== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-105-23268 | | Well ID: 34-105-23268 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.095200201, -81.89823719 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Ohio |
|- | |- | ||
− | | Operator Name: [[J D DRILLING | + | | County: [[Meigs_County,_Ohio|Meigs]] |
+ | |- | ||
+ | | Municipality: [[Chester,_Meigs_County,_Ohio|Chester]] | ||
+ | |- | ||
+ | | Operator Name: [[J D DRILLING COMPANY]] | ||
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: CONROY GEORGE & CLARA (SWIW #18) |
|- | |- | ||
− | | | + | | License Status: Active Injection |
|- | |- | ||
− | | | + | | License Date: 1984-10-02 |
|- | |- | ||
| Spud Date: 1984-12-30 | | Spud Date: 1984-12-30 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[C&D DRLG]] |
+ | |- | ||
+ | | Final Drill Date: 1985-01-05 | ||
+ | |- | ||
+ | | Well Total Depth: 3812 ft | ||
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | | + | | Latitude: 39.095200201 |
|- | |- | ||
− | | | + | | Longitude: -81.89823719 |
+ | |} | ||
+ | For data sources see<ref name=RBDMS>{{cite web | ||
+ | | title = RBDMS | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" style="width: 50%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | | | + | | 1997-06-29 |
+ | | style="text-align: right;" | 1900 | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2016-01-05 |
+ | | style="text-align: right;" | 3010 | ||
+ | | style="text-align: right;" | 3715 | ||
+ | | style="text-align: right;" | 20 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref name = RBDMS/> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Period |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Operator Name |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Production Days |
− | + | |- | |
− | + | | 1985 | |
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 5509 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 304 | ||
+ | |- | ||
+ | | 1986 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 5224 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 1987 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 4554 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 1988 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 3758 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 1989 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 3461 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 1990 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 3145 |
− | | | + | | style="text-align: right;" | 0 |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | |- |
− | | | + | | 1991 |
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 2900 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
+ | | 1992 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 2691 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 1993 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 2837 |
− | + | | style="text-align: right;" | 0 | |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 1994 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 3065 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 1995 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 2648 |
− | + | | style="text-align: right;" | 0 | |
− | | | + | | style="text-align: right;" | 360 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 1996 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 2540 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 1997 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 2307 |
− | + | | style="text-align: right;" | 0 | |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 1998 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 2337 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 1999 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 2212 |
− | + | | style="text-align: right;" | 0 | |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2000 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 2223 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2001 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 2208 |
− | + | | style="text-align: right;" | 0 | |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2002 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 2350 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2003 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 2127 |
− | + | | style="text-align: right;" | 0 | |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2004 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 1669 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2005 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 1416 |
− | + | | style="text-align: right;" | 0 | |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2006 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 1346 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2007 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 1287 |
− | + | | style="text-align: right;" | 0 | |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2008 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 17 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2009 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 0 |
− | + | | style="text-align: right;" | 0 | |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2010 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 7 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2011 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 50 |
− | + | | style="text-align: right;" | 0 | |
− | | | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | 0 | ||
− | |||
|- | |- | ||
+ | | 2012 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2015 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | style="text-align: right;" | 0 |
− | + | | style="text-align: right;" | 0 | |
− | | | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | 0 | ||
− | |||
|- | |- | ||
+ | | 2016 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | |} |
− | | style="text-align: | + | For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web |
− | | | + | | title = Ohio Combined Annual Production Data |
− | | | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | | + | | date = 2019-05-07 |
− | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | |
− | + | | accessdate = 2019-05-21 }}</ref> | |
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
|- | |- | ||
+ | | 1985 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 304 | ||
|- | |- | ||
− | | | + | | 1986 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | Brine |
− | + | | style="text-align: right;" | 4 | |
− | + | | style="text-align: right;" | 365 | |
− | |||
− | | | ||
|- | |- | ||
+ | | 1987 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 1988 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | Brine |
− | + | | style="text-align: right;" | 23 | |
− | + | | style="text-align: right;" | 365 | |
− | |||
− | | | ||
|- | |- | ||
+ | | 1989 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 1990 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | | | + | | Brine |
− | + | | style="text-align: right;" | 0 | |
− | + | | style="text-align: right;" | 365 | |
− | |||
− | | | ||
|- | |- | ||
+ | | 1991 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 1992 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 23 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 1993 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 1994 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 23 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 1995 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 360 | ||
|- | |- | ||
− | | | + | | 1996 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 23 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 1997 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 1998 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 23 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 1999 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2000 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 23 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2001 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2002 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 23 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2003 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2004 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 23 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2005 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2006 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 23 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2007 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 23 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2008 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 46 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2009 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 0 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2011 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
− | | | + | | 2012 |
− | | style="text-align:right;" | | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 0 | |
− | + | | style="text-align: right;" | 0 | |
− | | style="text-align:right;" | 0 | ||
− | |||
|- | |- | ||
+ | | 2015 | ||
+ | | [[J D DRILLING COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | style="text-align:right;" | 0 | + | | [[J D DRILLING COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 0 | |
− | + | | style="text-align: right;" | 0 | |
− | | style="text-align:right;" | 0 | ||
− | |||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref name=RBDMS/><ref name=Annual_Prod/> |
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Result |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Comments |
− | + | |- | |
− | + | | 000PL10687 | |
+ | | | ||
+ | | Preliminary Restoration | ||
+ | | No Violations | ||
+ | | Preliminary Restoration done information from Data Point | ||
+ | |- | ||
+ | | 0077184243 | ||
+ | | 2013-02-20 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Witnessed initial injection. Initial injection pressure of 580 psi. Injection pressure dropped from 580 psi to vacuum with-in 10 minutes and stayed on vacuum. The annulus valve was frozen solid and unable to be opened. I collected a water sample and transported it to the lab in Cambridge. | ||
+ | |- | ||
+ | | 0084747148 | ||
+ | | 2014-10-14 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the unloading pads, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at the well and containment dike. No additional work has been done to the new containment dike area. | ||
+ | |- | ||
+ | | 0105465772 | ||
+ | | 2018-06-06 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Compliance Notice # 1527008408 follow up inspection. One 210 barrel steel tank and one 100 barrel steel tank have been removed from the concrete containment dike. An High Range Quantab was used to test the water in the gravel sump outside of the south side of the concrete containment. Results were 7 on the strip which = 2488 ppm CL Meet with Nate Lane ODNR/ DOGRM ER on location to review remediation efforts. Measured the containment dike dimensions with Butch Barton. | ||
+ | |- | ||
+ | | 0139997848 | ||
+ | | 2018-03-14 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | My inspection revealed the salt water injection well was on vacuum on the tubing and 42 psi on the annulus. The dike was free of fluids. Legible identification was posted. | ||
+ | |- | ||
+ | | 0141775496 | ||
+ | | 2017-02-28 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Our records indicate that the Division has not received the Salt Water Injection Well disposal fees for the 1st, 2nd, 3rd, & 4th quarters of 2016. Please submit the appropriate reports by March 14, 2017. Fees and fee reports received 7/3/2017 | ||
