Well ID: 34-115-24684 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.6,"lon":-81.66,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Center Township | |
Operator Name: UTICA RESOURCE OPERATING LLC | |
Well Pad ID: US-OH-000823 | |
Farm/Lease Name: PALMER | |
License Status: Producing | |
License Date: 2013-11-15 | |
Spud Date: 2013-11-27 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2014-03-29 | |
Well Total Depth: 14460.00 ft | |
Configuration: Horizontal | |
Latitude: 39.600000 | |
Longitude: -81.660000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-11-15 | Proposed Formations:POINT PLEASANT, Issued Date:11/15/2013, Expired Date:11/15/2015 12:00:00 PM, Drilling unit acres:627, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2013-12-06 | CORRECTION TO SURFACE FOOTAGE. |
Reached Total Depth | 2014-03-29 | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. |
Completion Report Received | 2014-12-10 | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. |
Correction to Well | 2015-02-20 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED. |
Construction Permit Expires | 2015-11-15 | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. |
Change of Owner | 2018-05-04 | Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC |
Record Last Modified | 2019-01-22 | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2020-08-08 | H2O | 15 | 7757 Bbl | 70800 | CalFrac | STAGES 36/36
30 SHOTS |
2020-07-16 | H2O | 15 | 9013 Bbl | 387050 | CalFrac | STAGE 1/36
30 SHOTS STAGES 2-35 SEE IMAGES |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | PDC ENERGY INC | 85899 | 23455 | 120 |
2015 | PDC ENERGY INC | 195224 | 25471 | 361 |
2016 | PDC ENERGY INC | 135892 | 11277 | 364 |
2017 | PDC ENERGY INC | 104996 | 7193 | 356 |
2018 | UTICA RESOURCE OPERATING LLC | 92899 | 4180 | 364 |
2019 | UTICA RESOURCE OPERATING LLC | 22161 | 1158 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | PDC ENERGY INC | Brine | 20131 | 120 |
2015 | PDC ENERGY INC | Brine | 10718 | 361 |
2016 | PDC ENERGY INC | Brine | 5145 | 364 |
2017 | PDC ENERGY INC | Brine | 2778 | 356 |
2018 | UTICA RESOURCE OPERATING LLC | Brine | 1377 | 273 |
2019 | UTICA RESOURCE OPERATING LLC | Brine | 360 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1787874090 | 2014-1-29 0:00: | DD | No Violations | 7.50 |
-1940476735 | 2019-2-19 0:00: | PW | No Violations | 0.20 |
-729544026 | 2017-1-23 0:00: | PW | No Violations | 0.50 |
-853103158 | 2014-1-25 0:00: | DD | No Violations | 4.50 |
0406366972 | 2014-03-24 | Drill / Deepen / Reopen | No Violations | PDC is currently drilling the horizotal lateral and mudloggers are on location taking samples. They are currently at 8571 MD. |
0725912596 | 2014-02-05 | Drill / Deepen / Reopen | No Violations | I arrived on location and they were in the process of hooking up the wireline truck in order to run the gyro. |
0729544026 | 2017-01-23 | Production Wells | No Violations | The inspection this day revealed that this well is equipped with a plunger lift system, a 4 1/2 inch diameter wellhead, 2 inch diameter steel production lines, and 1 1/2 inch diameter production tubing. The valves on the wellhead are open at the time of inspection. The tank battery consist of six (6) 500 barrel steel tanks in a containment dike. Identification for the wells and tanks are posted and in proper order. The well tender for PDC was on site at the time of inspection. He informed me that PDC has a thermal picture taken every 3 months of the pad to look for any leaks and there have not been any of recent. There are no issues at the time of inspection and this well is in production at the time of inspection. |
0762080886 | 2014-07-31 | Completion Testing | No Violations | Witnessed partial frac with inspector Jake Glascock. The company was beginning the 12th stage of their lateral frac. Formation breakdown pressure was 7200 psi. |
0853103158 | 2014-01-25 | Drill / Deepen / Reopen | No Violations | Witnessed the cementing of the surface casing. Good circulation and good returns were observed. 341 ft of 20 in casing was ran in 368 ft of 24 in hole. About 20 plus barrels of returns were observed at the surface. Spoke with drilling consultant on site. |
1299115932 | 2018-04-09 | Preliminary Restoration | No Violations | I was on location today to do a preliminary restoration on this well. The well has been reporting production since 2014. All of the drilling equipment has been removed and the drilling pits have been filled in. The well is in-compliance at this time. |
1390497553 | 2014-01-23 | Drill / Deepen / Reopen | No Violations | I arrived on location for a site inspection. Express Energy was grouting the mousehole, and Dave Gray stated they will let it sit for 12 hours before they resume drilling the surface casing hole. There are no issues to report at this time. |
1390843244 | 2014-01-27 | Drill / Deepen / Reopen | No Violations | I met PDCs EH&S specialist Tony Long, out on location today. The liner was cut in the corner of the location exposing one of the pad drainage vaults. They are going to move the vehicles on top of the spot and check the vault and repair the liner this week. Tony will call me when they are ready to perform job. |
1391105560 | 2014-01-30 | Drill / Deepen / Reopen | No Violations | I was on location to witness the testing of the BOP. |
1406823971 | 2014-07-31 | Drill / Deepen / Reopen | No Violations | PDC is currently on Stage 14 of their completion operation. The average treating pressure has been around 7500-8000 psi at 80 bbls/min. Breakdown pressure for this stage was witnessed at 7310. |
1410191474 | 2014-09-08 | Drill / Deepen / Reopen | No Violations | PDC has removed all of the completion equipment off location and the wells are currently producing flowback water. The dike has been constructed and consists of six 500bbl tanks. Energy Services Corporation was installing equipment at the wellhead in order to monitor the surface casing pressures, and H & L Services was unloading flowback from one of the tanks. |
1644855699 | 2018-04-04 | Production Wells | No Violations | I am accompanied by Supervisor Dan Goins. We inspected the site for annular pressure monitoring equipment. The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings. |
1787874090 | 2014-01-29 | Drill / Deepen / Reopen | No Violations | I was on location to witness Universal Cement Company set the 13 3/8 casing with 1417 sacks of cement. Operator used 9 centralizers. They had good circulation and had 45 bbls of cement returns. They locked in at 700psi for 5 minutes with no issues. |
1940476735 | 2019-02-19 | Production Wells | No Violations | I was on location today to do a field inspection on this well. The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings. The well did not have any identification on it and is required to because there is multiple wells producing into the same production tanks. The pumper was on location during my inspection so let him know that the well needed legible identification on it. |
406366972 | 2014-3-24 0:00: | DD | No Violations | 2.00 |
725912596 | 2014-2-5 0:00:0 | DD | No Violations | 1.80 |
762080886 | 2014-7-31 0:00: | CT | No Violations | 2.50 |
For data sources see[8]