If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-081-21194 | | Well ID: 37-081-21194 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="14" | {{#display_map: 41.390619, -76.947833 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | Municipality: [[Gamble Township, | + | | State: Pennsylvania |
+ | |- | ||
+ | | County: [[Lycoming_County,_Pennsylvania|Lycoming]] | ||
+ | |- | ||
+ | | Municipality: [[Gamble Township,_Lycoming_County,_Pennsylvania|Gamble Township]] | ||
|- | |- | ||
| Operator Name: [[ATLAS RESOURCES LLC]] | | Operator Name: [[ATLAS RESOURCES LLC]] | ||
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
| Farm/Lease Name: STUBLER PAD A 1H | | Farm/Lease Name: STUBLER PAD A 1H | ||
|- | |- | ||
− | | | + | | License Status: |
− | |||
− | |||
|- | |- | ||
| Spud Date: | | Spud Date: | ||
|- | |- | ||
− | | | + | | Permit Date: 8/26/2013 |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | Well | + | | Configuration: Horizontal Well |
− | |||
− | |||
|- | |- | ||
| Latitude: 41.390619 | | Latitude: 41.390619 | ||
|- | |- | ||
| Longitude: -76.947833 | | Longitude: -76.947833 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | |} | + | |}--> |
+ | |||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
− | !scope="col" | | + | !scope="col" | Inspection Comments |
− | + | |- | |
+ | | 2277907 | ||
+ | | Primary Facility | ||
+ | | 06/10/2014 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Perimeter controls and clay plug installed. earthmoving underway. no vio | ||
+ | |- | ||
+ | | 2288236 | ||
+ | | Primary Facility | ||
+ | | 07/17/2014 | ||
+ | | Preoperation Inspection | ||
+ | | No Violations Noted | ||
+ | | Earthmoving on the site has been completed and top-rock and swale matting remains to be installed. Hydro-seeding has been completed on the site in several applications. The first seed application is well established and the second application has already begun to sprout. The basin has exceptional vegetative growth and its baffles have been established according to specifications. The clay berm for the wetland appears to be functioning properly and no adverse impacts were observed. Several trees located in wetlands just outside the LOD were blown over by recent storms and will remain the landowners concern. The drainage swale along the access road appears to be conveying stormwater and should be seeded and stabilized with matting or rock stabilized ASAP to minimize potential for accelerated erosion. | ||
+ | |- | ||
+ | | 2299534 | ||
+ | | Primary Facility | ||
+ | | 08/21/2014 | ||
+ | | Complaint Inspection | ||
+ | | No Violations Noted | ||
+ | | Complaint Response Inspection; 8/21/2014. | ||
|- | |- | ||
| 2306267 | | 2306267 | ||
− | | 2014- | + | | Primary Facility |
+ | | 09/17/2014 | ||
+ | | Compliance Evaluation | ||
+ | | No Violations Noted | ||
+ | | In response to the previous slope failures a plan (attached) was implemented to rock armor the impacted slopes and install an underdrain to convey water from the cut slope. The previously slumped slopes have been armored and the remaining material applied and hydro-seeded. The drain was installed, but was not conveying water at the time of the inspection. Ironically water was ponded on the surface of the pad and slopes were visibly wet (indicating water seeping out). At the entrance to the site, a sump was constructed and seeded. Silt sock remains undercut and has not been effectively maintained. In addition, the heavy rubber erosion matting/channel liner has been undercut and a channel is forming. Please address this when it is practical as this channel will continue to contribute to E&S concerns. Please address these E&S measures ASAP. Overall, I am concerned for the long-term stability of this site considering the amount of water visible even now in relatively favorable (dry) conditions. | ||
+ | |- | ||
+ | | 2487056 | ||
+ | | Primary Facility | ||
+ | | 2016-05-17 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | | | + | | I entered the site off Southard Road at 10:34. The well site remains at its originally permitted/constructed size and the Stubler A 1H (081-21194) and Stubler A 3H 081-21196) renewals remain active until 8/26/2016 while the Stubler A 2H (081-21195) expired on 4/24/2016 without being drilled. Three well cellars have been installed but I found no indications that well drilling was ever initiated. |
− | + | ||
− | + | The landowner is also in the process of timbering the woods around the well pad. Evidence suggests a log skidder tracked through wetlands (being monitored as part of the well pad construction) around the well pad and across the LOD. I noticed three wetland monitoring locations that did not appear to have been disturbed but it appears that wetlands AA, EE, and D were tracked through along with the UNT to Murray Run west of the well pad. No Violations Noted. | |
− | + | |- | |
+ | | 2511041 | ||
+ | | Primary Facility | ||
+ | | 2016-08-12 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | I entered the site off Southard Road at 11:00. The well site remains at its originally permitted/constructed size and the Stubler A 1H (081-21194) and Stubler A 3H 081-21196) renewals remain active until 8/26/2016. Three well cellars have been installed but I found no indications that well drilling was ever initiated. | ||
+ | |||
+ | Logging has continued around the well pad as noted in my 5/17/2016 inspection report. I noticed three wetland monitoring locations that did not appear to have been disturbed but it appears that wetlands AA, EE, and D were tracked through along with the UNT to Murray Run west of the well pad. Erosion is now noted within the LOD north of Wetland DD caused by deep ruts from a log skidder. This earth disturbance was clearly caused by the logging operation and will be referred to the Waterways and Wetlands Program. | ||
