If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-129-28903 | | Well ID: 37-129-28903 | ||
| − | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.394911, -79.592467 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
| Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
| − | | Spud Date: 07 | + | | Spud Date: 2016-07-12 |
|- | |- | ||
| − | | Permit Date: | + | | Permit Date: 2015-06-08 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
| Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
| + | == Fracking Activities == | ||
| + | ==== Fracking Jobs ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Job Number | ||
| + | !scope="col" | Job Start Date | ||
| + | !scope="col" | Job End Date | ||
| + | !scope="col" | True Vertical Depth (ft) | ||
| + | !scope="col" | Total Water Volume (gal) | ||
| + | !scope="col" | Total Non-Water Volume (gal) | ||
| + | |- | ||
| + | | 1 | ||
| + | | 2017-04-30 | ||
| + | | 2017-05-20 | ||
| + | | style="text-align: right;" | 7511 | ||
| + | | style="text-align: right;" | 21,102,700.0 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | |} | ||
| + | ==== Fluid Composition Data ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Job Number | ||
| + | !scope="col" | Trade Name | ||
| + | !scope="col" | Supplier | ||
| + | !scope="col" | Purpose | ||
| + | !scope="col" | Ingredient Name | ||
| + | !scope="col" | CAS Number | ||
| + | !scope="col" | Additive Percentage by Mass | ||
| + | !scope="col" | Job Percentage by Mass | ||
| + | !scope="col" | Mass Used (lb) | ||
| + | |- | ||
| + | |- valign="top" | ||
| + | | rowspan="18"| 1 | ||
| + | | rowspan="7"| NEFE-180 | ||
| + | | rowspan="7"| Producers Service Corp | ||
| + | | rowspan="7"| Corrosion Inhibitor/Iron Control | ||
| + | | 2-Ethylhexanol | ||
| + | | 104-76-7 | ||
| + | | style="text-align: right;" | 10 | ||
| + | | style="text-align: right;" | 0.000291516 | ||
| + | | style="text-align: right;" | 608.05 | ||
| + | |- | ||
| + | | Coconut oil acid diethanolamine | ||
| + | | 68603-42-9 | ||
| + | | style="text-align: right;" | 5 | ||
| + | | style="text-align: right;" | 0.000145758 | ||
| + | | style="text-align: right;" | 304.025 | ||
| + | |- | ||
| + | | Fatty Acids, tall oil | ||
| + | | 61790-12-3 | ||
| + | | style="text-align: right;" | 5 | ||
| + | | style="text-align: right;" | 0.000145758 | ||
| + | | style="text-align: right;" | 304.025 | ||
| + | |- | ||
| + | | 2-Propyn-1-ol | ||
| + | | 107-19-7 | ||
| + | | style="text-align: right;" | 5 | ||
| + | | style="text-align: right;" | 0.000145758 | ||
| + | | style="text-align: right;" | 304.025 | ||
| + | |- | ||
| + | | Acetic Acid | ||
| + | | 64-19-7 | ||
| + | | style="text-align: right;" | 65 | ||
| + | | style="text-align: right;" | 0.00189485 | ||
| + | | style="text-align: right;" | 3952.33 | ||
| + | |- | ||
| + | | Methanol | ||
| + | | 67-56-1 | ||
| + | | style="text-align: right;" | 35 | ||
| + | | style="text-align: right;" | 0.00102031 | ||
| + | | style="text-align: right;" | 2128.18 | ||
| + | |- | ||
| + | | Alcohols, C14-15, ethoxylated | ||
| + | | 68951-67-7 | ||
| + | | style="text-align: right;" | 5 | ||
| + | | style="text-align: right;" | 0.000145758 | ||
| + | | style="text-align: right;" | 304.025 | ||
| + | |- | ||
| + | |- valign="top" | ||
| + | | rowspan="4"| SI-1171 | ||
| + | | rowspan="4"| Producers Service Corp | ||
| + | | rowspan="4"| Scale Inhibitor | ||
| + | | DETA phosphonate | ||
| + | | 15827-60-8 | ||
| + | | style="text-align: right;" | 3 | ||
| + | | style="text-align: right;" | 0.000421741 | ||
| + | | style="text-align: right;" | 879.677 | ||
| + | |- | ||
| + | | Phosphino Carboxylic Acid Polymer | ||
| + | | 71050-62-9 | ||
| + | | style="text-align: right;" | 3 | ||
| + | | style="text-align: right;" | 0.000421741 | ||
| + | | style="text-align: right;" | 879.677 | ||
| + | |- | ||
| + | | Hexamethylene Triamine Penta | ||
| + | | 34690-00-1 | ||
| + | | style="text-align: right;" | 3 | ||
| + | | style="text-align: right;" | 0.000421741 | ||
| + | | style="text-align: right;" | 879.677 | ||
| + | |- | ||
| + | | Copolymer of Maleic and Acrylic Acid | ||
| + | | 52255-49-9 | ||
| + | | style="text-align: right;" | 10 | ||
| + | | style="text-align: right;" | 0.0014058 | ||
| + | | style="text-align: right;" | 2932.26 | ||
| + | |- | ||
| + | |- valign="top" | ||
| + | | rowspan="4"| STIMLUBE F | ||
