X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-115-24684"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-115-24684
 
| Well ID: 34-115-24684
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.60931015, -81.66692321 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.609237359, -81.66707153 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Morgan County, Ohio|Morgan]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name: [[PDC ENERGY INC]]
+
| County: [[Morgan_County,_Ohio|Morgan]]
 
|-
 
|-
| Well Pad ID:  
+
| Municipality: [[Center,_Morgan_County,_Ohio|Center]]
 
|-
 
|-
| Farm/Lease Name:  
+
| Operator Name: [[UTICA RESOURCE OPERATING LLC]]
 
|-
 
|-
| First Permit Date:  
+
| Well Pad ID: [[823]]
 
|-
 
|-
| Last Permit Date:  
+
| Farm/Lease Name: PALMER
 +
|-
 +
| License Status: Producing
 +
|-
 +
| License Date: 2014-11-17
 
|-
 
|-
 
| Spud Date: 2013-11-27
 
| Spud Date: 2013-11-27
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[H&P DRILLING]]
 
|-
 
|-
| Configuration: Vertical
+
| Final Drill Date: 2014-03-29
 
|-
 
|-
| Well Status: Producing
+
| Well Total Depth: 14460 ft
 
|-
 
|-
| Violations: 0
+
| Configuration: Horizontal
 
|-
 
|-
| Latitude: 39.60931015
+
| Latitude: 39.609237359
 
|-
 
|-
| Longitude: -81.66692321
+
| Longitude: -81.66707153
 +
|}
 +
For data sources see<ref name=RBDMS>{{cite web
 +
| title = RBDMS
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" style="width: 50%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
|}
+
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Period
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Oil Quantity (bbl)
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Production Days
!scope="col" | OIL QUANTITY
+
|-
!scope="col" | OIL PRODUCTION DAYS
+
| 2014
 +
| [[PDC ENERGY INC]]
 +
| style="text-align: right;" | 85899
 +
| style="text-align: right;" | 23455
 +
| style="text-align: right;" | 120
 +
|-
 +
| 2015
 +
| [[PDC ENERGY INC]]
 +
| style="text-align: right;" | 195224
 +
| style="text-align: right;" | 25471
 +
| style="text-align: right;" | 361
 +
|-
 +
| 2016
 +
| [[PDC ENERGY INC]]
 +
| style="text-align: right;" | 135892
 +
| style="text-align: right;" | 11277
 +
| style="text-align: right;" | 364
 +
|-
 +
| 2017
 +
| [[PDC ENERGY INC]]
 +
| style="text-align: right;" | 104996
 +
| style="text-align: right;" | 7193
 +
| style="text-align: right;" | 356
 +
|-
 +
| 2018
 +
| [[UTICA RESOURCE OPERATING LLC]]
 +
| style="text-align: right;" | 92899
 +
| style="text-align: right;" | 4180
 +
| style="text-align: right;" | 364
 +
|-
 +
| 2019
 +
| [[UTICA RESOURCE OPERATING LLC]]
 +
| style="text-align: right;" | 22161
 +
| style="text-align: right;" | 1158
 +
| style="text-align: right;" | 90
 +
|-
 +
|}
 +
For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web
 +
| title = Ohio Combined Annual Production Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2014
 +
| [[PDC ENERGY INC]]
 +
| Brine
 +
| style="text-align: right;" | 20131
 +
| style="text-align: right;" | 120
 
|-
 
|-
| 2014-3
+
| 2015
| style="text-align:right;" | 13091.0
+
| [[PDC ENERGY INC]]
| style="text-align:right;" | 28.0
+
| Brine
|  
+
| style="text-align: right;" | 10718
|  
+
| style="text-align: right;" | 361
| style="text-align:right;" | 6612.0
 
| style="text-align:right;" | 28.0
 
 
|-
 
|-
 +
| 2016
 +
| [[PDC ENERGY INC]]
 +
| Brine
 +
| style="text-align: right;" | 5145
 +
| style="text-align: right;" | 364
 