+ | |- | ||
+ | | 0161070701 | ||
+ | | 2016-07-25 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the unloading pads, containment dikes, tanks, injection pump, injection manifold (Conroy and Showalter ), injection line, injection pressure and annulus pressure. Identification posted on pump house. Containment dikes were free of fluids. | ||
+ | |- | ||
+ | | 0177342137 | ||
+ | | 2018-05-22 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Compliance Notice # 1527008408 follow up inspection. JD drilling Brine truck is on site pumping out the concrete dike and removing water from the gravel area outside of the dike. I talked to Spence Carpenter and Butch Barton on site. They want to connect the tanks in the earthen dike to a pump and inject the fluid in the tanks, I told them to send a plan to the UIC section outlining their plan for operation of the facility. I reminded them that the compliance notice for contamination outside of a surface facility has a time line of 10 days. No contaminated soil has been removed from the site. Recent rain event is flushing fluid to the plastic lined pit. | ||
+ | |- | ||
+ | | 0188438875 | ||
+ | | 2018-10-31 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dikes are free of fluids. Dike A tanks are being plumbed and the tanks are being painted. Witnessed a brine truck unloading on the pad. Reviewed brine hauling logs. | ||
+ | |- | ||
+ | | 0188638524 | ||
+ | | 2016-01-06 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | No noted violations. There appears to have been a significant release of fluids into the dike recently. There was no fluid in the dike at the time of inspection. | ||
+ | |- | ||
+ | | 0199538464 | ||
+ | | 2018-10-15 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | The new dike liner in dike A is installed. The 400 barrel steel tank is being cleaned out. Reviewed surface facility construction plans with Jim Diddle on location. | ||
+ | |- | ||
+ | | 0226107741 | ||
+ | | 2013-04-12 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the containment dike, tanks, pump, unloading pad, injection pressure and annulus pressure. Identification on wellhead and dike. Dike was free of water. 4 brine line between the tanks and the injection pump was disconnected. All valves were shut. | ||
+ | |- | ||
+ | | 0240974105 | ||
+ | | 2013-10-30 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | No leaks or signs of contamination at well, tanks, or unloading pad. | ||
+ | |- | ||
+ | | 0243547150 | ||
+ | | 2012-10-16 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Observed the conversion of this Ohio Shale production well to an injection well. Met Jon Scott at the well site. Appalachian Well Surveys was at the site waiting on JD Drilling personnel. JD Drilling service truck, flatbed truck with new 100 joints of 2-3/8 inch production tubing with a measured total length of 3030 feet,, and a UIC brine truck filled with fresh water were also parked around the wellhead. Appalachian logged the well with gamma ray-collar locator logs. Rigged up a 60-feet perforator string, one shot per foot and shot perfs at 3668 to 3728 interval to enhance injection capacity of brine combined with existing perforations in the upper Ohio Shale. JD used a refurbished Halliburton R4 Packer with three shear pins in place, each rated at 6600 lbs of shear before failure for a total of 19800 lbs. They lowered the packer into the hole to a depth of 2978.2 feet with 98 joints of the 100 on location. They tried to flush the perfs with some of their water but lost all of their supply due to vacuum down the hole. So they had to get a new supply of fresh water and Baker Hughes inhibitor to perform the mechanical annular space integrity test.. Using the tubing JR Drilling seated the packer at 2978.2 feet with 25,000 lbs total pull on drill pipe and packer with 12,500 lbs on packer. They poured their fresh water with inhibitor down the hole but not slowly. The well continued to burp air and water forcefully so they decided to let it settle over night. Shut down until tomorrow | ||
+ | |- | ||
+ | | 0284237767 | ||
+ | | 2017-05-15 | ||
+ | | Salt Water Injection Well | ||
+ | | Violations Noted | ||
+ | | Our records indicate that the Division has not received the Salt Water Injection Well Annual Report (Form 204) that was due on April 15th for 2016, despite a letter that was sent April 28, 2017 with a deadline of May 12, 2017 to submit the reports requested. please submit the requested Forms to the Division by 5/26/2017.REPORTS RECEIVED 7/3/2017 | ||
+ | |- | ||
+ | | 0323825430 | ||
+ | | 2016-03-16 | ||
+ | | Salt Water Injection Well | ||
+ | | Violations Noted | ||
+ | | Our records indicate that the Division has not received the Salt Water Injection Well Annual Report (Form 204) that was due on February 15th for 2015, despite a letter that was sent March 1, 2016 with a deadline of March 15, 2016 to submit the reports requested. Form 204 received 7/13/2017 | ||
+ | |- | ||
+ | | 0326601536 | ||
+ | | 2018-09-18 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the containment dikes, tanks, injection pump, injection pressure and annulus pressure. JD Drilling crew is in the process of removing equipment from dike A. They are waiting on a crane to remove the tanks from dike A. | ||
+ | |- | ||
+ | | 0341940266 | ||
+ | | 2015-10-09 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | No noted vioaltions. | ||
+ | |- | ||
+ | | 0389454341 | ||
+ | | 2015-05-27 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Review of site facilities and well head conditions. No noted violations. | ||
+ | |- | ||
+ | | 0397870735 | ||
+ | | 2013-07-10 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Unloading pad and dike around tanks were in good condition. | ||
+ | |- | ||
+ | | 0443323385 | ||
+ | | 2014-05-21 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Follow up to -560805446. Witnessed A fresh water MIT mini test was administered and the annulus held 400 psi for 15 minutes with zero drop in pressure. | ||
+ | |- | ||
+ | | 0459912636 | ||
+ | | 2012-12-04 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Access road is gravel with a gravel parking lot. Unloading pad has been constructed. Concrete dike is completed. Currently installing electric poles for the service line. | ||
+ | |- | ||
+ | | 0507726400 | ||
+ | | 2017-08-30 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | My inspection today revealed the salt water injection well had 290 psi on the annulus and the injection tubing was on vacuum. The dike was free of fluids, no violations noted. | ||
+ | |- | ||
+ | | 0559357375 | ||
+ | | 2016-10-14 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection pressure, and annulus pressure. Identification posted. Containment dikes are free of fluid. Injection pressure is on vacuum. | ||
+ | |- | ||
+ | | 0560805446 | ||
+ | | 2014-05-20 | ||
+ | | Salt Water Injection Well | ||
+ | | Violations Noted | ||
+ | | The annulus had zero pressure on it at the time of inspection, but the injection was on vacuum. Well shall be shut in and a mini MIT shall be administered in order to prove mechanical integrity before injection is allowed to proceed. | ||
+ | |- | ||
+ | | 0580345375 | ||
+ | | 2014-12-04 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Currently waiting on the 30 mil containment dike liner for the 2nd containment dike. Sand is on site. | ||
+ | |- | ||
+ | | 0648904379 | ||
+ | | 2018-10-12 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Installing the spray in dike liner in dike A. | ||
+ | |- | ||
+ | | 0670097591 | ||
+ | | 2018-09-14 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | JD Drilling crew has removed one 210 barrel steel tank from dike A and has relocated two 100 barrel steel tanks to an earthen containment dike North West of dike B at GPS +/- 11 feet N39.09558 / W081.89832. | ||
+ | |- | ||
+ | | 0680952402 | ||
+ | | 2017-02-23 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the containment dikes, tanks, injection pump, injection pressure and annulus pressure. Identification posted. The containment dikes are free of fluids. | ||
+ | |- | ||
+ | | 0806164535 | ||
+ | | 2015-03-19 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | No noted violations at the time of inspection. | ||
+ | |- | ||
+ | | 0816382428 | ||
+ | | 2013-05-29 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Good identification. No issues with dike, tanks, or loading pad. | ||
+ | |- | ||
+ | | 0834582962 | ||
+ | | 2019-03-21 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Installation of a new injection line manifold connecting the Conroy containment dikes A & B to the Conroy and Showalter salt water injection wells. The manifold has valves to direct the brine to either injection well(s) or allow the containment dikes to be segregated. The primary connections to the manifold are for dike A to connect to the Showalter well and dike B to connect to the Conroy well. The manifold was tested to the Conroy injection tubing master valve, the Showalter injection line valve on the facility side of the line, The injection line from dike A and the injection line from dike B. Tested at 880 psi at 5 minutes 855 at 15 minutes 830 psi. 1st test failed. A 2nd test at 825 psi, at 5 minutes 820 psi, at 15 minutes 815 psi. Test passed. JD Drilling Supervisor was informed that the test pressure of 825psi instead of 880 psi will result in the lowering of the max injection pressure for the Conroy well. | ||
+ | |- | ||
+ | | 0952353910 | ||
+ | | 2014-09-10 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Good identification posted at well and containment dike. Met with Jim Diddle and Spence Carpenter on site to review plans for a second unloading pad. | ||
|- | |- | ||
− | | -1048406739 | + | | 1046595633 |
+ | | 2019-04-29 | ||
+ | | Salt Water Injection Well | ||
+ | | Violations Noted | ||
+ | | Our records indicate that the Division has not received the Salt Water Injection Well Annual Report (Form 204) that was due on April 15th for 2018, Please submit the Form 204 to the Division by 5/29/2019. | ||
+ | |- | ||
+ | | 1048406739 | ||
| 2013-05-22 | | 2013-05-22 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Inspected the injection pressure, annulus pressure, unloading pad, containment dike and tanks. Dike is free of oil and water. Establishing vegetative cover on bare areas. Seed and straw have been applied to location. Access road has gate that is lockable. | | Inspected the injection pressure, annulus pressure, unloading pad, containment dike and tanks. Dike is free of oil and water. Establishing vegetative cover on bare areas. Seed and straw have been applied to location. Access road has gate that is lockable. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1126847620 | | 1126847620 | ||
| 2015-04-07 | | 2015-04-07 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection manifold connecting the Conroy and Showalter injection wells to this facility. The manifold was tested today at 1020 psi for 15 minutes with no loss in pressure, Identification posted at the well. Containment dikes are free of water. | | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection manifold connecting the Conroy and Showalter injection wells to this facility. The manifold was tested today at 1020 psi for 15 minutes with no loss in pressure, Identification posted at the well. Containment dikes are free of water. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1186298023 | ||
+ | | 2018-11-14 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Surface facility inspection with UIC Supervisor and UIC Geologist. | ||
|- | |- | ||
− | | | + | | 1200455161 |