| + | | rowspan="4"| Producers Service Corp | ||
| + | | rowspan="4"| Friction Reducer | ||
| + | | Petroleum Distallates | ||
| + | | 64742-47-8 | ||
| + | | style="text-align: right;" | 30 | ||
| + | | style="text-align: right;" | 0.040216 | ||
| + | | style="text-align: right;" | 83883.4 | ||
| + | |- | ||
| + | | Alcohols, ethoxylated | ||
| + | | 68002-97-1 | ||
| + | | style="text-align: right;" | 3.1 | ||
| + | | style="text-align: right;" | 0.00415565 | ||
| + | | style="text-align: right;" | 8667.95 | ||
| + | |- | ||
| + | | Alcohols, ethoxylated | ||
| + | | 68439-50-9 | ||
| + | | style="text-align: right;" | 3.1 | ||
| + | | style="text-align: right;" | 0.00415565 | ||
| + | | style="text-align: right;" | 8667.95 | ||
| + | |- | ||
| + | | Alcohols, ethoxylated | ||
| + | | 68551-12-2 | ||
| + | | style="text-align: right;" | 3.1 | ||
| + | | style="text-align: right;" | 0.00415565 | ||
| + | | style="text-align: right;" | 8667.95 | ||
| + | |- | ||
| + | |- valign="top" | ||
| + | | rowspan="1"| Water | ||
| + | | rowspan="1"| Company 1 | ||
| + | | rowspan="1"| Carrier/Base Fluid | ||
| + | | Water | ||
| + | | 7732-18-5 | ||
| + | | style="text-align: right;" | 100 | ||
| + | | style="text-align: right;" | 84.4283 | ||
| + | | style="text-align: right;" | 176,102,000.0 | ||
| + | |- | ||
| + | |- valign="top" | ||
| + | | rowspan="1"| 15% HCL | ||
| + | | rowspan="1"| Producers Service Corp | ||
| + | | rowspan="1"| Acidizing | ||
| + | | Hydrochloric Acid | ||
| + | | 7647-01-0 | ||
| + | | style="text-align: right;" | 15 | ||
| + | | style="text-align: right;" | 0.079487 | ||
| + | | style="text-align: right;" | 165796 | ||
| + | |- | ||
| + | |- valign="top" | ||
| + | | rowspan="1"| Sand (Proppant) | ||
| + | | rowspan="1"| Producers Service Corp | ||
| + | | rowspan="1"| Proppant | ||
| + | | Silica Substrate | ||
| + | | 14808-60-7 | ||
| + | | style="text-align: right;" | 100 | ||
| + | | style="text-align: right;" | 14.8908 | ||
| + | | style="text-align: right;" | 31,059,500.0 | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title =FracFocus Fracking Chemicals Database | ||
| + | | date = 2019-04-02 | ||
| + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2019-06-19 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
| Line 334: | Line 503: | ||
| 2406540 | | 2406540 | ||
| Primary Facility | | Primary Facility | ||
| − | | 09 | + | | 2015-09-08 |
| Routine/Partial Inspection | | Routine/Partial Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Line 341: | Line 510: | ||
| 2407226 | | 2407226 | ||
| Primary Facility | | Primary Facility | ||
| − | | 09 | + | | 2015-09-15 |
| Routine/Partial Inspection | | Routine/Partial Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Line 348: | Line 517: | ||
| 2429849 | | 2429849 | ||
| Primary Facility | | Primary Facility | ||
| − | | 12 | + | | 2015-12-03 |
| Routine/Partial Inspection | | Routine/Partial Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Line 566: | Line 735: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
==References== | ==References== | ||
<references/> | <references/> | ||
| Well ID: 37-129-28903 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.394911,"lon":-79.592467,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Westmoreland | |
| Municipality: Salem Township | |
| Operator Name: APEX ENERGY (PA) LLC | |
| Well Pad ID: 152567 | |
| Farm/Lease Name: STEWART CENTRAL PAD-21 8H | |
| License Status: Active | |
| Spud Date: 2016-07-12 | |
| Permit Date: 2015-06-08 | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Latitude: 40.394911 | |
| Longitude: -79.592467 |
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-04-30 | 2017-05-20 | 7511 | 21,102,700.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | NEFE-180 | Producers Service Corp | Corrosion Inhibitor/Iron Control | 2-Ethylhexanol | 104-76-7 | 10 | 0.000291516 | 608.05 |
| Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.000145758 | 304.025 | ||||
| Fatty Acids, tall oil | 61790-12-3 | 5 | 0.000145758 | 304.025 | ||||
| 2-Propyn-1-ol | 107-19-7 | 5 | 0.000145758 | 304.025 | ||||
| Acetic Acid | 64-19-7 | 65 | 0.00189485 | 3952.33 | ||||
| Methanol | 67-56-1 | 35 | 0.00102031 | 2128.18 | ||||
| Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.000145758 | 304.025 | ||||
| SI-1171 | Producers Service Corp | Scale Inhibitor | DETA phosphonate | 15827-60-8 | 3 | 0.000421741 | 879.677 | |
