X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-117-24241"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-117-24241
 
| Well ID: 34-117-24241
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.56220971, -82.66117471 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.562101702, -82.66143406 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Morrow County, Ohio|Morrow]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name: [[SCION ENERGY, INC.]]
+
| County: [[Morrow_County,_Ohio|Morrow]]
 +
|-
 +
| Municipality: [[Perry,_Morrow_County,_Ohio|Perry]]
 +
|-
 +
| Operator Name: [[SCION ENERGY INC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: SEI-M & A KRABILL-JORDON UNIT
 
|-
 
|-
| First Permit Date:  
+
| License Status: Final Restoration
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2012-12-11
 
|-
 
|-
 
| Spud Date: 2012-06-25
 
| Spud Date: 2012-06-25
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[KILBARGER DRLG]]
 +
|-
 +
| Final Drill Date: 2012-07-07
 +
|-
 +
| Well Total Depth: 3950 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Final Restoration
+
| Latitude: 40.562101702
 
|-
 
|-
| Violations: 0
+
| Longitude: -82.66143406
 +
|}
 +
For data sources see<ref name=RBDMS>{{cite web
 +
| title = RBDMS
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" style="width: 50%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
| Latitude: 40.56220971
+
|}-->
 +
 
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
| Longitude: -82.66117471
+
|}-->
 +
 
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
|}
+
|}-->
 +
 
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION COMMENT
+
| 0089887781
 +
| 2012-07-05
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Kilbarger #1 went to fluid after holiday shut down, unable to unload hole possible bad cement job on the 7 intermediate casing (unable to shut off  Newburg water). Drilling 3392 Trenton top 3363 (stratagraph mudlogger pick).
 +
|-
 +
| 0799974661
 +
| 2012-08-10
 +
| Final Restoration
 +
| No Violations
 +
| Miller roustabout has planted wheat on the 2.5 acre site. The gravel access road and plastic culvert have been removed.
 
|-
 
|-
 
| 1340125984
 
| 1340125984
 
| 2012-06-19
 
| 2012-06-19
|  
+
| Drill / Deepen /  Reopen
| Preliminary site inspection. Miller roustabout has removed  2-3 feet of top soil off of the location (down to clay) and piled it surrounding the location which prevents run-off. A large air pit has been dug and they are waiting on the location to dry before digging the fluid pit. The entrance off state route 314 is rocked and a 12' plastic ditch culvert installed.
+
| No Violations
|
+
| Preliminary site inspection. Miller roustabout has removed  2-3 feet of top soil off of the location (down to clay) and piled it surrounding the location which prevents run-off. A large air pit has been dug and they are waiting on the location to dry before digging the fluid pit. The entrance off state route 314 is rocked and a 12 plastic ditch culvert installed.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1340720369
 
| 1340720369
 
| 2012-06-26
 
| 2012-06-26
|  
+
| Drill / Deepen /  Reopen
| Kilbarger #1 move in and spud 2:30 p.m. 6/25/2012.  Set 90' of 13.375' 36# new conductor, not cemented.  6/26/2012 10:00 a.m. go to fluid at 460'.  Reached total depth on surface hole at 669', 3:25 p.m. on fluid. 5:00 p.m. O's power tongs running 9.625 surface casing. Hit bridge at 110'. 6:00 p.m. lay down surface casing. Kilbarger #1 going in hole to ream. 8:15 p.m. going back in hole with surface casing. 9:00 p.m. hit bridge again at 110'. Pull out of hole and go in without casing shoe. Hit bridge at 110', unable to get through. 10:30 p.m. decision made by Tom Roberts to pull conductor and drill deeper to set conductor deeper. Permit shows 121' of drift.
+
| No Violations
|
+
| Kilbarger #1 move in and spud 2:30 p.m. 6/25/2012.  Set 90 of 13.375 36# new conductor, not cemented.  6/26/2012 10:00 a.m. go to fluid at 460.  Reached total depth on surface hole at 669, 3:25 p.m. on fluid. 5:00 p.m. Os power tongs running 9.625 surface casing. Hit bridge at 110. 6:00 p.m. lay down surface casing. Kilbarger #1 going in hole to ream. 8:15 p.m. going back in hole with surface casing. 9:00 p.m. hit bridge again at 110. Pull out of hole and go in without casing shoe. Hit bridge at 110, unable to get through. 10:30 p.m. decision made by Tom Roberts to pull conductor and drill deeper to set conductor deeper. Permit shows 121 of drift.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1340827784
 