| 2012-06-25 | | 2012-06-25 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Well does not appear to be in use for injection. No equipment or lines on site. All valves closed at wellhead. Unable to test pressures at well. | | Well does not appear to be in use for injection. No equipment or lines on site. All valves closed at wellhead. Unable to test pressures at well. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1208076800 | ||
+ | | 2015-10-06 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Inspected the surface facility with UIC Section Geologist. Measured containment dike and documented tank connections. | ||
|- | |- | ||
− | | | + | | 1227901331 |
| 2015-04-28 | | 2015-04-28 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| No noted violations. | | No noted violations. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1241762147 | ||
+ | | 2015-07-22 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Reviewed brine hauling logs on trucks unloading on the pad. | ||
|- | |- | ||
| 1251542102 | | 1251542102 | ||
| 2013-10-09 | | 2013-10-09 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Inspected the unloading pad, containment dike, tanks, annulus pressure, and injection pressure. Containment dike is free of water. Good identification at the wellhead and containment dike. | | Inspected the unloading pad, containment dike, tanks, annulus pressure, and injection pressure. Containment dike is free of water. Good identification at the wellhead and containment dike. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1257851502 | | 1257851502 | ||
| 2014-10-06 | | 2014-10-06 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Inspected the unloading pads, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Identification posted at well and containment dike. Currently working on the second containment dike. | | Inspected the unloading pads, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Identification posted at well and containment dike. Currently working on the second containment dike. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1286474651 | | 1286474651 | ||
| 2010-10-06 | | 2010-10-06 | ||
− | | | + | | Salt Water Injection Well |
− | | Convert to SWIW inspection request from Tom Tomastik. Well site is located in a corn field. Corn crop is on 3 sides with the 4th side a wood line with pine trees and mixed hard woods. There are three water wells with in 1/2 mile (2640 | + | | No Violations |
− | + | | Convert to SWIW inspection request from Tom Tomastik. Well site is located in a corn field. Corn crop is on 3 sides with the 4th side a wood line with pine trees and mixed hard woods. There are three water wells with in 1/2 mile (2640). (1) Windon is 1240 South West of proposed Injection well. (2) Millhone is 1189 East of the proposed Injection Well. (3) Nutzling is 1550 East of the proposed Injection well. There are two intermittent streams (1) 1832 to West of proposed Injection well. (2) 2302 to East of the proposed Injection well. Production well has good identification. Well is equipped with 7 casing head, 4 1/2 casing head, with 1 1/2 tubing (valve on tubing is closed). Well has a 2 black plastic line that is connected to a 1100 gallon plastic tank (tank is empty). Well is not connected for gas production. No leaks or contamination observed during inspection. Well site has good vegetative cover established. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1316561633 | | 1316561633 | ||
| 2012-10-17 | | 2012-10-17 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Topped off annulus with 2 barrels fresh water. Pumped annular pressure to 800 psi then pressure dropped rapidly. Pulled more tension on tubing and packer total of 26,000 lbs. Tested three aditional times using 15 gallons of fresh water. Unable to hold 880 psi for 15 minutes with no more than 5% loss. Pulled more tension on the packer 27,000 lbs. Tested at 910 psi for 15 minutes with no decline in pressure. Test passed. | | Topped off annulus with 2 barrels fresh water. Pumped annular pressure to 800 psi then pressure dropped rapidly. Pulled more tension on tubing and packer total of 26,000 lbs. Tested three aditional times using 15 gallons of fresh water. Unable to hold 880 psi for 15 minutes with no more than 5% loss. Pulled more tension on the packer 27,000 lbs. Tested at 910 psi for 15 minutes with no decline in pressure. Test passed. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1327154324 | ||
+ | | 2015-09-10 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. | ||
|- | |- | ||
| 1350416109 | | 1350416109 | ||
| 2012-10-16 | | 2012-10-16 | ||
− | | | + | | Salt Water Injection Well |
− | | Conversion to salt water injection well. Appalachian Well Surveys logged (Gamma Ray CCL) and perforated the 4.5 casing from 3728 | + | | No Violations |
− | + | | Conversion to salt water injection well. Appalachian Well Surveys logged (Gamma Ray CCL) and perforated the 4.5 casing from 3728 to 3668 (60 shots). Wire line total depth was 3764. Halliburton R-4 (rebuilt) Packer set at 2978 with new 2 3/8 R-2 10 round tubing. Packer ran with 3 shear pins. Packer set at 25,000 lbs (tubing string weight 12,500 lbs). Packer was set at 25,000lbs. Annulus was filled with 30 barrels fresh water and 4 gallons inhibitor. Unable to test annulus due to air in the annulus. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1350555475 | | 1350555475 | ||
| 2012-10-17 | | 2012-10-17 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Well settled down over night. Water was added on top of the packer too quickly entrapping air. This caused the well to burp air and water. The operator decided to wait until the next day to continue the mechanical integrity test on the packer. Performed three failed mechanical integrity test at the beginning of the morning, reseating the packer after each test with increasingly higher pull pressure on the drill string and packer. The fourth reseating of the packer had a total pull weight on the drill string and packer of 27000 lbs, with approximately 14000 pounds of that applied to the packer. The maximum allowable injection pressure on this well was permitted at 880 psi. This last mechanical integrity test started at 910 psi and stayed at that pressure for 15 minutes. It passed. | | Well settled down over night. Water was added on top of the packer too quickly entrapping air. This caused the well to burp air and water. The operator decided to wait until the next day to continue the mechanical integrity test on the packer. Performed three failed mechanical integrity test at the beginning of the morning, reseating the packer after each test with increasingly higher pull pressure on the drill string and packer. The fourth reseating of the packer had a total pull weight on the drill string and packer of 27000 lbs, with approximately 14000 pounds of that applied to the packer. The maximum allowable injection pressure on this well was permitted at 880 psi. This last mechanical integrity test started at 910 psi and stayed at that pressure for 15 minutes. It passed. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1356633494 | | 1356633494 | ||
| 2012-12-27 | | 2012-12-27 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Surface facility construction ongoing. Well is not connected to injection line. Checked injection tubing pressure (formation pressure) and annulus pressure. | | Surface facility construction ongoing. Well is not connected to injection line. Checked injection tubing pressure (formation pressure) and annulus pressure. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1358443513 | | 1358443513 | ||
| 2013-01-17 | | 2013-01-17 | ||
− | | | + | | Surface Facility Construction |
+ | | No Violations | ||
| The concrete pads have been poured and the tanks are set. The lines are being laid down today. The injection line to the well has not been set. | | The concrete pads have been poured and the tanks are set. The lines are being laid down today. The injection line to the well has not been set. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1361378405 | | 1361378405 | ||
| 2013-02-20 | | 2013-02-20 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Injection operations began today and I accompanied Jon Scott on an inspection of the facilities. | | Injection operations began today and I accompanied Jon Scott on an inspection of the facilities. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1361480275 | | 1361480275 | ||
| 2013-02-21 | | 2013-02-21 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Inspected the unloading pad, Containment dike. Checked the injection pressure and the annulus pressure. | | Inspected the unloading pad, Containment dike. Checked the injection pressure and the annulus pressure. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1372584698 | | 1372584698 | ||
| 2012-11-15 | | 2012-11-15 | ||
− | | | + | | Surface Facility Construction |
− | | Dike formed area 34 | + | | No Violations |
− | + | | Dike formed area 34 by 55. Pouring concrete walls and slab. Used 6 bag mix concrete with wire reinforcement. 60 yards ordered. 8 thick slab. | |
− | |||
− | |||
|- | |- | ||
+ | | 1404582517 | ||
+ | | 2018-06-18 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | The tanks with-in the the concrete containment dike have been disconnected from the injection operations. The Earthen dike with six 400 barrel tanks ( four of the 400 barrel tanks are connected at the bottom) Is connected to an injection pump and injection line manifold that connectes to the Conroy and Showalter injection wells. | ||
|- | |- | ||
| 1411060821 | | 1411060821 | ||
| 2014-09-18 | | 2014-09-18 | ||
− | | | + | | Surface Facility Construction |
− | | Second unloading pad is being constructed today. Pad will be 60 | + | | No Violations |
− | + | | Second unloading pad is being constructed today. Pad will be 60 by 14 concrete with wire reinforcement. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1416417232 | | 1416417232 | ||
| 2014-11-19 | | 2014-11-19 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Inspected the unloading pads, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. The construction of the second containment dike has not progressed past the excavation of soil and the build up of the dike walls. | | Inspected the unloading pads, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. The construction of the second containment dike has not progressed past the excavation of soil and the build up of the dike walls. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1416866876 | | 1416866876 | ||
| 2014-11-24 | | 2014-11-24 | ||
− | | | + | | Surface Facility Construction |
+ | | No Violations | ||
| Witnessed company constructing dike for tank placement. | | Witnessed company constructing dike for tank placement. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1419350873 | | 1419350873 | ||
| 2014-12-23 | | 2014-12-23 | ||
− | | | + | | Surface Facility Construction |
+ | | No Violations | ||
| Constructing second containment dike. 30 mil liner has been installed with a layer of sand below the liner and a layer of sand on top of the liner. Geo fabric has been installed over the top layer of sand. Currently installing two 400 barrel steel tanks in the containment dike. | | Constructing second containment dike. 30 mil liner has been installed with a layer of sand below the liner and a layer of sand on top of the liner. Geo fabric has been installed over the top layer of sand. Currently installing two 400 barrel steel tanks in the containment dike. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1430761544 | | 1430761544 | ||