+ | |||
+ | Violations cited on 8/21/2014 and later remained open due to erosion at the entrance can now be closed. Erosion of gravel where the access road meets the well pad appears to b | ||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Compliance Report |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-05-20 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == | + | <!--== Fracking Activities == |
− | {{ | + | ==== Fracking Jobs ==== |
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | ==References== | ||
+ | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
Well ID: 37-081-21194 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.390619,"lon":-76.947833,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Gamble Township | |
Operator Name: ATLAS RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: STUBLER PAD A 1H | |
License Status: | |
Spud Date: | |
Permit Date: 8/26/2013 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.390619 | |
Longitude: -76.947833 |
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2277907 | Primary Facility | 06/10/2014 | Routine/Complete Inspection | No Violations Noted | Perimeter controls and clay plug installed. earthmoving underway. no vio |
2288236 | Primary Facility | 07/17/2014 | Preoperation Inspection | No Violations Noted | Earthmoving on the site has been completed and top-rock and swale matting remains to be installed. Hydro-seeding has been completed on the site in several applications. The first seed application is well established and the second application has already begun to sprout. The basin has exceptional vegetative growth and its baffles have been established according to specifications. The clay berm for the wetland appears to be functioning properly and no adverse impacts were observed. Several trees located in wetlands just outside the LOD were blown over by recent storms and will remain the landowners concern. The drainage swale along the access road appears to be conveying stormwater and should be seeded and stabilized with matting or rock stabilized ASAP to minimize potential for accelerated erosion. |
2299534 | Primary Facility | 08/21/2014 | Complaint Inspection | No Violations Noted | Complaint Response Inspection; 8/21/2014. |
2306267 | Primary Facility | 09/17/2014 | Compliance Evaluation | No Violations Noted | In response to the previous slope failures a plan (attached) was implemented to rock armor the impacted slopes and install an underdrain to convey water from the cut slope. The previously slumped slopes have been armored and the remaining material applied and hydro-seeded. The drain was installed, but was not conveying water at the time of the inspection. Ironically water was ponded on the surface of the pad and slopes were visibly wet (indicating water seeping out). At the entrance to the site, a sump was constructed and seeded. Silt sock remains undercut and has not been effectively maintained. In addition, the heavy rubber erosion matting/channel liner has been undercut and a channel is forming. Please address this when it is practical as this channel will continue to contribute to E&S concerns. Please address these E&S measures ASAP. Overall, I am concerned for the long-term stability of this site considering the amount of water visible even now in relatively favorable (dry) conditions. |
2487056 | Primary Facility | 2016-05-17 | Routine/Complete Inspection | No Violations Noted | I entered the site off Southard Road at 10:34. The well site remains at its originally permitted/constructed size and the Stubler A 1H (081-21194) and Stubler A 3H 081-21196) renewals remain active until 8/26/2016 while the Stubler A 2H (081-21195) expired on 4/24/2016 without being drilled. Three well cellars have been installed but I found no indications that well drilling was ever initiated.
The landowner is also in the process of timbering the woods around the well pad. Evidence suggests a log skidder tracked through wetlands (being monitored as part of the well pad construction) around the well pad and across the LOD. I noticed three wetland monitoring locations that did not appear to have been disturbed but it appears that wetlands AA, EE, and D were tracked through along with the UNT to Murray Run west of the well pad. No Violations Noted. |
2511041 | Primary Facility | 2016-08-12 | Routine/Complete Inspection | No Violations Noted | I entered the site off Southard Road at 11:00. The well site remains at its originally permitted/constructed size and the Stubler A 1H (081-21194) and Stubler A 3H 081-21196) renewals remain active until 8/26/2016. Three well cellars have been installed but I found no indications that well drilling was ever initiated.
Logging has continued around the well pad as noted in my 5/17/2016 inspection report. I noticed three wetland monitoring locations that did not appear to have been disturbed but it appears that wetlands AA, EE, and D were tracked through along with the UNT to Murray Run west of the well pad. Erosion is now noted within the LOD north of Wetland DD caused by deep ruts from a log skidder. This earth disturbance was clearly caused by the logging operation and will be referred to the Waterways and Wetlands Program. Violations cited on 8/21/2014 and later remained open due to erosion at the entrance can now be closed. Erosion of gravel where the access road meets the well pad appears to b |
For data sources see[4]