| Phosphino Carboxylic Acid Polymer | 71050-62-9 | 3 | 0.000421741 | 879.677 | ||||
| Hexamethylene Triamine Penta | 34690-00-1 | 3 | 0.000421741 | 879.677 | ||||
| Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 10 | 0.0014058 | 2932.26 | ||||
| STIMLUBE F | Producers Service Corp | Friction Reducer | Petroleum Distallates | 64742-47-8 | 30 | 0.040216 | 83883.4 | |
| Alcohols, ethoxylated | 68002-97-1 | 3.1 | 0.00415565 | 8667.95 | ||||
| Alcohols, ethoxylated | 68439-50-9 | 3.1 | 0.00415565 | 8667.95 | ||||
| Alcohols, ethoxylated | 68551-12-2 | 3.1 | 0.00415565 | 8667.95 | ||||
| Water | Company 1 | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 84.4283 | 176,102,000.0 | |
| 15% HCL | Producers Service Corp | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.079487 | 165796 | |
| Sand (Proppant) | Producers Service Corp | Proppant | Silica Substrate | 14808-60-7 | 100 | 14.8908 | 31,059,500.0 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2016 | APEX ENERGY (PA) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2017 | APEX ENERGY (PA) LLC | 1,841,458.00 | 190 | 0.00 | 0 | 0.00 | 0 |
| 2018 | APEX ENERGY (PA) LLC | 1,730,238.00 | 297 | 0.00 | 0 | 0.00 | 0 |
| 2019 | APEX ENERGY (PA) LLC | 367,726.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|
| 2016-S02 | Drill Cuttings (in Tons) RWC 810 | 1,733.20 Tons | LANDFILL | 100280 |
| 2016-S02 | Drill Cuttings (in Tons) RWC 810 | 281.77 Tons | LANDFILL | 100594 |
| 2016-S02 | Drilling Fluid Waste (in Barrels) RWC 803 | 861.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2016-S02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 282.26 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
| 2016-S02 | Other Oil & Gas Wastes (in Tons) RWC 899 | 45.53 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 2014-181 |
| 2017-M01 | Drill Cuttings (in Tons) RWC 810 | 26.96 Tons | LANDFILL | 100280 |
| 2017-M01 | Other Oil & Gas Wastes (in Tons) RWC 899 | 70.65 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 2014-181 |
| 2017-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 42.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2017-M07 | Produced Fluid (in Barrels) RWC 802 | 3,750.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2017-M08 | Produced Fluid (in Barrels) RWC 802 | 8,320.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2017-M09 | Produced Fluid (in Barrels) RWC 802 | 1,791.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2017-M10 | Produced Fluid (in Barrels) RWC 802 | 3,009.88 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2017-M11 | Produced Fluid (in Barrels) RWC 802 | 2,611.05 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2017-M12 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 84.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2017-M12 | Produced Fluid (in Barrels) RWC 802 | 442.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
| 2017-M12 | Produced Fluid (in Barrels) RWC 802 | 1,250.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018-M01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 61.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018-M01 | Produced Fluid (in Barrels) RWC 802 | 1,643.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
| 2018-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 65.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018-M02 | Produced Fluid (in Barrels) RWC 802 | 1,455.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018-M03 | Produced Fluid (in Barrels) RWC 802 | 330.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018-M04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018-M05 | Produced Fluid (in Barrels) RWC 802 | 281.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018-M08 | Other Oil & Gas Wastes (in Tons) RWC 899 | 5.69 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 2014-181 |
| 2018-M08 | Produced Fluid (in Barrels) RWC 802 | 103.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
