If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28903 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.394911,"lon":-79.592467,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Salem Township | |
Operator Name: APEX ENERGY (PA) LLC | |
Well Pad ID: 152567 | |
Farm/Lease Name: STEWART CENTRAL PAD-21 | |
License Status: Active | |
Spud Date: 2016-11-24 | |
Permit Date: 2015-06-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.394911 | |
Longitude: -79.592467 |
Date | Event |
---|---|
2015-06-08 | New Permit Application |
2016-07-05 | Permit Renewal Application |
2016-07-12 | Performed Spud Operation |
2016-12-21 | Drilling Completion |
2017-04-30 | Perforation |
2017-04-30 | Performed Stage 1 of Stimulation |
2017-05-01 | Perforation |
2017-05-01 | Performed Stage 2 of Stimulation |
2017-05-01 | Performed Stage 3 of Stimulation |
2017-05-01 | Performed Stage 4 of Stimulation |
2017-05-02 | Perforation |
2017-05-02 | Performed Stage 5 of Stimulation |
2017-05-04 | Perforation |
2017-05-04 | Performed Stage 6 of Stimulation |
2017-05-04 | Performed Stage 7 of Stimulation |
2017-05-04 | Performed Stage 8 of Stimulation |
2017-05-04 | Performed Stage 9 of Stimulation |
2017-05-05 | Perforation |
2017-05-05 | Performed Stage 10 of Stimulation |
2017-05-05 | Performed Stage 11 of Stimulation |
2017-05-05 | Performed Stage 12 of Stimulation |
2017-05-05 | Performed Stage 13 of Stimulation |
2017-05-06 | Perforation |
2017-05-06 | Performed Stage 14 of Stimulation |
2017-05-06 | Performed Stage 15 of Stimulation |
2017-05-06 | Performed Stage 16 of Stimulation |
2017-05-06 | Performed Stage 17 of Stimulation |
2017-05-06 | Performed Stage 18 of Stimulation |
2017-05-06 | Performed Stage 19 of Stimulation |
2017-05-07 | Perforation |
2017-05-07 | Performed Stage 20 of Stimulation |
2017-05-07 | Performed Stage 21 of Stimulation |
2017-05-07 | Performed Stage 22 of Stimulation |
2017-05-07 | Performed Stage 23 of Stimulation |
2017-05-07 | Performed Stage 24 of Stimulation |
2017-05-07 | Performed Stage 25 of Stimulation |
2017-05-08 | Perforation |
2017-05-08 | Performed Stage 26 of Stimulation |
2017-05-09 | Perforation |
2017-05-09 | Performed Stage 27 of Stimulation |
2017-05-09 | Performed Stage 28 of Stimulation |
2017-05-09 | Performed Stage 29 of Stimulation |
2017-05-09 | Performed Stage 30 of Stimulation |
2017-05-09 | Performed Stage 31 of Stimulation |
2017-05-10 | Perforation |
2017-05-10 | Performed Stage 32 of Stimulation |
2017-05-10 | Performed Stage 33 of Stimulation |
2017-05-10 | Performed Stage 34 of Stimulation |
2017-05-10 | Performed Stage 35 of Stimulation |
2017-05-10 | Performed Stage 36 of Stimulation |
2017-05-10 | Performed Stage 37 of Stimulation |
2017-05-11 | Perforation |
2017-05-11 | Performed Stage 38 of Stimulation |
2017-05-11 | Performed Stage 39 of Stimulation |
2017-05-11 | Performed Stage 40 of Stimulation |
2017-05-11 | Performed Stage 41 of Stimulation |
2017-05-11 | Performed Stage 42 of Stimulation |
2017-05-11 | Performed Stage 43 of Stimulation |
2017-05-13 | Perforation |
2017-05-13 | Performed Stage 44 of Stimulation |
2017-05-13 | Performed Stage 45 of Stimulation |
2017-05-13 | Performed Stage 46 of Stimulation |
2017-05-13 | Performed Stage 47 of Stimulation |
2017-05-14 | Perforation |
2017-05-14 | Performed Stage 48 of Stimulation |
2017-05-14 | Performed Stage 49 of Stimulation |
2017-05-14 | Performed Stage 50 of Stimulation |
2017-05-14 | Performed Stage 51 of Stimulation |