| 2015-05-04 | | 2015-05-04 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted at well. | | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted at well. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1456775179 | ||
+ | | 2016-02-29 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the containment dikes, tanks, unload pads, injection pump, injection line, injection pressure and annulus pressure. The cement containment dike had 2of oil and water in one half of the dike. I called Jonathan Reese and informed him of the water in the containment dike. Butch Barton came to the surface facility and turned on the sump pump. The pump had been shut off due to the lines freezing. | ||
|- | |- | ||
− | | | + | | 1467681564 |
| 2014-11-19 | | 2014-11-19 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| No violations at facility. Company has begun construction on dike associated with new tank battery. | | No violations at facility. Company has begun construction on dike associated with new tank battery. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1513705399 | | 1513705399 | ||
| 2004-06-02 | | 2004-06-02 | ||
− | | | + | | Production Wells |
+ | | No Violations | ||
| No violations at the time of inspection. | | No violations at the time of inspection. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1518112873 | ||
+ | | 2018-09-26 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Witnessed brine trucks unloading on the pads. Reviewed brine hauling logs. The containment dikes are free of fluid. Identification is posted. | ||
+ | |- | ||
+ | | 1527008408 | ||
+ | | 2018-05-21 | ||
+ | | Salt Water Injection Well | ||
+ | | Violations Noted | ||
+ | | Follow up inspection to determine extent of out of containment contamination as a result of the facility fire on 5-20-2018. The containment dike over flowed at a low point at the south east corner of the concrete containment dike. Brine and oil over flowed the edge of containment and into a gravel and sand layer that surrounds the outside of the containment. This gravel and sand layer has a 4 inch PVC drain pipe that flows north east of the containment. Brine was observed flowing from the 4inch drain pipe to the wood line approximately 22 feet in length by a varying width from 2 feet to 7 feet. Three High Range Quantabs were used to test the flow from the 4 inch pipe. All three Quantabs maxed out at over 6620 ppm Cl. A soil sample collected in the area between the concrete dike and the earthen dike at 12 inches deep tested 2277 ppm Cl. A sample of the water standing outside the concrete dike east side maxed out at over 6620 ppm Cl. ODNR DOGRM ER Lane was called to inform him of the testing results. Jim Diddle, Spence Carpenter and Butch Barton were on site. They were instructed to remove contaminated material and fluids from the location. All fluids to be sent to an approved UIC facility and the contaminated material is to be hauled to an EPA approved landfill. A small plastic lined pit was constructed below the 4 inch PVC pipe outlet. A sump pump was placed into the pit and the water is being pumped back into concrete containment. | ||
+ | |- | ||
+ | | 1527602037 | ||
+ | | 2018-05-23 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Compliance Notice # 1527008408 follow up inspection. JD Drilling crew has excavated sand and gravel from the area between the concrete containment dike and the earthen containment dike. A field test of the soil between the containment dikes revealed 2488 ppm Cl. The discharge from the 4 inch PVC pipe is being collected in a plastic lined sump. The discharge water was tested with High Range Quantabs that revealed 776 ppm Cl. The gravel area outside of the concrete containment dike (south side) has been excavated and the water in the gravel and clay was tested with High Range Quantabs that revealed 3299 ppm Cl. ( this was after a rain event.) A JD Drilling Vac truck is on site to collect the water outside of the containment. | ||
+ | |- | ||
+ | | 1528119731 | ||
+ | | 2018-05-29 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Compliance Notice # 1527008408 follow up inspection. Meet with ODNR DOGRM ER Lane on site. Reviewed the clean up efforts to date. There are two roll off boxes on the upper unloading pad. High Range Quantabs were used to field test the water in the sump out side of the south end of the containment dike. The Quantab was maxed out at over 6298 ppm Cl. The 4 inch PVC pipe had zero flow during the inspection. | ||
+ | |- | ||
+ | | 1529002297 | ||
+ | | 2018-06-14 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | My inspection revealed the well was not in operation. I met with Mr. Jim Diddle with JD OIL and informed him he could not use dike A due to the fact it is not in compliance with the existing tanks. He could use dike B but not until the remainder of the pollution was removed. I was accompanied but Mr. Nate Lane with ODNR emergency response. The last part of the clean up was a excavation that was approximately 20 feet long by 3 feet wide by 2 feet deep. The contaminated soil was removed. This satisfies the compliance notice. | ||
+ | |- | ||
+ | | 1529348292 | ||
+ | | 2018-06-18 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Compliance Notice # 1527008408 follow up inspection. The contamination outside of the concrete containment dike has been remediated. The two roll off boxes have been moved from the location to the C+L yard waiting on soil profile testing for disposal. | ||
+ | |- | ||
+ | | 1531415739 | ||
+ | | 2018-07-09 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the containment dikes, tanks, injection line, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dikes are free of fluids. The 400 barrel tanks in the lined earthen dike are connected to the injection pump. The access road gate was locked during the inspection. | ||
+ | |- | ||
+ | | 1539281026 | ||
+ | | 2018-10-09 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Installing metal supports and metal side wall extensions on dike A. Cleaning out concrete dike. | ||
+ | |- | ||
+ | | 1540298787 | ||
+ | | 2018-10-18 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | JD Drilling tested the gravity flow unload pad drain lines by installing a plug down slope at the containment dike and filling the drain lines with fresh water until the lines were full. The drain were monitored for 1 hour with no signs of loss. The unload lines from the unload pads to the knock out tank in dike B were tested with fresh water pumped from the vacuum truck to the tank, with no signs of leakage. | ||
|- | |- | ||
| 1540637698 | | 1540637698 | ||
| 2015-01-07 | | 2015-01-07 | ||
− | | | + | | Surface Facility Construction |
+ | | No Violations | ||
| Installing plumbing on the 2 new 400 barrel steel tanks in the new containment dike. | | Installing plumbing on the 2 new 400 barrel steel tanks in the new containment dike. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1541348214 | ||
+ | | 2017-04-11 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids. | ||
+ | |- | ||
+ | | 1542702587 | ||
+ | | 2015-10-23 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, Injection pressure and annulus pressure. Dikes are free of fluids. Identification posted at facility and well. | ||
+ | |- | ||
+ | | 1549641181 | ||
+ | | 2019-01-24 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Witnessed the changing of the tank connections in dike B. There are 6- 400 barrel tanks in the containment. Two sets of 3 tanks are connected at the bottom. Each set of 3 tanks has a small pump that pumps water into a filter housing and then into the injection line manifold that is connected to the Conroy dike A tanks and the Conroy and Showalter injection lines. | ||
+ | |- | ||
+ | | 1553610773 | ||
+ | | 2019-03-20 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Installation of a new injection line manifold connecting the Conroy containment dikes A & B to the Conroy and Showalter salt water injection wells. The manifold has valves to direct the brine to either injection well(s) or allow the containment dikes to be segregated. The primary connections to the manifold are for dike A to connect to the Showalter well and dike B to connect to the Conroy well. The manifold was tested to the Conroy injection tubing master valve, the Showalter injection line valve on the facility side of the line, The injection line from dike A and the injection line from dike B. The line from dike B had air pockets that failed multiple tests. The valve on the manifold connecting dike B was closed and the manifold tested at 880 psi for 15 minutes with no loss in pressure. The 3 inch line connecting dike B and the manifold did not pass. JD crew is going to allow the air to work out of the 3 inch line over night. A test is scheduled for 3-21-19. | ||
+ | |- | ||
+ | | 1580209380 | ||
+ | | 2018-05-25 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Compliance Notice # 1527008408 follow up inspection. Roll off box 200216 is on the upper unloading pad. JD crew is excavating contaminated soil and putting it into the roll off box. The soil down slope from the 4 inch PVC pipe has was tested in the field at 8 inches with Cl levels at 776 - 845 ppm cl. An additional 4-6 inches of material was removed and the soil was tested in the field in two locations 1st 1.8 on high range Quantab, 2nd 1.4 on high range Quantab. The gravel sump on outside of containment (south side) maxed out the high range Quantab. (more than 6298 ppm Cl. | ||
+ | |- | ||
+ | | 1620279381 | ||
+ | | 2016-05-25 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the containment dikes, tanks, unloading pads, injection pump, injection line, injection pressure and annulus pressure. Identification posted on the facility. Containment dikes are free of fluids. | ||
+ | |- | ||
+ | | 1704017479 | ||
+ | | 2018-02-16 | ||
+ | | Salt Water Injection Well | ||
+ | | Violations Noted | ||
+ | | Our records indicate that the Division has not received the Salt Water Injection Well disposal fees for the 1st, 2nd, 3rd, & 4th quarter of 2017 . Please submit the appropriate reports by March 17, 2018. Reports received 5/11/2018 | ||
+ | |- | ||
+ | | 1720988588 | ||
+ | | 2019-05-02 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the unloading pad, containment dikes, tanks, injection pumps, injection pressure and annulus pressure. Identification is posted. The containment dikes are free of fluids. | ||
+ | |- | ||
+ | | 1767322725 | ||
+ | | 2019-01-03 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dikes are free of fluids. | ||
|- | |- | ||
| 1769069770 | | 1769069770 | ||
| 2014-11-24 | | 2014-11-24 | ||
− | | | + | | Surface Facility Construction |
+ | | No Violations | ||
| I stopped back at the site to see if the company had begun layering the sand or laying the liner in the pit yet. They were still doing dirt work at the site. | | I stopped back at the site to see if the company had begun layering the sand or laying the liner in the pit yet. They were still doing dirt work at the site. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1779912114 | ||
+ | | 2019-03-06 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Meet with Butch Barton on site. They are replacing the existing injection line manifold from the two containment dikes to the Conroy and Showalter injection wells. | ||
|- | |- | ||
| 1791242897 | | 1791242897 | ||
| 2012-12-19 | | 2012-12-19 | ||
− | | | + | | Surface Facility Construction |
+ | | No Violations | ||
| Installed three 210 barrel tanks, two 100 barrel tanks and one 400 barrel tank in dike. | | Installed three 210 barrel tanks, two 100 barrel tanks and one 400 barrel tank in dike. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1819321786 | ||