|-
 
|-
| 2014-4
+
| 2017
| style="text-align:right;" | 72808.0
+
| [[PDC ENERGY INC]]
| style="text-align:right;" | 92.0
+
| Brine
|  
+
| style="text-align: right;" | 2778
|  
+
| style="text-align: right;" | 356
| style="text-align:right;" | 16843.0
 
| style="text-align:right;" | 92.0
 
 
|-
 
|-
 +
| 2018
 +
| [[UTICA RESOURCE OPERATING LLC]]
 +
| Brine
 +
| style="text-align: right;" | 1377
 +
| style="text-align: right;" | 273
 
|-
 
|-
| 2015-1
+
| 2019
| style="text-align:right;" | 63045.0
+
| [[UTICA RESOURCE OPERATING LLC]]
| style="text-align:right;" | 88.0
+
| Brine
|  
+
| style="text-align: right;" | 360
|  
+
| style="text-align: right;" | 90
| style="text-align:right;" | 9553.0
 
| style="text-align:right;" | 88.0
 
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
For data sources see<ref name=RBDMS/><ref name=Annual_Prod/>
| title = Ohio Department of Natural Resources RBDMS
 
| publisher = [http://oilandgas.ohiodnr.gov/]
 
| date = 2015-06-19
 
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
 
| accessdate = 2015-06-20 }}</ref>
 
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION COMMENT
+
| 0406366972
 +
| 2014-03-24
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| PDC is currently drilling the horizotal lateral and mudloggers are on location taking samples. They are currently at 8571 MD.
 +
|-
 +
| 0725912596
 +
| 2014-02-05
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I arrived on location and they were in the process of hooking up the wireline truck in order to run the gyro.
 +
|-
 +
| 0729544026
 +
| 2017-01-23
 +
| Production Wells
 +
| No Violations
 +
| The inspection this day revealed that this well is equipped with a plunger lift system, a 4 1/2 inch diameter wellhead, 2 inch diameter steel production lines, and 1 1/2 inch diameter production tubing. The valves on the wellhead are open at the time of inspection. The tank battery consist of six (6) 500 barrel steel tanks in a containment dike. Identification for the wells and tanks are posted and in proper order. The well tender for PDC was on site at the time of inspection. He informed me that PDC has a thermal picture taken every 3 months of the pad to look for any leaks and there have not been any of recent. There are no issues at the time of inspection and this well is in production at the time of inspection.
 +
|-
 +
| 0762080886
 +
| 2014-07-31
 +
| Completion Testing
 +
| No Violations
 +
| Witnessed partial frac with inspector Jake Glascock. The company was beginning the 12th stage of their lateral frac. Formation breakdown pressure was 7200 psi.
 +
|-
 +
| 0853103158
 +
| 2014-01-25
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Witnessed the cementing of the surface casing.  Good circulation and good returns were observed.  341 ft of 20 in casing was ran in 368 ft of 24 in hole.  About 20 plus barrels of returns were observed at the surface.  Spoke with drilling consultant on site.
 +
|-
 +
| 1299115932
 +
| 2018-04-09
 +
| Preliminary Restoration
 +
| No Violations
 +
| I was on location today to do a preliminary restoration on this well. The well has been reporting production since 2014. All of the drilling equipment has been removed and the drilling pits have been filled in. The well is in-compliance at this time.
 
|-
 
|-
 
| 1390497553
 
| 1390497553
 
| 2014-01-23
 
| 2014-01-23
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| I arrived on location for a site inspection. Express Energy was grouting the mousehole, and Dave Gray stated they will let it sit for 12 hours before they resume drilling the surface casing hole. There are no issues to report at this time.
 
| I arrived on location for a site inspection. Express Energy was grouting the mousehole, and Dave Gray stated they will let it sit for 12 hours before they resume drilling the surface casing hole. There are no issues to report at this time.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1390843244
 
| 1390843244
 
| 2014-01-27
 
| 2014-01-27
|  
+
| Drill / Deepen /  Reopen
| I met PDC's EH&S specialist Tony Long, out on location today. The liner was cut in the corner of the location exposing one of the pad drainage vaults. They are going to move the vehicles on top of the spot and check the vault and repair the liner this week. Tony will call me when they are ready to perform job.
+
| No Violations
|
+
| I met PDCs EH&S specialist Tony Long, out on location today. The liner was cut in the corner of the location exposing one of the pad drainage vaults. They are going to move the vehicles on top of the spot and check the vault and repair the liner this week. Tony will call me when they are ready to perform job.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1391105560
 
| 1391105560
 
| 2014-01-30
 
| 2014-01-30
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| I was on location to witness the testing of the BOP.
 