| 2018-M11 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 6.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018-M11 | Produced Fluid (in Barrels) RWC 802 | 1,276.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018-M12 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 21.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018-M12 | Produced Fluid (in Barrels) RWC 802 | 121.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2019-M01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 6.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2019-M01 | Produced Fluid (in Barrels) RWC 802 | 998.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2019-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 100.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2019-M02 | Produced Fluid (in Barrels) RWC 802 | 1,301.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2019-M03 | Produced Fluid (in Barrels) RWC 802 | 882.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2406540 | Primary Facility | 2015-09-08 | Routine/Partial Inspection | No Violations Noted | See inspection # 2406537 for observations made during the 9/8/2015 inspection. |
| 2407226 | Primary Facility | 2015-09-15 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well site was constructed and perimeter BMPs appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. |
| 2429849 | Primary Facility | 2015-12-03 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well site was constructed and perimeter BMPs appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. |
| 2501187 | Primary Facility | 2016-07-13 | Drilling/Alteration | No Violations Noted | The Lightning conductor Rig had drilled the conductor bore hole to a depth of 50', set pipe on bottom and was planning on cementing to surface with 4 yards of readi mix. All on site equipment looked ok. |
| 2507318 | Primary Facility | 2016-07-27 | Drilling/Alteration | No Violations Noted | Yost 6 Rigging up @ time of inspection. Site equipment looked ok. Attended pre-spud drilling meeting on site. |
| 2508128 | Primary Facility | 2016-07-28 | Drilling/Alteration | No Violations Noted | Rig drilled to 300'- ran 285' of 18 5/8" casing-pumped cement with returns. Cement dropped back to 20'-pumped 6.5 bbl pill-waiting on cement to set @ time of inspection. |
| 2508129 | Primary Facility | 2016-07-29 | Drilling/Alteration | No Violations Noted | Rig Site Supervisor reported good cement job on 18 5/8" casing-passed pressure test. Rig resumed drilling @ 300'. All equipment on site looked ok. |
| 2508140 | Primary Facility | 2016-08-02 | Drilling/Alteration | No Violations Noted | The Rig was drilling @ 2175' at the time of this inspection. BOP test chart-all equipment on site looked ok. Rig encountered 5" stream of water @ 2150' and was able to properly contain it. |
| 2510109 | Primary Facility | 2016-08-09 | Drilling/Alteration | No Violations Noted | Rig ran 2896' of 9 5/8" on 8/8/16-cemented w 1116 sks cement-40 bbl return. Drilling @ 2911' @ time of inspection. All equipment on site looked ok. |
| 2511471 | Primary Facility | 2016-08-12 | Drilling/Alteration | No Violations Noted | The Rig was shut down @ 8280' following repairs at the time of this inspection. They were getting ready to gyrolog the hole. All equipment on site looked ok. |
| 2541917 | Primary Facility | 2016-12-02 | Drilling/Alteration | No Violations Noted | Orion Rig 17 drilling @ 14,810' in the lateral at the time of this inspection. Daily on site drilling info-BOB test sheets present and ok. Rig and all equipment on site looked ok. |
| 2545519 | Primary Facility | 2016-12-15 | Drilling/Alteration | No Violations Noted | Well drilled to 23,205'. The DHA (down hole assembly) parted and was setting at 21,278' and a fishing crew was on site attempting to fish the DHA out at the time of this inspection. All equipment on site looked ok. |
| 2545558 | Primary Facility | 2016-12-19 | Drilling/Alteration | No Violations Noted | The fishing crew was unsuccessful at fishing the DHA (down hole assembly) out of the lateral and cased the well with 5 1/2" to 20,326' and cemented the well bore off at that point. All equipment on site looked ok and the Rig had skidded over to the Stewart Central 10H at the time of this inspection. |
| 2572463 | Primary Facility | 2017-03-16 | Routine/Complete Inspection | No Violations Noted | At the time of inspection drilling related activity ongoing. All materials and equipment on secondary containment. Site and access road stable with no E&S issues. |
| 2588072 | Primary Facility | 2017-04-27 | Drilling/Alteration | No Violations Noted | Frac team setting up on site and running iron @ time of inspection. All equipment spotted on site at this time looked ok. Site manager had proper paperwork. |