+ | | 2018-06-07 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Test the injection line manifold from the filter housing outlet to the Conroy Master valve and to the Showalter injection line valve. Test at 885 psi, at 5 minutes 880 psi, at 15 minutes 880 psi. Test passed. Butch Barton demonstrated with a vacuum truck full of fresh water the unload line integrity from the lower pad to the tanks and then switched to the upper unload pad line and a leak was observed at the 4 inch strainer threaded connection. The connection was repaired. Both unload pad drains were plugged off at the containment dike and filled with fresh water for 40 minutes with no loss in fluid. The unload pad line plug was removed and the fluid level at the unload pads dropped. | ||
+ | |- | ||
+ | | 1828072346 | ||
+ | | 2018-11-29 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the unloading pads, containment dikes (A&B), tanks, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dikes (A&B) are free of fluid. | ||
|- | |- | ||
| 1830109954 | | 1830109954 | ||
| 2012-11-09 | | 2012-11-09 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Checked injection tubing pressure and annulus pressure. Injection tubing not connected to equipment. Tubing pressure is formation pressure. Crew on site digging dike foundation. | | Checked injection tubing pressure and annulus pressure. Injection tubing not connected to equipment. Tubing pressure is formation pressure. Crew on site digging dike foundation. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1866521774 | ||
+ | | 2018-10-10 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Installing dike liner material and started to spray in dike liner. Rain event stopped the installation. | ||
|- | |- | ||
− | | | + | | 1966946755 |
| 2014-08-26 | | 2014-08-26 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Inspected the unloading pad, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Good identification posted on well and tank. Concrete containment dike has multiple cracks that need repaired. I called Jonathan Reese and left a message about the need to repair the cracks. | | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Good identification posted on well and tank. Concrete containment dike has multiple cracks that need repaired. I called Jonathan Reese and left a message about the need to repair the cracks. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2010247437 | | 2010247437 | ||
| 2014-02-25 | | 2014-02-25 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| Upon inspection it was noticed the injection tubing was on vacuum and annulus had zero psi. I met tom Schoonover in the field and we noticed the production casing head had developed a small leak around the threads. A fresh water MIT mini test was administered and the annulus held 405 psi for 15 minutes with zero drop in pressure. | | Upon inspection it was noticed the injection tubing was on vacuum and annulus had zero psi. I met tom Schoonover in the field and we noticed the production casing head had developed a small leak around the threads. A fresh water MIT mini test was administered and the annulus held 405 psi for 15 minutes with zero drop in pressure. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2011375635 | ||
+ | | 2016-12-20 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | inspected the containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The concrete containment dike had 12 inches of water in it. The sump pump line to the tank had frozen and separated, causing the pump to circulate the water in the dike. I contacted Jonathan Reese and he sent Butch Barton to the facility. Butch repaired the separated sump pump line and is pumping the water into the tank. All fluids were contained with in the dike. | ||
|- | |- | ||
− | | | + | | 2025441506 |
| 2009-05-01 | | 2009-05-01 | ||
− | | | + | | Production Wells |
+ | | No Violations | ||
| No violations were found. | | No violations were found. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2043116525 | ||
+ | | 2018-05-29 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Compliance Notice # 1527008408 follow up inspection. Roll off box #s 200216 and 220280 are on the upper unloading pad. Meet with ODNR/ DOGRM ER Lane on site to review clean up efforts. Tested gravel sump outside of containment (south side) with High Range Quantab. It maxed out the Quantab (more than 6298 ppm Cl. There was no flow from the 4 inch PVC pipe). | ||
+ | |- | ||
+ | | 2043971253 | ||
+ | | 2018-05-09 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Inspected the containment dikes, tanks, unloading pads, injection pump, injection line, injection pressure. Identification is posted. The containment dikes are free of fluids. Witnessed brine trucks unloading on the pad. Reviewed brine hauling logs. | ||
+ | |- | ||
+ | | 2057873217 | ||
+ | | 2019-01-03 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Test injection lines at the surface facility. Test the new 3 inch Flex Pipe Systems line from dike B filter housing outlet valve to the injection line manifold, Test the injection line manifold after new ball valves have been installed, test the injection line to the Conroy injection tubing master valve, test the injection line to the Showalter injection tubing master valve. Injection line test at 905 psi, at 5 minutes 895 psi, at 15 minutes 880 psi. | ||
+ | |- | ||
+ | | 2060390121 | ||
+ | | 2018-05-31 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Compliance Notice # 1527008408 follow up inspection. Field tested the sump on the outside south end of the containment dike with high range Quantab 8.6 on the strip = 5782 ppm Tested the water at the 4 inch PVC drain pipe with high range Quantab 5.6 on the strip = 1379 ppm Cl. Checked the injection pressure and annulus pressure. Tested the injection line manifold to the Conroy and Showalter injection wells at 290 psi. At 5 minutes 290 psi. at 15 minutes 290 psi. I talked to Butch Barton on site about the test pressure and that this will be the new max injection pressure for the Conroy and Showalter injection wells. | ||
+ | |- | ||
+ | | 2130782284 | ||
+ | | 2017-07-24 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | I inspected the two new 400 barrel tanks that were installed inside the dike. The tanks are not connected to the existing tank battery. These tanks will be used for additional storage. Pictures were taken of the tanks showing no connections. During my inspection, I checked the injection well. The annulus had 217 PSI while the tubing was on vacuum. | ||
+ | |- | ||
+ | | 2131910760 | ||
+ | | 2018-05-04 | ||
+ | | Salt Water Injection Well | ||
+ | | Violations Noted | ||
+ | | Our records indicate that the Division has not received the 2017 Salt Water Injection Well Annual Report (Form 204) that was due to the Division by April 15, 2018. Please submit the requested report by June 4, 2018. Form 204 received 6/21/2018 | ||
|- | |- | ||
| 2144823656 | | 2144823656 | ||
| 2014-07-24 | | 2014-07-24 | ||
− | | | + | | Salt Water Injection Well |
+ | | No Violations | ||
| No noted violations. | | No noted violations. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | |} | ||
+ | ==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
|- | |- | ||
− | | | + | | 0284237767 |
− | | | + | | US-OH-122951 |
− | | | + | | 2017-07-13 |
− | | | + | | 9-3-04B |
− | + | | Failure to file salt water injection annual report | |
− | |||
− | |||
|- | |- | ||
+ | | 0323825430 | ||
+ | | US-OH-123398 | ||
+ | | 2017-07-13 | ||
+ | | 9-3-04B | ||
+ | | Failure to file salt water injection annual report | ||
|- | |- | ||
− | | | + | | 0560805446 |
− | | | + | | US-OH-126188 |
− | + | | 2014-05-21 | |
− | |||
− | | | ||
| | | | ||
+ | | Failure to monitor annulus pressure | ||
+ | |- | ||
+ | | 1046595633 | ||
+ | | US-OH-100730 | ||
+ | | 2019-05-09 | ||
| | | | ||
+ | | Failure to file salt water injection annual report | ||
+ | |- | ||
+ | | 1527008408 | ||
+ | | US-OH-114616 | ||
+ | | 2018-08-13 | ||
+ | | 9-3-05(A)6 | ||
+ | | Contamination at surface facility (permit after 6-1-82) | ||
|- | |- | ||
+ | | 1704017479 | ||
+ | | US-OH-116893 | ||
+ | | 2018-08-03 | ||
+ | | NONE | ||
+ | | Failure to report disposal fees | ||
|- | |- | ||
− | | | + | | 2131910760 |
− | | | + | | US-OH-121848 |
− | | | + | | 2018-08-03 |
− | |||
− | |||
− | |||
| | | | ||
+ | | Failure to file salt water injection annual report | ||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref name=RBDMS/> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
|- | |- | ||
− | | | + | |}--> |
− | | | + | <!--==== Fluid Composition Data ==== |
− | | | + | {| class="wikitable sortable" style="width: 100%" |
− | | | + | !scope="col" style="text-align: center"| Job Number |
− | | | + | !scope="col" style="text-align: center"| Trade Name |
− | | | + | !scope="col" style="text-align: center"| Supplier |
− | | | + | !scope="col" style="text-align: center"| Purpose |
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
|- | |- | ||
+ | |}--> | ||
+ | |||
+ | == Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | | N2 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
| | | | ||
| | | | ||
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | | Not Treated | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
| | | | ||
+ | | FRAC;N2 | ||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref name = RBDMS/> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
|- | |- | ||
− | | | + | | CO |
− | | | + | | 1984-10-02 |
− | + | | 116 J D DRILLING CO GeoDate 10/2/84 | |
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
+ | | Oil and Gas | ||
+ | | 1984-10-02 | ||
+ | | Issued Date 10/2/84 Expired Date 3/31/85 Acres 0057500 Tool Type RTA Proposed Formation OHIO SHALE Proposed Depth 03812 Proposed Drill Depth 03812 | ||
|- | |- | ||
− | | | + | | Original Spud |
− | | | + | | 1984-12-30 |
− | |||
− | |||
| | | | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | Completed |
− | | | + | | 1985-01-05 |
− | |||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
− | | | + | | Reached Total Depth |
− | + | | 1985-01-05 | |
− | | | ||
− | |||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
− | | | + | | Completion Report Received |
− | + | | 1985-11-22 | |
− | | | ||
− | |||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
+ | | APP | ||
+ | | 2010-10-19 | ||
+ | | Proposed Formations:OHIO SHALE, Issued Date:10/19/2010, Expired Date:10/18/2012 12:00:00 PM, Drilling unit acres:57.5, Proposed Well Type:SWD, Proposed Well Class:SWIW | ||
|- | |- | ||
− | | | + | | Annulus Pressure Monitoring Approved |
− | | | + | | 2012-10-16 |
− | |||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
− | | | + | | Construction Permit Expires |
− | + | | 2012-10-18 | |
− | | | ||
| | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | Last Compliance Report |
− | | | + | | 2012-10-22 |
− | |||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
− | | | + | | Record Last Modified |
− | + | | 2015-09-24 | |
− | |||
− | |||
− | |||
− | |||
− | | | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref name=RBDMS/> |
− | + | ==References== | |
− | + | <references/> | |
− | |||
− | |||
− | |||
− | == References == | ||
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-105-23268 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.095200201,"lon":-81.89823719,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Chester | |
Operator Name: J D DRILLING COMPANY | |
Well Pad ID: | |
Farm/Lease Name: CONROY GEORGE & CLARA (SWIW #18) | |
License Status: Active Injection | |
License Date: 1984-10-02 | |
Spud Date: 1984-12-30 | |
Spud Drilling Contractor: C&D DRLG | |
Final Drill Date: 1985-01-05 | |
Well Total Depth: 3812 ft | |
Configuration: Vertical | |
Latitude: 39.095200201 | |
Longitude: -81.89823719 |