| I was on location to witness the testing of the BOP.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1406823971
 
| 1406823971
 
| 2014-07-31
 
| 2014-07-31
|  
+
| Drill / Deepen /  Reopen
| PDC is currently on Stage 14 of their completion operation. The average treating pressure has been around 7500-8000 psi at 80 bbls/min. Breakdown pressure for this stage was witnessed at 7310'.
+
| No Violations
|
+
| PDC is currently on Stage 14 of their completion operation. The average treating pressure has been around 7500-8000 psi at 80 bbls/min. Breakdown pressure for this stage was witnessed at 7310.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1410191474
 
| 1410191474
 
| 2014-09-08
 
| 2014-09-08
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| PDC has removed all of the completion equipment off location and the wells are currently producing flowback water. The dike has been constructed and consists of six 500bbl tanks. Energy Services Corporation was installing equipment at the wellhead in order to monitor the surface casing pressures, and H & L Services was unloading flowback from one of the tanks.
 
| PDC has removed all of the completion equipment off location and the wells are currently producing flowback water. The dike has been constructed and consists of six 500bbl tanks. Energy Services Corporation was installing equipment at the wellhead in order to monitor the surface casing pressures, and H & L Services was unloading flowback from one of the tanks.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1644855699
 +
| 2018-04-04
 +
| Production Wells
 +
| No Violations
 +
| I am accompanied by Supervisor Dan Goins. We inspected the site for annular pressure monitoring equipment. The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings.
 
|-
 
|-
| -1787874090
+
| 1787874090
 
| 2014-01-29
 
| 2014-01-29
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| I was on location to witness Universal Cement Company set the 13 3/8 casing with 1417 sacks of cement. Operator used 9 centralizers. They had good circulation and had 45 bbls of cement returns. They locked in at 700psi for 5 minutes with no issues.
 
| I was on location to witness Universal Cement Company set the 13 3/8 casing with 1417 sacks of cement. Operator used 9 centralizers. They had good circulation and had 45 bbls of cement returns. They locked in at 700psi for 5 minutes with no issues.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1940476735
 +
| 2019-02-19
 +
| Production Wells
 +
| No Violations
 +
| I was on location today to do a field inspection on this well.  The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings. The well did not have any identification on it and is required to because there is multiple wells producing into the same production tanks. The pumper was on location during my inspection so let him know that the well needed legible identification on it.
 
|-
 
|-
| 406366972
+
|}
| 2014-03-24
+
<!--==== Violations Commited ====
|  
+
{| class="wikitable sortable" width="95%"
| PDC is currently drilling the horizotal lateral and mudloggers are on location taking samples. They are currently at 8571' MD.
+
!scope="col" style="text-align: center"| Inspection ID
|  
+
!scope="col" style="text-align: center"| Violation ID
|  
+
!scope="col" style="text-align: center"| Violation Date
|  
+
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref name=RBDMS/>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
| 2020-08-08
 +
| H2O
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 7757 Bbl
 +
| style="text-align: right;" | 70800
 +
| [[CalFrac]]
 +
| STAGES 36/36
 +
30 SHOTS
 +
|-
 +
| 2020-07-16
 +
| H2O
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 9013 Bbl
 +
| style="text-align: right;" | 387050
 +
| [[CalFrac]]
 +
| STAGE 1/36
 +
30 SHOTS
 +
STAGES 2-35 SEE IMAGES
 +
|-
 +
|}
 +
For data sources see<ref name = RBDMS/>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2013-11-15
 +
| Proposed Formations:POINT PLEASANT, Issued Date:11/15/2013, Expired Date:11/15/2015 12:00:00 PM, Drilling unit acres:627, Proposed Well Type:OG, Proposed Well Class:EDPW
 +
|-
 +
| Correction to Well
 +
| 2013-12-06
 +
| CORRECTION TO SURFACE FOOTAGE.
 