| 1340827784
 
| 2012-06-27
 
| 2012-06-27
|  
+
| Drill / Deepen /  Reopen
| Kilbarger #1 pulled conductor, went back in hole and reamed. Ran 150' conductor, not cemented. 10:00 a.m. run back in hole with 12.25 bit to clean out hole to 659' and circulate clean.. 3:00 p.m. O's power tong's rig up and start running 9.625 with guide shoe on bottom, ran 591' set at 601'.  4:15 Formation cementing hooking up. Formation gained circulation by pumping 59 barrels gel and lost circulation material (cottonseed hulls) ahead of 210 sacks class A displaced by 45.3 barrels. Plug down 5:15 p.m. Good cement circulation at surface which held.
+
| No Violations
|
+
| Kilbarger #1 pulled conductor, went back in hole and reamed. Ran 150 conductor, not cemented. 10:00 a.m. run back in hole with 12.25 bit to clean out hole to 659 and circulate clean.. 3:00 p.m. Os power tongs rig up and start running 9.625 with guide shoe on bottom, ran 591 set at 601.  4:15 Formation cementing hooking up. Formation gained circulation by pumping 59 barrels gel and lost circulation material (cottonseed hulls) ahead of 210 sacks class A displaced by 45.3 barrels. Plug down 5:15 p.m. Good cement circulation at surface which held.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1341240170
 
| 1341240170
 
| 2012-07-02
 
| 2012-07-02
|  
+
| Drill / Deepen /  Reopen
| Kilbarger #1 drilling ahead on soap 3037' 2 hours per kelly.  D.V. survey 2970' 2.75 degree.
+
| No Violations
|
+
| Kilbarger #1 drilling ahead on soap 3037 2 hours per kelly.  D.V. survey 2970 2.75 degree.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1341698763
 
| 1341698763
 
| 2012-07-07
 
| 2012-07-07
|  
+
| Plug / Plug Back
| Kilbarger #1 reached total depth at 3950' in the Trempealeau on 8.6 pound KCL fluid. Appalachian well surveys logged well. Decision made to plug well. Formation cementing on location 5:00 p.m. Kilbarger on bottom with drill pipe (open ended) 7:30 p.m. break circulation, start first plug. When pulling out of hole for the surface casing plug realized they lost 7 joints (210') of drill pipe, probably when hitting a bridge inside the 7 at 1930'. See plug report for detailed description. Final adjusted plugs: 1) 3713-3363. 2) 1891-1691. 3) 1199-999. 4) 414-190. 5) 125-ground level. Broke circulation before all plugs. Finish plugging well at 1:15 a.m. circulated Class A cement to surface which held.  Kilbarger #1 well bore deviation surveys: 1) 650'-1 degree  2) 754'-3.5  3) 849'-1.5  4) 1230'-1.25  5) 2150'-.5  6) 2470'-.75  7) 2849'-3.5  8) 2913'-3  9) 2970'- 2.75  10) 3040'-1  11) 3225'-1.75  12) 3250'-1.75  13) 3360-.75.
+
| No Violations
|
+
| Kilbarger #1 reached total depth at 3950 in the Trempealeau on 8.6 pound KCL fluid. Appalachian well surveys logged well. Decision made to plug well. Formation cementing on location 5:00 p.m. Kilbarger on bottom with drill pipe (open ended) 7:30 p.m. break circulation, start first plug. When pulling out of hole for the surface casing plug realized they lost 7 joints (210) of drill pipe, probably when hitting a bridge inside the 7 at 1930. See plug report for detailed description. Final adjusted plugs: 1) 3713-3363. 2) 1891-1691. 3) 1199-999. 4) 414-190. 5) 125-ground level. Broke circulation before all plugs. Finish plugging well at 1:15 a.m. circulated Class A cement to surface which held.  Kilbarger #1 well bore deviation surveys: 1) 650-1 degree  2) 754-3.5  3) 849-1.5  4) 1230-1.25  5) 2150-.5  6) 2470-.75  7) 2849-3.5  8) 2913-3  9) 2970- 2.75  10) 3040-1  11) 3225-1.75  12) 3250-1.75  13) 3360-.75.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1342550145
 
| 1342550145
 
| 2012-07-17
 
| 2012-07-17
|  
+
| Preliminary Restoration
 +
| No Violations
 
| The preliminary restoration has begun on the Krabil-Jordon Unit #1 by Miller roustabout. Both the air and fluid pits have been filled and compacted. All drilling debris and trash has been removed. Miller is currently working on replacing the topsoil.
 