For data sources see[1]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 1900 | 0 | |
2016-01-05 | 3010 | 3715 | 20 |
For data sources see[1]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
000PL10687 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0077184243 | 2013-02-20 | Salt Water Injection Well | No Violations | Witnessed initial injection. Initial injection pressure of 580 psi. Injection pressure dropped from 580 psi to vacuum with-in 10 minutes and stayed on vacuum. The annulus valve was frozen solid and unable to be opened. I collected a water sample and transported it to the lab in Cambridge. |
0084747148 | 2014-10-14 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at the well and containment dike. No additional work has been done to the new containment dike area. |
0105465772 | 2018-06-06 | Salt Water Injection Well | No Violations | Compliance Notice # 1527008408 follow up inspection. One 210 barrel steel tank and one 100 barrel steel tank have been removed from the concrete containment dike. An High Range Quantab was used to test the water in the gravel sump outside of the south side of the concrete containment. Results were 7 on the strip which = 2488 ppm CL Meet with Nate Lane ODNR/ DOGRM ER on location to review remediation efforts. Measured the containment dike dimensions with Butch Barton. |
0139997848 | 2018-03-14 | Salt Water Injection Well | No Violations | My inspection revealed the salt water injection well was on vacuum on the tubing and 42 psi on the annulus. The dike was free of fluids. Legible identification was posted. |
0141775496 | 2017-02-28 | Salt Water Injection Well | No Violations | Our records indicate that the Division has not received the Salt Water Injection Well disposal fees for the 1st, 2nd, 3rd, & 4th quarters of 2016. Please submit the appropriate reports by March 14, 2017. Fees and fee reports received 7/3/2017 |
0161070701 | 2016-07-25 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dikes, tanks, injection pump, injection manifold (Conroy and Showalter ), injection line, injection pressure and annulus pressure. Identification posted on pump house. Containment dikes were free of fluids. |
0177342137 | 2018-05-22 | Salt Water Injection Well | No Violations | Compliance Notice # 1527008408 follow up inspection. JD drilling Brine truck is on site pumping out the concrete dike and removing water from the gravel area outside of the dike. I talked to Spence Carpenter and Butch Barton on site. They want to connect the tanks in the earthen dike to a pump and inject the fluid in the tanks, I told them to send a plan to the UIC section outlining their plan for operation of the facility. I reminded them that the compliance notice for contamination outside of a surface facility has a time line of 10 days. No contaminated soil has been removed from the site. Recent rain event is flushing fluid to the plastic lined pit. |
0188438875 | 2018-10-31 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dikes are free of fluids. Dike A tanks are being plumbed and the tanks are being painted. Witnessed a brine truck unloading on the pad. Reviewed brine hauling logs. |
0188638524 | 2016-01-06 | Salt Water Injection Well | No Violations | No noted violations. There appears to have been a significant release of fluids into the dike recently. There was no fluid in the dike at the time of inspection. |
0199538464 | 2018-10-15 | Surface Facility Construction | No Violations | The new dike liner in dike A is installed. The 400 barrel steel tank is being cleaned out. Reviewed surface facility construction plans with Jim Diddle on location. |
0226107741 | 2013-04-12 | Salt Water Injection Well | No Violations | Inspected the containment dike, tanks, pump, unloading pad, injection pressure and annulus pressure. Identification on wellhead and dike. Dike was free of water. 4 brine line between the tanks and the injection pump was disconnected. All valves were shut. |
0240974105 | 2013-10-30 | Salt Water Injection Well | No Violations | No leaks or signs of contamination at well, tanks, or unloading pad. |
0243547150 | 2012-10-16 | Salt Water Injection Well | No Violations | Observed the conversion of this Ohio Shale production well to an injection well. Met Jon Scott at the well site. Appalachian Well Surveys was at the site waiting on JD Drilling personnel. JD Drilling service truck, flatbed truck with new 100 joints of 2-3/8 inch production tubing with a measured total length of 3030 feet,, and a UIC brine truck filled with fresh water were also parked around the wellhead. Appalachian logged the well with gamma ray-collar locator logs. Rigged up a 60-feet perforator string, one shot per foot and shot perfs at 3668 to 3728 interval to enhance injection capacity of brine combined with existing perforations in the upper Ohio Shale. JD used a refurbished Halliburton R4 Packer with three shear pins in place, each rated at 6600 lbs of shear before failure for a total of 19800 lbs. They lowered the packer into the hole to a depth of 2978.2 feet with 98 joints of the 100 on location. They tried to flush the perfs with some of their water but lost all of their supply due to vacuum down the hole. So they had to get a new supply of fresh water and Baker Hughes inhibitor to perform the mechanical annular space integrity test.. Using the tubing JR Drilling seated the packer at 2978.2 feet with 25,000 lbs total pull on drill pipe and packer with 12,500 lbs on packer. They poured their fresh water with inhibitor down the hole but not slowly. The well continued to burp air and water forcefully so they decided to let it settle over night. Shut down until tomorrow |
0284237767 | 2017-05-15 | Salt Water Injection Well | Violations Noted | Our records indicate that the Division has not received the Salt Water Injection Well Annual Report (Form 204) that was due on April 15th for 2016, despite a letter that was sent April 28, 2017 with a deadline of May 12, 2017 to submit the reports requested. please submit the requested Forms to the Division by 5/26/2017.REPORTS RECEIVED 7/3/2017 |
0323825430 | 2016-03-16 | Salt Water Injection Well | Violations Noted | Our records indicate that the Division has not received the Salt Water Injection Well Annual Report (Form 204) that was due on February 15th for 2015, despite a letter that was sent March 1, 2016 with a deadline of March 15, 2016 to submit the reports requested. Form 204 received 7/13/2017 |
0326601536 | 2018-09-18 | Salt Water Injection Well | No Violations | Inspected the containment dikes, tanks, injection pump, injection pressure and annulus pressure. JD Drilling crew is in the process of removing equipment from dike A. They are waiting on a crane to remove the tanks from dike A. |
0341940266 | 2015-10-09 | Salt Water Injection Well | No Violations | No noted vioaltions. |
0389454341 | 2015-05-27 | Salt Water Injection Well | No Violations | Review of site facilities and well head conditions. No noted violations. |
0397870735 | 2013-07-10 | Salt Water Injection Well | No Violations | Unloading pad and dike around tanks were in good condition. |
0443323385 | 2014-05-21 | Salt Water Injection Well | No Violations | Follow up to -560805446. Witnessed A fresh water MIT mini test was administered and the annulus held 400 psi for 15 minutes with zero drop in pressure. |
0459912636 | 2012-12-04 | Surface Facility Construction | No Violations | Access road is gravel with a gravel parking lot. Unloading pad has been constructed. Concrete dike is completed. Currently installing electric poles for the service line. |
0507726400 | 2017-08-30 | Salt Water Injection Well | No Violations | My inspection today revealed the salt water injection well had 290 psi on the annulus and the injection tubing was on vacuum. The dike was free of fluids, no violations noted. |
0559357375 | 2016-10-14 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection pressure, and annulus pressure. Identification posted. Containment dikes are free of fluid. Injection pressure is on vacuum. |
0560805446 | 2014-05-20 | Salt Water Injection Well | Violations Noted | The annulus had zero pressure on it at the time of inspection, but the injection was on vacuum. Well shall be shut in and a mini MIT shall be administered in order to prove mechanical integrity before injection is allowed to proceed. |
0580345375 | 2014-12-04 | Surface Facility Construction | No Violations | Currently waiting on the 30 mil containment dike liner for the 2nd containment dike. Sand is on site. |
0648904379 | 2018-10-12 | Surface Facility Construction | No Violations | Installing the spray in dike liner in dike A. |
0670097591 | 2018-09-14 | Surface Facility Construction | No Violations | JD Drilling crew has removed one 210 barrel steel tank from dike A and has relocated two 100 barrel steel tanks to an earthen containment dike North West of dike B at GPS +/- 11 feet N39.09558 / W081.89832. |
0680952402 | 2017-02-23 | Salt Water Injection Well | No Violations | Inspected the containment dikes, tanks, injection pump, injection pressure and annulus pressure. Identification posted. The containment dikes are free of fluids. |
0806164535 | 2015-03-19 | Salt Water Injection Well | No Violations | No noted violations at the time of inspection. |
0816382428 | 2013-05-29 | Salt Water Injection Well | No Violations | Good identification. No issues with dike, tanks, or loading pad. |
0834582962 | 2019-03-21 | Surface Facility Construction | No Violations | Installation of a new injection line manifold connecting the Conroy containment dikes A & B to the Conroy and Showalter salt water injection wells. The manifold has valves to direct the brine to either injection well(s) or allow the containment dikes to be segregated. The primary connections to the manifold are for dike A to connect to the Showalter well and dike B to connect to the Conroy well. The manifold was tested to the Conroy injection tubing master valve, the Showalter injection line valve on the facility side of the line, The injection line from dike A and the injection line from dike B. Tested at 880 psi at 5 minutes 855 at 15 minutes 830 psi. 1st test failed. A 2nd test at 825 psi, at 5 minutes 820 psi, at 15 minutes 815 psi. Test passed. JD Drilling Supervisor was informed that the test pressure of 825psi instead of 880 psi will result in the lowering of the max injection pressure for the Conroy well. |
0952353910 | 2014-09-10 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Good identification posted at well and containment dike. Met with Jim Diddle and Spence Carpenter on site to review plans for a second unloading pad. |
1046595633 | 2019-04-29 | Salt Water Injection Well | Violations Noted | Our records indicate that the Division has not received the Salt Water Injection Well Annual Report (Form 204) that was due on April 15th for 2018, Please submit the Form 204 to the Division by 5/29/2019. |
1048406739 | 2013-05-22 | Salt Water Injection Well | No Violations | Inspected the injection pressure, annulus pressure, unloading pad, containment dike and tanks. Dike is free of oil and water. Establishing vegetative cover on bare areas. Seed and straw have been applied to location. Access road has gate that is lockable. |
1126847620 | 2015-04-07 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection manifold connecting the Conroy and Showalter injection wells to this facility. The manifold was tested today at 1020 psi for 15 minutes with no loss in pressure, Identification posted at the well. Containment dikes are free of water. |
1186298023 | 2018-11-14 | Surface Facility Construction | No Violations | Surface facility inspection with UIC Supervisor and UIC Geologist. |
