If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-125-22289 | | Well ID: 37-125-22289 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="14" | {{#display_map: 40.188703, -80.374011 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Pennsylvania |
|- | |- | ||
− | | Operator Name: [[ | + | | County: [[Washington_County,_Pennsylvania|Washington]] |
+ | |- | ||
+ | | Municipality: [[Blaine Township,_Washington_County,_Pennsylvania|Blaine Township]] | ||
+ | |- | ||
+ | | Operator Name: [[DALLAS ENERGY LLC]] | ||
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
Line 15: | Line 19: | ||
| Farm/Lease Name: SAMUEL WOODBURN 028-A | | Farm/Lease Name: SAMUEL WOODBURN 028-A | ||
|- | |- | ||
− | | | + | | License Status: Plugged OG Well |
+ | |- | ||
+ | | Spud Date: 03/10/2006 | ||
|- | |- | ||
− | | | + | | Permit Date: 2/1/2006 |
|- | |- | ||
− | | Spud | + | | Unconventional Well: N |
+ | |- | ||
+ | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Latitude: 40.188703 | ||
+ | |- | ||
+ | | Longitude: -80.374011 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
|- | |- | ||
− | | | + | | 2008 |
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
− | | | + | | 2010 |
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
− | | | + | | 2011 |
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
− | | | + | | 2012 |
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
− | | | + | | 2013 |
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
− | | | + | | 2014 |
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
− | !scope="col" | | + | !scope="col" | Inspection Comments |
− | + | |- | |
+ | | 2398764 | ||
+ | | Primary Facility | ||
+ | | 07/13/2015 | ||
+ | | Plugging(Includes Plugged/Mined Through) | ||
+ | | No Violations Noted | ||
+ | | Discusssed PTA procedures in coal mined areas and alternate methods. NOVIO | ||
|- | |- | ||
− | | | + | | 2400468 |
− | | | + | | Primary Facility |
− | | | + | | 07/23/2015 |
− | | | + | | Plugging(Includes Plugged/Mined Through) |
− | | | + | | No Violations Noted |
− | + | | Reviewed bond log, gave okay to plug and pull casing as planned. NOVIO | |
− | | | ||
|- | |- | ||
+ | | 2400482 | ||
+ | | Primary Facility | ||
+ | | 07/31/2015 | ||
+ | | Plugging(Includes Plugged/Mined Through) | ||
+ | | No Violations Noted | ||
+ | | Rig waiting on SCCSO. NOVIO | ||
|- | |- | ||
− | | | + | | 2400502 |
− | | | + | | Primary Facility |
− | | | + | | 08/05/2015 |
− | | | + | | Plugging(Includes Plugged/Mined Through) |
− | | | + | | No Violations Noted |
− | + | | Rig on location. Tbg still in place. Crew on safety shutdown day. NOVIO | |
− | |||
|- | |- | ||
+ | | 2418997 | ||
+ | | Primary Facility | ||
+ | | 08/07/2015 | ||
+ | | Plugging(Includes Plugged/Mined Through) | ||
+ | | No Adverse Event or Action Reported | ||
+ | | Pipe tub and pipe rack remain on location after plugging. Cellar is covered w/ wheelbarrow, remains to be filled and area needs graded & seeded. No monument set yet. | ||
|- | |- | ||
− | | | + | | 2419656 |
− | | | + | | Primary Facility |
− | | | + | | 07/08/2015 |
− | | | + | | Plugging(Includes Plugged/Mined Through) |
− | | | + | | In Compliance with Schedule |
− | | | + | | ConServ is finishing getting rigged up on well. Discussed upcoming activity w/ Jeff Loney and Luke Hartzell from SWEPI. |
− | |||
|- | |- | ||
+ | | 2419671 | ||
+ | | Primary Facility | ||
+ | | 07/13/2015 | ||
+ | | Plugging(Includes Plugged/Mined Through) | ||
+ | | In Compliance with Schedule | ||
+ | | Met w/ Eric Peterson at wellsite to discuss plugging procedures w/ SWEPI & ConServ. ConServ has cut tubing above packer and retrieved it after numerous unsuccessful attempts to release packer. | ||
|- | |- | ||
− | | | + | | 2419684 |
− | | | + | | Primary Facility |
− | + | | 07/14/2015 | |
− | | | + | | Plugging(Includes Plugged/Mined Through) |
− | | | + | | In Compliance with Schedule |
− | | | + | | ConServ TIH w/ 1" cement string, snub into tubing above packer and continue to ~2700 feet to spot bottom plug. |
− | | | ||
|- | |- | ||
+ | | 2419687 | ||
+ | | Primary Facility | ||
+ | | 07/15/2015 | ||
+ | | Plugging(Includes Plugged/Mined Through) | ||
+ | | In Compliance with Schedule | ||
+ | | ConServ pumped bottom cement plug below packer, partially TOOH w/ cement string, WOC. | ||
|- | |- | ||
− | | | + | | 2419694 |
− | | | + | | Primary Facility |
− | | | + | | 07/20/2015 |
− | | | + | | Plugging(Includes Plugged/Mined Through) |
− | | | + | | In Compliance with Schedule |
− | | | + | | ConServ shot collar at 1160 feet on 4 1/2" casing. Casing pulled free. |
− | |||
|- | |- | ||
+ | | 2420638 | ||
+ | | Primary Facility | ||
+ | | 10/30/2015 | ||
+ | | Plugging(Includes Plugged/Mined Through) | ||
+ | | In Compliance with Schedule | ||