|-
 
|-
 +
| Reached Total Depth
 +
| 2014-03-29
 +
| FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING  (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.
 
|-
 
|-
| 725912596
+
| Completion Report Received
| 2014-02-05
+
| 2014-12-10
|  
+
| FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING  (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.
| I arrived on location and they were in the process of hooking up the wireline truck in order to run the gyro.
 
|
 
|
 
|
 
 
|-
 
|-
 +
| Correction to Well
 +
| 2015-02-20
 +
| CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.  UNIT SIZE DECREASED.
 
|-
 
|-
| 762080886
+
| Construction Permit Expires
| 2014-07-31
+
| 2015-11-15
|  
+
| FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING  (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.
| Witnessed partial frac with inspector Jake Glascock. The company was beginning the 12th stage of their lateral frac. Formation breakdown pressure was 7200 psi.
 
|
 
|
 
|
 
 
|-
 
|-
 +
| Change of Owner
 +
| 2018-05-04
 +
| Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC
 
|-
 
|-
| -853103158
+
| Record Last Modified
| 2014-01-25
+
| 2019-01-22
|  
+
| FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.
| Witnessed the cementing of the surface casing. Good circulation and good returns were observed. 341 ft of 20 in casing was ran in 368 ft of 24 in hole.  About 20 plus barrels of returns were observed at the surface.  Spoke with drilling consultant on site.
 
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
For data sources see<ref name=RBDMS/>
| title = Ohio Department of Natural Resources RBDMS
+
==References==
| publisher = [http://oilandgas.ohiodnr.gov/]
+
<references/>
| date = 2015-06-19
 
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 
| accessdate = 2015-06-20 }}</ref>
 
== References ==
 
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 02:45, 21 July 2019

Well Details

Well ID: 34-115-24684
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Center
Operator Name: UTICA RESOURCE OPERATING LLC
Well Pad ID: 823
Farm/Lease Name: PALMER
License Status: Producing
License Date: 2014-11-17
Spud Date: 2013-11-27
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2014-03-29
Well Total Depth: 14460 ft
Configuration: Horizontal
Latitude: 39.609237359
Longitude: -81.66707153

For data sources see[1]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 PDC ENERGY INC 85899 23455 120
2015 PDC ENERGY INC 195224 25471 361
2016 PDC ENERGY INC 135892 11277 364
2017 PDC ENERGY INC 104996 7193 356
2018 UTICA RESOURCE OPERATING LLC 92899 4180 364
2019 UTICA RESOURCE OPERATING LLC 22161 1158 90

For data sources see[1][2]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 PDC ENERGY INC Brine 20131 120
2015 PDC ENERGY INC Brine 10718 361
2016 PDC ENERGY INC Brine 5145 364
2017 PDC ENERGY INC Brine 2778 356
2018 UTICA RESOURCE OPERATING LLC Brine 1377 273
2019 UTICA RESOURCE OPERATING LLC Brine 360 90

