sedimentation was observed. The post-construction stormwater management (PCSM) BMPs required by the Department's March 03, 2016 approval of an extension of time for site restoration have been installed. Temproary stabilization and erosion and sediment control BMPs have been installed in the areas affected by PCSM construction. No violations were cited during this inspection. |
2751203 | Primary Facility | 2018-07-12 | Drilling/Alteration | No Violations Noted | Spud notification received on 7/12/2018 for the 6H and 23H wells.
Nomac Peakrig 71 already drilled 1H and 21H wells within the past month. Neil Brown did a walk-around with the Department during this inspection. No violations noted. |