+ | | Revisited site to confirm monument had been set. Site has been restored for some time since plugging. | ||
|- | |- | ||
− | | | + | | 2445308 |
− | | | + | | Primary Facility |
− | | | + | | 2016-01-28 |
− | | | + | | Plugging(Includes Plugged/Mined Through) |
− | | | + | | No Violations Noted |
− | | | + | | Monument is erected. Location still in need of final reclaimation. NOVIO |
− | |||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Compliance Report |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-05-20 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == | + | <!--== Fracking Activities == |
+ | ==== Fracking Jobs ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Job Number |
− | !scope="col" | | + | !scope="col" | Job Start Date |
− | !scope="col" | | + | !scope="col" | Job End Date |
− | !scope="col" | | + | !scope="col" | True Vertical Depth (ft) |
− | !scope="col" | | + | !scope="col" | Total Water Volume (gal) |
− | !scope="col" | | + | !scope="col" | Total Non-Water Volume (gal) |
− | + | |- | |
− | + | |}--> | |
− | + | <!--==== Fluid Composition Data ==== | |
− | |} | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Job Number |
− | !scope="col" | | + | !scope="col" | Trade Name |
− | !scope="col" | | + | !scope="col" | Supplier |
− | !scope="col" | | + | !scope="col" | Purpose |
− | !scope="col" | | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
− | !scope="col" | | + | !scope="col" | Additive Percentage by Mass |
− | | | + | !scope="col" | Job Percentage by Mass |
− | + | !scope="col" | Mass Used (lb) | |
− | + | |- | |
− | + | |}--> | |
− | + | ||
− | + | ==References== | |
− | + | <references/> | |
− | == References == | ||
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
Well ID: 37-125-22289 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.188703,"lon":-80.374011,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Blaine Township | |
Operator Name: DALLAS ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: SAMUEL WOODBURN 028-A | |
License Status: Plugged OG Well | |
Spud Date: 03/10/2006 | |
Permit Date: 2/1/2006 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 40.188703 | |
Longitude: -80.374011 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | 0.00 | 0.00 | 0.00 | ||||
2010 | 0.00 | 0.00 | 0.00 | ||||
2011 | 0.00 | 0.00 | 0.00 | ||||
2012 | 0.00 | 0.00 | 0.00 | ||||
2013 | 0.00 | 0.00 | 0.00 | ||||
2014 | 0.00 | 0.00 | 0.00 |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2398764 | Primary Facility | 07/13/2015 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Discusssed PTA procedures in coal mined areas and alternate methods. NOVIO |
2400468 | Primary Facility | 07/23/2015 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Reviewed bond log, gave okay to plug and pull casing as planned. NOVIO |
2400482 | Primary Facility | 07/31/2015 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Rig waiting on SCCSO. NOVIO |
2400502 | Primary Facility | 08/05/2015 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Rig on location. Tbg still in place. Crew on safety shutdown day. NOVIO |
2418997 | Primary Facility | 08/07/2015 | Plugging(Includes Plugged/Mined Through) | No Adverse Event or Action Reported | Pipe tub and pipe rack remain on location after plugging. Cellar is covered w/ wheelbarrow, remains to be filled and area needs graded & seeded. No monument set yet. |
2419656 | Primary Facility | 07/08/2015 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ is finishing getting rigged up on well. Discussed upcoming activity w/ Jeff Loney and Luke Hartzell from SWEPI. |
2419671 | Primary Facility | 07/13/2015 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Met w/ Eric Peterson at wellsite to discuss plugging procedures w/ SWEPI & ConServ. ConServ has cut tubing above packer and retrieved it after numerous unsuccessful attempts to release packer. |
2419684 | Primary Facility | 07/14/2015 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ TIH w/ 1" cement string, snub into tubing above packer and continue to ~2700 feet to spot bottom plug. |
2419687 | Primary Facility | 07/15/2015 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ pumped bottom cement plug below packer, partially TOOH w/ cement string, WOC. |
2419694 | Primary Facility | 07/20/2015 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ shot collar at 1160 feet on 4 1/2" casing. Casing pulled free. |
2420638 | Primary Facility | 10/30/2015 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Revisited site to confirm monument had been set. Site has been restored for some time since plugging. |
2445308 | Primary Facility | 2016-01-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Monument is erected. Location still in need of final reclaimation. NOVIO |
For data sources see[5]