| The preliminary restoration has begun on the Krabil-Jordon Unit #1 by Miller roustabout. Both the air and fluid pits have been filled and compacted. All drilling debris and trash has been removed. Miller is currently working on replacing the topsoil.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1681221138
 +
| 2012-07-06
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Kilbarger #1 drilling ahead on fluid 3630 (Black River) 1.5 hours per kelly.
 +
|-
 +
| 1787140308
 +
| 2012-06-28
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Kilbarger #1 drilling ahead at 960 on air. D.V. survey 754 3.5 degree, 849 1.5 degree.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref name=RBDMS/>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 
|-
 
|-
| -1681221138
+
|}-->
| 2012-07-06
+
<!--==== Fluid Composition Data ====
|  
+
{| class="wikitable sortable" style="width: 100%"
| Kilbarger #1 drilling ahead on fluid 3630' (Black River) 1.5 hours per kelly.
+
!scope="col" style="text-align: center"| Job Number
|  
+
!scope="col" style="text-align: center"| Trade Name
|  
+
!scope="col" style="text-align: center"| Supplier
|  
+
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
 +
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| -1787140308
+
|}-->
| 2012-06-28
+
 
|
+
== Well History ==
| Kilbarger #1 drilling ahead at 960' on air. D.V. survey 754' 3.5 degree, 849' 1.5 degree.
+
{| class="wikitable sortable" width="95%"
|  
+
!scope="col" style="text-align: center"| Well Status
|  
+
!scope="col" style="width: 15%;text-align: center"| Well Status Date
|  
+
!scope="col" style="text-align: center"| Comment
 
|-
 
|-
 +
| APP
 +
| 2012-04-20
 +
| Proposed Formations:UTICA THRU TREMPEALEAU (MAY NOT PRODUCE BLACK RIVER), Issued Date:4/20/2012, Expired Date:4/20/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
 
|-
 
|-
| 799974661
+
| Reached Total Depth
| 2012-08-10
+
| 2012-07-07
 
|  
 
|  
| Miller roustabout has planted wheat on the 2.5 acre site. The gravel access road and plastic culvert have been removed.
+
|-
 +
| Plugged/Abandoned
 +
| 2012-07-08
 
|  
 
|  
 +
|-
 +
| Completion Report Received
 +
| 2012-11-14
 
|  
 
|  
 +
|-
 +
| Construction Permit Expires
 +
| 2014-04-20
 
|  
 
|  
 
|-
 
|-
|-
+
| Record Last Modified
| -89887781
+
| 2017-10-24
| 2012-07-05
 
|
 
| Kilbarger #1 went to fluid after holiday shut down, unable to unload hole possible bad cement job on the 7 intermediate casing (unable to shut off  Newburg water). Drilling 3392' Trenton top 3363' (stratagraph mudlogger pick).
 
|
 
|
 
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
For data sources see<ref name=RBDMS/>
| title = Ohio Department of Natural Resources RBDMS
+
==References==
| publisher = [http://oilandgas.ohiodnr.gov/]
+
<references/>
| date = 2015-06-19
 
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 
| accessdate = 2015-06-20 }}</ref>
 
== References ==
 
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 19:14, 21 July 2019

Well Details

Well ID: 34-117-24241
Loading map...
Country: United States
State: Ohio
County: Morrow
Municipality: Perry
Operator Name: SCION ENERGY INC
Well Pad ID:
Farm/Lease Name: SEI-M & A KRABILL-JORDON UNIT
License Status: Final Restoration
License Date: 2012-12-11
Spud Date: 2012-06-25
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2012-07-07
Well Total Depth: 3950 ft
Configuration: Vertical
Latitude: 40.562101702
Longitude: -82.66143406

For data sources see[1]


Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0089887781 2012-07-05 Drill / Deepen / Reopen No Violations Kilbarger #1 went to fluid after holiday shut down, unable to unload hole possible bad cement job on the 7 intermediate casing (unable to shut off Newburg water). Drilling 3392 Trenton top 3363 (stratagraph mudlogger pick).
0799974661 2012-08-10 Final Restoration No Violations Miller roustabout has planted wheat on the 2.5 acre site. The gravel access road and plastic culvert have been removed.
1340125984 2012-06-19 Drill / Deepen / Reopen No Violations Preliminary site inspection. Miller roustabout has removed 2-3 feet of top soil off of the location (down to clay) and piled it surrounding the location which prevents run-off. A large air pit has been dug and they are waiting on the location to dry before digging the fluid pit. The entrance off state route 314 is rocked and a 12 plastic ditch culvert installed.
1340720369 2012-06-26 Drill / Deepen / Reopen No Violations Kilbarger #1 move in and spud 2:30 p.m. 6/25/2012. Set 90 of 13.375 36# new conductor, not cemented. 6/26/2012 10:00 a.m. go to fluid at 460. Reached total depth on surface hole at 669, 3:25 p.m. on fluid. 5:00 p.m. Os power tongs running 9.625 surface casing. Hit bridge at 110. 6:00 p.m. lay down surface casing. Kilbarger #1 going in hole to ream. 8:15 p.m. going back in hole with surface casing. 9:00 p.m. hit bridge again at 110. Pull out of hole and go in without casing shoe. Hit bridge at 110, unable to get through. 10:30 p.m. decision made by Tom Roberts to pull conductor and drill deeper to set conductor deeper. Permit shows 121 of drift.
1340827784 2012-06-27 Drill / Deepen / Reopen No Violations Kilbarger #1 pulled conductor, went back in hole and reamed. Ran 150 conductor, not cemented. 10:00 a.m. run back in hole with 12.25 bit to clean out hole to 659 and circulate clean.. 3:00 p.m. Os power tongs rig up and start running 9.625 with guide shoe on bottom, ran 591 set at 601. 4:15 Formation cementing hooking up. Formation gained circulation by pumping 59 barrels gel and lost circulation material (cottonseed hulls) ahead of 210 sacks class A displaced by 45.3 barrels. Plug down 5:15 p.m. Good cement circulation at surface which held.
1341240170 2012-07-02 Drill / Deepen / Reopen No Violations Kilbarger #1 drilling ahead on soap 3037 2 hours per kelly. D.V. survey 2970 2.75 degree.
1341698763 2012-07-07 Plug / Plug Back No Violations Kilbarger #1 reached total depth at 3950 in the Trempealeau on 8.6 pound KCL fluid. Appalachian well surveys logged well. Decision made to plug well. Formation cementing on location 5:00 p.m. Kilbarger on bottom with drill pipe (open ended) 7:30 p.m. break circulation, start first plug. When pulling out of hole for the surface casing plug realized they lost 7 joints (210) of drill pipe, probably when hitting a bridge inside the 7 at 1930. See plug report for detailed description. Final adjusted plugs: 1) 3713-3363. 2) 1891-1691. 3) 1199-999. 4) 414-190. 5) 125-ground level. Broke circulation before all plugs. Finish plugging well at 1:15 a.m. circulated Class A cement to surface which held. Kilbarger #1 well bore deviation surveys: 1) 650-1 degree 2) 754-3.5 3) 849-1.5 4) 1230-1.25 5) 2150-.5 6) 2470-.75 7) 2849-3.5 8) 2913-3 9) 2970- 2.75 10) 3040-1 11) 3225-1.75 12) 3250-1.75 13) 3360-.75.
1342550145 2012-07-17 Preliminary Restoration No Violations The preliminary restoration has begun on the Krabil-Jordon Unit #1 by Miller roustabout. Both the air and fluid pits have been filled and compacted. All drilling debris and trash has been removed. Miller is currently working on replacing the topsoil.
1681221138 2012-07-06 Drill / Deepen / Reopen No Violations Kilbarger #1 drilling ahead on fluid 3630 (Black River) 1.5 hours per kelly.
1787140308 2012-06-28 Drill / Deepen / Reopen No Violations Kilbarger #1 drilling ahead at 960 on air. D.V. survey 754 3.5 degree, 849 1.5 degree.

For data sources see[1]


Well History

Well Status Well Status Date Comment
APP 2012-04-20 Proposed Formations:UTICA THRU TREMPEALEAU (MAY NOT PRODUCE BLACK RIVER), Issued Date:4/20/2012, Expired Date:4/20/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-07-07
Plugged/Abandoned 2012-07-08
Completion Report Received 2012-11-14
Construction Permit Expires 2014-04-20
Record Last Modified 2017-10-24

For data sources see[1]

References

  1. 1.0 1.1 1.2 "RBDMS". Ohio Department of Natural Resources. 2019-05-07. Retrieved 2019-05-21.