| 2589493 | Primary Facility | 2017-05-01 | Drilling/Alteration | No Violations Noted | Frac crew plugging and perfing stage 6 at time of inspection. 77 stages in 150' intervals are planned for this stimulation. All equipment on site looked ok. |
| 2590345 | Primary Facility | 2017-05-04 | Drilling/Alteration | No Violations Noted | Frac crew getting ready to frac stage 10 of the 78 stages planned at intervals of every 150' (stages planned was increased from 77 to 78) at the time of my inspection. All equipment on site looked ok. |
| 2591456 | Primary Facility | 2017-05-08 | Drilling/Alteration | No Violations Noted | Frac crew had perfed and was getting ready to frac stage 28 of this planned 78 stage frac at the time of this inspection. All equipment on site looked ok. |
| 2592627 | Primary Facility | 2017-05-10 | Drilling/Alteration | No Violations Noted | Frac team had just finished fracking stage 39 of this planned 78 stage frac. The well frac tree, all iron and equipment on site looked ok. |
| 2594487 | Primary Facility | 2017-04-28 | Routine/Complete Inspection | No Violations Noted | Apex setting up for frac of H-8 well. Wireline was completed. Sand was being delivered and injection pumps were set on 4/27/17. Apex looking to start on 4/29/17. |
| 2594489 | Primary Facility | 2017-04-28 | Routine/Complete Inspection | No Violations Noted | Apex setting up for frac of H-8 well. Wireline was completed. Sand was being delivered and injection pumps were set on 4/27/17. Apex looking to start on 4/29/17. |
| 2595482 | Primary Facility | 2017-05-15 | Drilling/Alteration | No Violations Noted | Wirelining and getting ready to frac stage 59 of planned 78 stages at time of inspection. All equipment on site looked ok. |
| 2595547 | Primary Facility | 2017-05-18 | Drilling/Alteration | No Violations Noted | Frac crew was running wireline preparing to frac stage 70 of this scheduled 78 stage frac. All equipment on site looked ok and the road had just been treated for dust mitigation. |
| 2596695 | Primary Facility | 2017-05-23 | Routine/Partial Inspection | No Violations Noted | WQS Higgins responded to the report of a small spill on the access road to the Stewart Central Pad during the well stimulation operations for 129-28903 Stewart Central Pad 21 8H. An off-road diesel refueling truck had a small discharge of approximately 1 1/2 gallons of off-road diesel fuel to the access road. A spill of this size does not meet the spill reporting threshold set forth in Chapter 78a.66. At this time there is no further action necessary on the part of the operator in relation to this small spill. |
| 2602372 | Primary Facility | 2017-06-07 | Drilling/Alteration | No Violations Noted | Conducted dual inspection with John Ryder. All frac plugs had just been drilled out and operator was pulling pipe out of hole getting ready to bring well on to production at time of this inspection. All equipment on site looked ok. |
| 2604686 | Primary Facility | 2017-06-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears to be drilled. Department records indicate well has been fraced.
All BMPs and E&S controls in place in accordance with permit. No E&S issues. |
| 2617893 | Primary Facility | 2017-07-13 | Routine/Complete Inspection | No Violations Noted | At time of inspection 2 rolloff boxes located on matting boards and in secondary containment on well pad. The secondary containment appears structurally sound. Four tanks installed on matting boards located on eastern side of well pad. Two rolloff boxes for residual waste located on site. Well head surrounded by cement barriers. According to Department records well was frac'ed in April 2017 and at this time appears equipped for production. Contractors actively working near brine tanks. |
| 2724140 | Primary Facility | 2018-04-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. No E&S issues. |
| 2729584 | Primary Facility | 2018-05-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection no rig on site. Well appears equipped for production. Materials and equipment located on secondary containment. At the time of inspection Department observed the additional secondary containment structures around the the two fuel tanks onsite filled with rain water. The two fuel tanks are located directly north and west of pad. Department recommends Operator empty the containment. No E&S issues. |
For data sources see[7]