1200455161 | 2012-06-25 | Salt Water Injection Well | No Violations | Well does not appear to be in use for injection. No equipment or lines on site. All valves closed at wellhead. Unable to test pressures at well. |
1208076800 | 2015-10-06 | Surface Facility Construction | No Violations | Inspected the surface facility with UIC Section Geologist. Measured containment dike and documented tank connections. |
1227901331 | 2015-04-28 | Salt Water Injection Well | No Violations | No noted violations. |
1241762147 | 2015-07-22 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Reviewed brine hauling logs on trucks unloading on the pad. |
1251542102 | 2013-10-09 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, annulus pressure, and injection pressure. Containment dike is free of water. Good identification at the wellhead and containment dike. |
1257851502 | 2014-10-06 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Identification posted at well and containment dike. Currently working on the second containment dike. |
1286474651 | 2010-10-06 | Salt Water Injection Well | No Violations | Convert to SWIW inspection request from Tom Tomastik. Well site is located in a corn field. Corn crop is on 3 sides with the 4th side a wood line with pine trees and mixed hard woods. There are three water wells with in 1/2 mile (2640). (1) Windon is 1240 South West of proposed Injection well. (2) Millhone is 1189 East of the proposed Injection Well. (3) Nutzling is 1550 East of the proposed Injection well. There are two intermittent streams (1) 1832 to West of proposed Injection well. (2) 2302 to East of the proposed Injection well. Production well has good identification. Well is equipped with 7 casing head, 4 1/2 casing head, with 1 1/2 tubing (valve on tubing is closed). Well has a 2 black plastic line that is connected to a 1100 gallon plastic tank (tank is empty). Well is not connected for gas production. No leaks or contamination observed during inspection. Well site has good vegetative cover established. |
1316561633 | 2012-10-17 | Salt Water Injection Well | No Violations | Topped off annulus with 2 barrels fresh water. Pumped annular pressure to 800 psi then pressure dropped rapidly. Pulled more tension on tubing and packer total of 26,000 lbs. Tested three aditional times using 15 gallons of fresh water. Unable to hold 880 psi for 15 minutes with no more than 5% loss. Pulled more tension on the packer 27,000 lbs. Tested at 910 psi for 15 minutes with no decline in pressure. Test passed. |
1327154324 | 2015-09-10 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. |
1350416109 | 2012-10-16 | Salt Water Injection Well | No Violations | Conversion to salt water injection well. Appalachian Well Surveys logged (Gamma Ray CCL) and perforated the 4.5 casing from 3728 to 3668 (60 shots). Wire line total depth was 3764. Halliburton R-4 (rebuilt) Packer set at 2978 with new 2 3/8 R-2 10 round tubing. Packer ran with 3 shear pins. Packer set at 25,000 lbs (tubing string weight 12,500 lbs). Packer was set at 25,000lbs. Annulus was filled with 30 barrels fresh water and 4 gallons inhibitor. Unable to test annulus due to air in the annulus. |
1350555475 | 2012-10-17 | Salt Water Injection Well | No Violations | Well settled down over night. Water was added on top of the packer too quickly entrapping air. This caused the well to burp air and water. The operator decided to wait until the next day to continue the mechanical integrity test on the packer. Performed three failed mechanical integrity test at the beginning of the morning, reseating the packer after each test with increasingly higher pull pressure on the drill string and packer. The fourth reseating of the packer had a total pull weight on the drill string and packer of 27000 lbs, with approximately 14000 pounds of that applied to the packer. The maximum allowable injection pressure on this well was permitted at 880 psi. This last mechanical integrity test started at 910 psi and stayed at that pressure for 15 minutes. It passed. |
1356633494 | 2012-12-27 | Salt Water Injection Well | No Violations | Surface facility construction ongoing. Well is not connected to injection line. Checked injection tubing pressure (formation pressure) and annulus pressure. |
1358443513 | 2013-01-17 | Surface Facility Construction | No Violations | The concrete pads have been poured and the tanks are set. The lines are being laid down today. The injection line to the well has not been set. |
1361378405 | 2013-02-20 | Salt Water Injection Well | No Violations | Injection operations began today and I accompanied Jon Scott on an inspection of the facilities. |
1361480275 | 2013-02-21 | Salt Water Injection Well | No Violations | Inspected the unloading pad, Containment dike. Checked the injection pressure and the annulus pressure. |
1372584698 | 2012-11-15 | Surface Facility Construction | No Violations | Dike formed area 34 by 55. Pouring concrete walls and slab. Used 6 bag mix concrete with wire reinforcement. 60 yards ordered. 8 thick slab. |
1404582517 | 2018-06-18 | Surface Facility Construction | No Violations | The tanks with-in the the concrete containment dike have been disconnected from the injection operations. The Earthen dike with six 400 barrel tanks ( four of the 400 barrel tanks are connected at the bottom) Is connected to an injection pump and injection line manifold that connectes to the Conroy and Showalter injection wells. |
1411060821 | 2014-09-18 | Surface Facility Construction | No Violations | Second unloading pad is being constructed today. Pad will be 60 by 14 concrete with wire reinforcement. |
1416417232 | 2014-11-19 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. The construction of the second containment dike has not progressed past the excavation of soil and the build up of the dike walls. |
1416866876 | 2014-11-24 | Surface Facility Construction | No Violations | Witnessed company constructing dike for tank placement. |
1419350873 | 2014-12-23 | Surface Facility Construction | No Violations | Constructing second containment dike. 30 mil liner has been installed with a layer of sand below the liner and a layer of sand on top of the liner. Geo fabric has been installed over the top layer of sand. Currently installing two 400 barrel steel tanks in the containment dike. |
1430761544 | 2015-05-04 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted at well. |
1456775179 | 2016-02-29 | Salt Water Injection Well | No Violations | Inspected the containment dikes, tanks, unload pads, injection pump, injection line, injection pressure and annulus pressure. The cement containment dike had 2of oil and water in one half of the dike. I called Jonathan Reese and informed him of the water in the containment dike. Butch Barton came to the surface facility and turned on the sump pump. The pump had been shut off due to the lines freezing. |
1467681564 | 2014-11-19 | Salt Water Injection Well | No Violations | No violations at facility. Company has begun construction on dike associated with new tank battery. |
1513705399 | 2004-06-02 | Production Wells | No Violations | No violations at the time of inspection. |
1518112873 | 2018-09-26 | Salt Water Injection Well | No Violations | Inspected the containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Witnessed brine trucks unloading on the pads. Reviewed brine hauling logs. The containment dikes are free of fluid. Identification is posted. |
1527008408 | 2018-05-21 | Salt Water Injection Well | Violations Noted | Follow up inspection to determine extent of out of containment contamination as a result of the facility fire on 5-20-2018. The containment dike over flowed at a low point at the south east corner of the concrete containment dike. Brine and oil over flowed the edge of containment and into a gravel and sand layer that surrounds the outside of the containment. This gravel and sand layer has a 4 inch PVC drain pipe that flows north east of the containment. Brine was observed flowing from the 4inch drain pipe to the wood line approximately 22 feet in length by a varying width from 2 feet to 7 feet. Three High Range Quantabs were used to test the flow from the 4 inch pipe. All three Quantabs maxed out at over 6620 ppm Cl. A soil sample collected in the area between the concrete dike and the earthen dike at 12 inches deep tested 2277 ppm Cl. A sample of the water standing outside the concrete dike east side maxed out at over 6620 ppm Cl. ODNR DOGRM ER Lane was called to inform him of the testing results. Jim Diddle, Spence Carpenter and Butch Barton were on site. They were instructed to remove contaminated material and fluids from the location. All fluids to be sent to an approved UIC facility and the contaminated material is to be hauled to an EPA approved landfill. A small plastic lined pit was constructed below the 4 inch PVC pipe outlet. A sump pump was placed into the pit and the water is being pumped back into concrete containment. |
1527602037 | 2018-05-23 | Salt Water Injection Well | No Violations | Compliance Notice # 1527008408 follow up inspection. JD Drilling crew has excavated sand and gravel from the area between the concrete containment dike and the earthen containment dike. A field test of the soil between the containment dikes revealed 2488 ppm Cl. The discharge from the 4 inch PVC pipe is being collected in a plastic lined sump. The discharge water was tested with High Range Quantabs that revealed 776 ppm Cl. The gravel area outside of the concrete containment dike (south side) has been excavated and the water in the gravel and clay was tested with High Range Quantabs that revealed 3299 ppm Cl. ( this was after a rain event.) A JD Drilling Vac truck is on site to collect the water outside of the containment. |
1528119731 | 2018-05-29 | Salt Water Injection Well | No Violations | Compliance Notice # 1527008408 follow up inspection. Meet with ODNR DOGRM ER Lane on site. Reviewed the clean up efforts to date. There are two roll off boxes on the upper unloading pad. High Range Quantabs were used to field test the water in the sump out side of the south end of the containment dike. The Quantab was maxed out at over 6298 ppm Cl. The 4 inch PVC pipe had zero flow during the inspection. |
1529002297 | 2018-06-14 | Salt Water Injection Well | No Violations | My inspection revealed the well was not in operation. I met with Mr. Jim Diddle with JD OIL and informed him he could not use dike A due to the fact it is not in compliance with the existing tanks. He could use dike B but not until the remainder of the pollution was removed. I was accompanied but Mr. Nate Lane with ODNR emergency response. The last part of the clean up was a excavation that was approximately 20 feet long by 3 feet wide by 2 feet deep. The contaminated soil was removed. This satisfies the compliance notice. |
1529348292 | 2018-06-18 | Salt Water Injection Well | No Violations | Compliance Notice # 1527008408 follow up inspection. The contamination outside of the concrete containment dike has been remediated. The two roll off boxes have been moved from the location to the C+L yard waiting on soil profile testing for disposal. |
1531415739 | 2018-07-09 | Salt Water Injection Well | No Violations | Inspected the containment dikes, tanks, injection line, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dikes are free of fluids. The 400 barrel tanks in the lined earthen dike are connected to the injection pump. The access road gate was locked during the inspection. |
1539281026 | 2018-10-09 | Surface Facility Construction | No Violations | Installing metal supports and metal side wall extensions on dike A. Cleaning out concrete dike. |
