If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-153-23169 | | Well ID: 34-153-23169 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.018612842, -81.56112989 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | Municipality: | + | | State: Ohio |
+ | |- | ||
+ | | County: [[Summit_County,_Ohio|Summit]] | ||
+ | |- | ||
+ | | Municipality: [[Coventry_Township,_Summit_County,_Ohio|Coventry Township]] | ||
|- | |- | ||
| Operator Name: [[CARGILL INC]] | | Operator Name: [[CARGILL INC]] | ||
Line 13: | Line 17: | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: CITY OF AKRON (SMP #4) |
|- | |- | ||
− | | | + | | License Status: Active Injection |
|- | |- | ||
− | | | + | | License Date: 2014-08-20 |
|- | |- | ||
| Spud Date: 2014-01-02 | | Spud Date: 2014-01-02 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[DALLAS MORRIS]] |
+ | |- | ||
+ | | Final Drill Date: 2014-01-16 | ||
+ | |- | ||
+ | | Well Total Depth: 3107 ft | ||
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | | + | | Latitude: 41.018612842 |
|- | |- | ||
− | | | + | | Longitude: -81.56112989 |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
+ | |- | ||
+ | | APP | ||
+ | | 2013-08-20 | ||
+ | | Proposed Formations:SALINA, Issued Date:8/20/2013, Expired Date:8/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP | ||
|- | |- | ||
− | | | + | | Reached Total Depth |
+ | | 2014-01-16 | ||
+ | |||
|- | |- | ||
− | | | + | | Last Compliance Report |
+ | | 2014-01-30 | ||
+ | |||
+ | |- | ||
+ | | Completion Report Received | ||
+ | | 2014-05-05 | ||
+ | |||
+ | |- | ||
+ | | Construction Permit Expires | ||
+ | | 2014-08-20 | ||
+ | |||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2017-02-10 | ||
+ | |||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Gas Quantity (mcf) | ||
+ | !scope="col" style="text-align: center"| Oil Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | |}--> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | + | |- |
− | + | | 0180841599 | |
+ | | 2018-07-09 | ||
+ | | Solution Mining Project | ||
+ | | No Violations | ||
+ | | I was on location for a MIT. I met with Carey Morgan with Cargill. The net pressure change for the well was 0.016 psi/hr which is well below the minimum required net pressure change of 0.05 psi/hr. I observed no leaks or spill during the test. | ||
+ | |- | ||
+ | | 0871804836 | ||
+ | | 2014-01-30 | ||
+ | | Solution Mining Project | ||
+ | | No Violations | ||
+ | | I was on location to observe the Cement Bond Evaluation and pressure testing of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco topped off the 7 casing from the top to eliminate any air entrapment and then tied on to a 2 port on the Pack-Off Sub to catch any Brine displaced by the logging tool and wireline. Permit Construction Conditions require a pressure test to a minimum of 525 psi for a 15 minute duration. Hilco pressured up the 7 casing to 600 psi and isolated the 7casing from the pump truck. After allowing the well to stabilize, the air was bled - off in order to conduct the test. Numerous leaks were noticed around the collar. Repair attempts were performed and the the test moved forward. Hilco pressured up to 600 psi @ 1722 hrs.. Pressure was 590 psi @ 1727 psi. , 583 psi @ 1732 hrs. , 580 psi. @ 1737 hrs.. Total pressure drop was 20 psi through the test. A bad collar contributed to the pressure drop. Since the pressure drop was within the allowable ( 5 % = 30 psi. ) the test is considered successful. | ||
|- | |- | ||
| 1391095261 | | 1391095261 | ||
| 2014-01-30 | | 2014-01-30 | ||
− | | | + | | Solution Mining Project |
+ | | No Violations | ||
| I was on location to observe the Cement Bond Evaluation and pressure test of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco top off the 7 casing with Brine then tied into the casing ( through a 2 port ) to catch any fluid displaced by the logging tools and wireline. Permit Construction Conitions require a preesure test of a minimum of 525 psi held for a 15 minute duration. Hilco pressured up on the casing to 600 psi and isolated the 7 casing from the pump truck. Air was bled out of the system repeatedly and @ 1349Hrs. Hilco pressured up to 600 psi. to start the test. At 1354Hrs. - 600 psi., at 1359 Hrs.- 593 psi., at 1404 Hrs. - 590 psi., test ended at 1408 Hrs. with final pressure reading of 590 psi. A 10 Lbs. pressure drop is within the 5% alowable. Test passed. | | I was on location to observe the Cement Bond Evaluation and pressure test of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco top off the 7 casing with Brine then tied into the casing ( through a 2 port ) to catch any fluid displaced by the logging tools and wireline. Permit Construction Conitions require a preesure test of a minimum of 525 psi held for a 15 minute duration. Hilco pressured up on the casing to 600 psi and isolated the 7 casing from the pump truck. Air was bled out of the system repeatedly and @ 1349Hrs. Hilco pressured up to 600 psi. to start the test. At 1354Hrs. - 600 psi., at 1359 Hrs.- 593 psi., at 1404 Hrs. - 590 psi., test ended at 1408 Hrs. with final pressure reading of 590 psi. A 10 Lbs. pressure drop is within the 5% alowable. Test passed. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1722258280 | ||
