If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-125-22289 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.188703,"lon":-80.374011,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Washington | |
| Municipality: Blaine Township | |
| Operator Name: DALLAS ENERGY LLC | |
| Well Pad ID: | |
| Farm/Lease Name: SAMUEL WOODBURN 028-A | |
| License Status: PLUGGED & ABANDONED | |
| Spud Date: | |
| Permit Date: 2006-02-01 | |
| Well Type: INJECTION | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.188703 | |
| Longitude: -80.374011 |
| Date | Event |
|---|---|
| 2006-02-01 | New Permit Application |
| 2006-02-16 | Drilling Completion |
| 2006-03-01 | Perforation |
| 2006-03-02 | Performed Stimulation |
| 2006-03-10 | Performed Spud Operation |
| 2006-04-04 | NEWLY DRILLED |
| 2015-09-08 | Drilling Completion |
| 2016-06-28 | FULLY PLUGGED |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2006-03-02 | 0 | 0 | 0 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2008 | EAST RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2010 | EAST RESOURCES MGMT LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2011 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2012 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2013 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2014 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2398764 | Primary Facility | 2015-07-13 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Discusssed PTA procedures in coal mined areas and alternate methods. NOVIO |
| 2400468 | Primary Facility | 2015-07-23 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Reviewed bond log, gave okay to plug and pull casing as planned. NOVIO |
| 2400482 | Primary Facility | 2015-07-31 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Rig waiting on SCCSO. NOVIO |
| 2400502 | Primary Facility | 2015-08-05 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Rig on location. Tbg still in place. Crew on safety shutdown day. NOVIO |
| 2418997 | Primary Facility | 2015-08-07 | Plugging(Includes Plugged/Mined Through) | No Adverse Event or Action Reported | Pipe tub and pipe rack remain on location after plugging. Cellar is covered w/ wheelbarrow, remains to be filled and area needs graded & seeded. No monument set yet. |
| 2419656 | Primary Facility | 2015-07-08 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ is finishing getting rigged up on well. Discussed upcoming activity w/ Jeff Loney and Luke Hartzell from SWEPI. |
| 2419671 | Primary Facility | 2015-07-13 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Met w/ Eric Peterson at wellsite to discuss plugging procedures w/ SWEPI & ConServ. ConServ has cut tubing above packer and retrieved it after numerous unsuccessful attempts to release packer. |
| 2419684 | Primary Facility | 2015-07-14 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ TIH w/ 1" cement string, snub into tubing above packer and continue to ~2700 feet to spot bottom plug. |
| 2419687 | Primary Facility | 2015-07-15 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ pumped bottom cement plug below packer, partially TOOH w/ cement string, WOC. |
| 2419694 | Primary Facility | 2015-07-20 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | ConServ shot collar at 1160 feet on 4 1/2" casing. Casing pulled free. |
| 2420638 | Primary Facility | 2015-10-30 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | Revisited site to confirm monument had been set. Site has been restored for some time since plugging. |
| 2445308 | Primary Facility | 2016-01-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Monument is erected. Location still in need of final reclaimation. NOVIO |
For data sources see[7]