1540298787 | 2018-10-18 | Surface Facility Construction | No Violations | JD Drilling tested the gravity flow unload pad drain lines by installing a plug down slope at the containment dike and filling the drain lines with fresh water until the lines were full. The drain were monitored for 1 hour with no signs of loss. The unload lines from the unload pads to the knock out tank in dike B were tested with fresh water pumped from the vacuum truck to the tank, with no signs of leakage. |
1540637698 | 2015-01-07 | Surface Facility Construction | No Violations | Installing plumbing on the 2 new 400 barrel steel tanks in the new containment dike. |
1541348214 | 2017-04-11 | Salt Water Injection Well | No Violations | Inspected the containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids. |
1542702587 | 2015-10-23 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dikes, tanks, injection pump, injection line, Injection pressure and annulus pressure. Dikes are free of fluids. Identification posted at facility and well. |
1549641181 | 2019-01-24 | Surface Facility Construction | No Violations | Witnessed the changing of the tank connections in dike B. There are 6- 400 barrel tanks in the containment. Two sets of 3 tanks are connected at the bottom. Each set of 3 tanks has a small pump that pumps water into a filter housing and then into the injection line manifold that is connected to the Conroy dike A tanks and the Conroy and Showalter injection lines. |
1553610773 | 2019-03-20 | Surface Facility Construction | No Violations | Installation of a new injection line manifold connecting the Conroy containment dikes A & B to the Conroy and Showalter salt water injection wells. The manifold has valves to direct the brine to either injection well(s) or allow the containment dikes to be segregated. The primary connections to the manifold are for dike A to connect to the Showalter well and dike B to connect to the Conroy well. The manifold was tested to the Conroy injection tubing master valve, the Showalter injection line valve on the facility side of the line, The injection line from dike A and the injection line from dike B. The line from dike B had air pockets that failed multiple tests. The valve on the manifold connecting dike B was closed and the manifold tested at 880 psi for 15 minutes with no loss in pressure. The 3 inch line connecting dike B and the manifold did not pass. JD crew is going to allow the air to work out of the 3 inch line over night. A test is scheduled for 3-21-19. |
1580209380 | 2018-05-25 | Salt Water Injection Well | No Violations | Compliance Notice # 1527008408 follow up inspection. Roll off box 200216 is on the upper unloading pad. JD crew is excavating contaminated soil and putting it into the roll off box. The soil down slope from the 4 inch PVC pipe has was tested in the field at 8 inches with Cl levels at 776 - 845 ppm cl. An additional 4-6 inches of material was removed and the soil was tested in the field in two locations 1st 1.8 on high range Quantab, 2nd 1.4 on high range Quantab. The gravel sump on outside of containment (south side) maxed out the high range Quantab. (more than 6298 ppm Cl. |
1620279381 | 2016-05-25 | Salt Water Injection Well | No Violations | Inspected the containment dikes, tanks, unloading pads, injection pump, injection line, injection pressure and annulus pressure. Identification posted on the facility. Containment dikes are free of fluids. |
1704017479 | 2018-02-16 | Salt Water Injection Well | Violations Noted | Our records indicate that the Division has not received the Salt Water Injection Well disposal fees for the 1st, 2nd, 3rd, & 4th quarter of 2017 . Please submit the appropriate reports by March 17, 2018. Reports received 5/11/2018 |
1720988588 | 2019-05-02 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dikes, tanks, injection pumps, injection pressure and annulus pressure. Identification is posted. The containment dikes are free of fluids. |
1767322725 | 2019-01-03 | Salt Water Injection Well | No Violations | Inspected the containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dikes are free of fluids. |
1769069770 | 2014-11-24 | Surface Facility Construction | No Violations | I stopped back at the site to see if the company had begun layering the sand or laying the liner in the pit yet. They were still doing dirt work at the site. |
1779912114 | 2019-03-06 | Surface Facility Construction | No Violations | Meet with Butch Barton on site. They are replacing the existing injection line manifold from the two containment dikes to the Conroy and Showalter injection wells. |
1791242897 | 2012-12-19 | Surface Facility Construction | No Violations | Installed three 210 barrel tanks, two 100 barrel tanks and one 400 barrel tank in dike. |
1819321786 | 2018-06-07 | Surface Facility Construction | No Violations | Test the injection line manifold from the filter housing outlet to the Conroy Master valve and to the Showalter injection line valve. Test at 885 psi, at 5 minutes 880 psi, at 15 minutes 880 psi. Test passed. Butch Barton demonstrated with a vacuum truck full of fresh water the unload line integrity from the lower pad to the tanks and then switched to the upper unload pad line and a leak was observed at the 4 inch strainer threaded connection. The connection was repaired. Both unload pad drains were plugged off at the containment dike and filled with fresh water for 40 minutes with no loss in fluid. The unload pad line plug was removed and the fluid level at the unload pads dropped. |
1828072346 | 2018-11-29 | Salt Water Injection Well | No Violations | Inspected the unloading pads, containment dikes (A&B), tanks, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dikes (A&B) are free of fluid. |
1830109954 | 2012-11-09 | Salt Water Injection Well | No Violations | Checked injection tubing pressure and annulus pressure. Injection tubing not connected to equipment. Tubing pressure is formation pressure. Crew on site digging dike foundation. |
1866521774 | 2018-10-10 | Surface Facility Construction | No Violations | Installing dike liner material and started to spray in dike liner. Rain event stopped the installation. |
1966946755 | 2014-08-26 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Good identification posted on well and tank. Concrete containment dike has multiple cracks that need repaired. I called Jonathan Reese and left a message about the need to repair the cracks. |
2010247437 | 2014-02-25 | Salt Water Injection Well | No Violations | Upon inspection it was noticed the injection tubing was on vacuum and annulus had zero psi. I met tom Schoonover in the field and we noticed the production casing head had developed a small leak around the threads. A fresh water MIT mini test was administered and the annulus held 405 psi for 15 minutes with zero drop in pressure. |
2011375635 | 2016-12-20 | Salt Water Injection Well | No Violations | inspected the containment dikes, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The concrete containment dike had 12 inches of water in it. The sump pump line to the tank had frozen and separated, causing the pump to circulate the water in the dike. I contacted Jonathan Reese and he sent Butch Barton to the facility. Butch repaired the separated sump pump line and is pumping the water into the tank. All fluids were contained with in the dike. |
2025441506 | 2009-05-01 | Production Wells | No Violations | No violations were found. |
2043116525 | 2018-05-29 | Salt Water Injection Well | No Violations | Compliance Notice # 1527008408 follow up inspection. Roll off box #s 200216 and 220280 are on the upper unloading pad. Meet with ODNR/ DOGRM ER Lane on site to review clean up efforts. Tested gravel sump outside of containment (south side) with High Range Quantab. It maxed out the Quantab (more than 6298 ppm Cl. There was no flow from the 4 inch PVC pipe). |
2043971253 | 2018-05-09 | Salt Water Injection Well | No Violations | Inspected the containment dikes, tanks, unloading pads, injection pump, injection line, injection pressure. Identification is posted. The containment dikes are free of fluids. Witnessed brine trucks unloading on the pad. Reviewed brine hauling logs. |
2057873217 | 2019-01-03 | Surface Facility Construction | No Violations | Test injection lines at the surface facility. Test the new 3 inch Flex Pipe Systems line from dike B filter housing outlet valve to the injection line manifold, Test the injection line manifold after new ball valves have been installed, test the injection line to the Conroy injection tubing master valve, test the injection line to the Showalter injection tubing master valve. Injection line test at 905 psi, at 5 minutes 895 psi, at 15 minutes 880 psi. |
2060390121 | 2018-05-31 | Salt Water Injection Well | No Violations | Compliance Notice # 1527008408 follow up inspection. Field tested the sump on the outside south end of the containment dike with high range Quantab 8.6 on the strip = 5782 ppm Tested the water at the 4 inch PVC drain pipe with high range Quantab 5.6 on the strip = 1379 ppm Cl. Checked the injection pressure and annulus pressure. Tested the injection line manifold to the Conroy and Showalter injection wells at 290 psi. At 5 minutes 290 psi. at 15 minutes 290 psi. I talked to Butch Barton on site about the test pressure and that this will be the new max injection pressure for the Conroy and Showalter injection wells. |
2130782284 | 2017-07-24 | Salt Water Injection Well | No Violations | I inspected the two new 400 barrel tanks that were installed inside the dike. The tanks are not connected to the existing tank battery. These tanks will be used for additional storage. Pictures were taken of the tanks showing no connections. During my inspection, I checked the injection well. The annulus had 217 PSI while the tubing was on vacuum. |
2131910760 | 2018-05-04 | Salt Water Injection Well | Violations Noted | Our records indicate that the Division has not received the 2017 Salt Water Injection Well Annual Report (Form 204) that was due to the Division by April 15, 2018. Please submit the requested report by June 4, 2018. Form 204 received 6/21/2018 |
2144823656 | 2014-07-24 | Salt Water Injection Well | No Violations | No noted violations. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0284237767 | US-OH-122951 | 2017-07-13 | 9-3-04B | Failure to file salt water injection annual report |
0323825430 | US-OH-123398 | 2017-07-13 | 9-3-04B | Failure to file salt water injection annual report |
0560805446 | US-OH-126188 | 2014-05-21 | Failure to monitor annulus pressure | |
1046595633 | US-OH-100730 | 2019-05-09 | Failure to file salt water injection annual report | |
1527008408 | US-OH-114616 | 2018-08-13 | 9-3-05(A)6 | Contamination at surface facility (permit after 6-1-82) |
1704017479 | US-OH-116893 | 2018-08-03 | NONE | Failure to report disposal fees |
2131910760 | US-OH-121848 | 2018-08-03 | Failure to file salt water injection annual report |
For data sources see[1]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 0 | 0 | |||
Not Treated | 0 | 0 | 0 | FRAC;N2 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1984-10-02 | 116 J D DRILLING CO GeoDate 10/2/84 |
Oil and Gas | 1984-10-02 | Issued Date 10/2/84 Expired Date 3/31/85 Acres 0057500 Tool Type RTA Proposed Formation OHIO SHALE Proposed Depth 03812 Proposed Drill Depth 03812 |
Original Spud | 1984-12-30 | |
Completed | 1985-01-05 | |
Reached Total Depth | 1985-01-05 | |
Completion Report Received | 1985-11-22 | |
APP | 2010-10-19 | Proposed Formations:OHIO SHALE, Issued Date:10/19/2010, Expired Date:10/18/2012 12:00:00 PM, Drilling unit acres:57.5, Proposed Well Type:SWD, Proposed Well Class:SWIW |
Annulus Pressure Monitoring Approved | 2012-10-16 | |
Construction Permit Expires | 2012-10-18 | |
Last Compliance Report | 2012-10-22 | |
Record Last Modified | 2015-09-24 |