+ | | 2016-08-16 | ||
+ | | Solution Mining Project | ||
+ | | No Violations | ||
+ | | There were no violations at the time of inspection. | ||
|- | |- | ||
− | | | + | | 1925391801 |
| 2014-12-05 | | 2014-12-05 | ||
− | | | + | | Preliminary Restoration |
+ | | No Violations | ||
| The preliminary restoration was complete and meets all requirements. | | The preliminary restoration was complete and meets all requirements. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
|- | |- | ||
− | | - | + | |}--> |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables |
− | | publisher = [ | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-153-23169 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.018612842,"lon":-81.56112989,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Coventry Township | |
Operator Name: CARGILL INC | |
Well Pad ID: | |
Farm/Lease Name: CITY OF AKRON (SMP #4) | |
License Status: Active Injection | |
License Date: 2014-08-20 | |
Spud Date: 2014-01-02 | |
Spud Drilling Contractor: DALLAS MORRIS | |
Final Drill Date: 2014-01-16 | |
Well Total Depth: 3107 ft | |
Configuration: Vertical | |
Latitude: 41.018612842 | |
Longitude: -81.56112989 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-08-20 | Proposed Formations:SALINA, Issued Date:8/20/2013, Expired Date:8/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP |
Reached Total Depth | 2014-01-16 | |
Last Compliance Report | 2014-01-30 | |
Completion Report Received | 2014-05-05 | |
Construction Permit Expires | 2014-08-20 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0180841599 | 2018-07-09 | Solution Mining Project | No Violations | I was on location for a MIT. I met with Carey Morgan with Cargill. The net pressure change for the well was 0.016 psi/hr which is well below the minimum required net pressure change of 0.05 psi/hr. I observed no leaks or spill during the test. |
0871804836 | 2014-01-30 | Solution Mining Project | No Violations | I was on location to observe the Cement Bond Evaluation and pressure testing of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco topped off the 7 casing from the top to eliminate any air entrapment and then tied on to a 2 port on the Pack-Off Sub to catch any Brine displaced by the logging tool and wireline. Permit Construction Conditions require a pressure test to a minimum of 525 psi for a 15 minute duration. Hilco pressured up the 7 casing to 600 psi and isolated the 7casing from the pump truck. After allowing the well to stabilize, the air was bled - off in order to conduct the test. Numerous leaks were noticed around the collar. Repair attempts were performed and the the test moved forward. Hilco pressured up to 600 psi @ 1722 hrs.. Pressure was 590 psi @ 1727 psi. , 583 psi @ 1732 hrs. , 580 psi. @ 1737 hrs.. Total pressure drop was 20 psi through the test. A bad collar contributed to the pressure drop. Since the pressure drop was within the allowable ( 5 % = 30 psi. ) the test is considered successful. |
1391095261 | 2014-01-30 | Solution Mining Project | No Violations | I was on location to observe the Cement Bond Evaluation and pressure test of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco top off the 7 casing with Brine then tied into the casing ( through a 2 port ) to catch any fluid displaced by the logging tools and wireline. Permit Construction Conitions require a preesure test of a minimum of 525 psi held for a 15 minute duration. Hilco pressured up on the casing to 600 psi and isolated the 7 casing from the pump truck. Air was bled out of the system repeatedly and @ 1349Hrs. Hilco pressured up to 600 psi. to start the test. At 1354Hrs. - 600 psi., at 1359 Hrs.- 593 psi., at 1404 Hrs. - 590 psi., test ended at 1408 Hrs. with final pressure reading of 590 psi. A 10 Lbs. pressure drop is within the 5% alowable. Test passed. |
1722258280 | 2016-08-16 | Solution Mining Project | No Violations | There were no violations at the time of inspection. |
1925391801 | 2014-12-05 | Preliminary Restoration | No Violations | The preliminary restoration was complete and meets all requirements. |
For data sources see[3]