For data sources see[1][2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0406366972 2014-03-24 Drill / Deepen / Reopen No Violations PDC is currently drilling the horizotal lateral and mudloggers are on location taking samples. They are currently at 8571 MD.
0725912596 2014-02-05 Drill / Deepen / Reopen No Violations I arrived on location and they were in the process of hooking up the wireline truck in order to run the gyro.
0729544026 2017-01-23 Production Wells No Violations The inspection this day revealed that this well is equipped with a plunger lift system, a 4 1/2 inch diameter wellhead, 2 inch diameter steel production lines, and 1 1/2 inch diameter production tubing. The valves on the wellhead are open at the time of inspection. The tank battery consist of six (6) 500 barrel steel tanks in a containment dike. Identification for the wells and tanks are posted and in proper order. The well tender for PDC was on site at the time of inspection. He informed me that PDC has a thermal picture taken every 3 months of the pad to look for any leaks and there have not been any of recent. There are no issues at the time of inspection and this well is in production at the time of inspection.
0762080886 2014-07-31 Completion Testing No Violations Witnessed partial frac with inspector Jake Glascock. The company was beginning the 12th stage of their lateral frac. Formation breakdown pressure was 7200 psi.
0853103158 2014-01-25 Drill / Deepen / Reopen No Violations Witnessed the cementing of the surface casing. Good circulation and good returns were observed. 341 ft of 20 in casing was ran in 368 ft of 24 in hole. About 20 plus barrels of returns were observed at the surface. Spoke with drilling consultant on site.
1299115932 2018-04-09 Preliminary Restoration No Violations I was on location today to do a preliminary restoration on this well. The well has been reporting production since 2014. All of the drilling equipment has been removed and the drilling pits have been filled in. The well is in-compliance at this time.
1390497553 2014-01-23 Drill / Deepen / Reopen No Violations I arrived on location for a site inspection. Express Energy was grouting the mousehole, and Dave Gray stated they will let it sit for 12 hours before they resume drilling the surface casing hole. There are no issues to report at this time.
1390843244 2014-01-27 Drill / Deepen / Reopen No Violations I met PDCs EH&S specialist Tony Long, out on location today. The liner was cut in the corner of the location exposing one of the pad drainage vaults. They are going to move the vehicles on top of the spot and check the vault and repair the liner this week. Tony will call me when they are ready to perform job.
1391105560 2014-01-30 Drill / Deepen / Reopen No Violations I was on location to witness the testing of the BOP.
1406823971 2014-07-31 Drill / Deepen / Reopen No Violations PDC is currently on Stage 14 of their completion operation. The average treating pressure has been around 7500-8000 psi at 80 bbls/min. Breakdown pressure for this stage was witnessed at 7310.
1410191474 2014-09-08 Drill / Deepen / Reopen No Violations PDC has removed all of the completion equipment off location and the wells are currently producing flowback water. The dike has been constructed and consists of six 500bbl tanks. Energy Services Corporation was installing equipment at the wellhead in order to monitor the surface casing pressures, and H & L Services was unloading flowback from one of the tanks.
1644855699 2018-04-04 Production Wells No Violations I am accompanied by Supervisor Dan Goins. We inspected the site for annular pressure monitoring equipment. The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings.
1787874090 2014-01-29 Drill / Deepen / Reopen No Violations I was on location to witness Universal Cement Company set the 13 3/8 casing with 1417 sacks of cement. Operator used 9 centralizers. They had good circulation and had 45 bbls of cement returns. They locked in at 700psi for 5 minutes with no issues.
1940476735 2019-02-19 Production Wells No Violations I was on location today to do a field inspection on this well. The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings. The well did not have any identification on it and is required to because there is multiple wells producing into the same production tanks. The pumper was on location during my inspection so let him know that the well needed legible identification on it.

For data sources see[1]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2020-08-08 H2O 15 7757 Bbl 70800 CalFrac STAGES 36/36

30 SHOTS

2020-07-16 H2O 15 9013 Bbl 387050 CalFrac STAGE 1/36

30 SHOTS STAGES 2-35 SEE IMAGES

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-11-15 Proposed Formations:POINT PLEASANT, Issued Date:11/15/2013, Expired Date:11/15/2015 12:00:00 PM, Drilling unit acres:627, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-12-06 CORRECTION TO SURFACE FOOTAGE.
Reached Total Depth 2014-03-29 FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.
Completion Report Received 2014-12-10 FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.
Correction to Well 2015-02-20 CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED.
Construction Permit Expires 2015-11-15 FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.
Change of Owner 2018-05-04 Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC
Record Last Modified 2019-01-22 FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE.

For data sources see[1]

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "RBDMS". Ohio Department of Natural Resources. 2019-05-07. Retrieved 2019-05-21. 
  2. 2.0 2.1 "Ohio Combined Annual Production Data". Ohio Department of Natural Resources. 2019-05-07. Retrieved 2019-05-21.