2017-05-14 | Performed Stage 52 of Stimulation |
2017-05-15 | Perforation |
2017-05-15 | Performed Stage 53 of Stimulation |
2017-05-15 | Performed Stage 54 of Stimulation |
2017-05-15 | Performed Stage 55 of Stimulation |
2017-05-15 | Performed Stage 56 of Stimulation |
2017-05-15 | Performed Stage 57 of Stimulation |
2017-05-16 | Perforation |
2017-05-16 | Performed Stage 58 of Stimulation |
2017-05-16 | Performed Stage 59 of Stimulation |
2017-05-16 | Performed Stage 60 of Stimulation |
2017-05-16 | Performed Stage 61 of Stimulation |
2017-05-16 | Performed Stage 62 of Stimulation |
2017-05-17 | Perforation |
2017-05-17 | Performed Stage 63 of Stimulation |
2017-05-18 | Perforation |
2017-05-18 | Performed Stage 64 of Stimulation |
2017-05-18 | Performed Stage 65 of Stimulation |
2017-05-18 | Performed Stage 66 of Stimulation |
2017-05-18 | Performed Stage 67 of Stimulation |
2017-05-19 | Perforation |
2017-05-19 | Performed Stage 68 of Stimulation |
2017-05-19 | Performed Stage 69 of Stimulation |
2017-05-19 | Performed Stage 70 of Stimulation |
2017-05-19 | Performed Stage 71 of Stimulation |
2017-05-19 | Performed Stage 72 of Stimulation |
2017-05-19 | Performed Stage 73 of Stimulation |
2017-05-20 | Perforation |
2017-05-20 | Performed Stage 74 of Stimulation |
2017-05-20 | Performed Stage 75 of Stimulation |
2017-05-20 | Performed Stage 76 of Stimulation |
2017-05-20 | Performed Stage 77 of Stimulation |
2017-05-20 | Performed Stage 78 of Stimulation |
2019-05-19 | Perforation |
2019-12-03 | Deviated |
2019-12-03 | Newly Drilled |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-04-30 | 2017-05-20 | 7,511 | 21,102,700 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | NEFE-180 | Producers Service Corp | Corrosion Inhibitor/Iron Control | 2-Ethylhexanol | 104-76-7 | 10 | 0.000291516 | 608.05 |
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.000145758 | 304.025 | ||||
Fatty Acids, tall oil | 61790-12-3 | 5 | 0.000145758 | 304.025 | ||||
2-Propyn-1-ol | 107-19-7 | 5 | 0.000145758 | 304.025 | ||||
Acetic Acid | 64-19-7 | 65 | 0.00189485 | 3952.33 | ||||
Methanol | 67-56-1 | 35 | 0.00102031 | 2128.18 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.000145758 | 304.025 | ||||
SI-1171 | Producers Service Corp | Scale Inhibitor | DETA phosphonate | 15827-60-8 | 3 | 0.000421741 | 879.677 | |
Phosphino Carboxylic Acid Polymer | 71050-62-9 | 3 | 0.000421741 | 879.677 | ||||
Hexamethylene Triamine Penta | 34690-00-1 | 3 | 0.000421741 | 879.677 | ||||
Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 10 | 0.0014058 | 2932.26 | ||||
STIMLUBE F | Producers Service Corp | Friction Reducer | Petroleum Distallates | 64742-47-8 | 30 | 0.040216 | 83883.4 | |
Alcohols, ethoxylated | 68002-97-1 | 3.1 | 0.00415565 | 8667.95 | ||||
Alcohols, ethoxylated | 68439-50-9 | 3.1 | 0.00415565 | 8667.95 | ||||
Alcohols, ethoxylated | 68551-12-2 | 3.1 | 0.00415565 | 8667.95 | ||||
Water | Company 1 | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 84.4283 | 176,102,000.0 | |
15% HCL | Producers Service Corp | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.079487 | 165796 | |
Sand (Proppant) | Producers Service Corp | Proppant | Silica Substrate | 14808-60-7 | 100 | 14.8908 | 31,059,500.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2017-04-30 | 1 | Sand | 22,171,590 | 9,342 | 6,078 |
2017-05-01 | 2 | Sand | 22,171,590 | 9,426 | 8,162 |
2017-05-01 | 3 | Sand | 22,171,590 | 9,714 | 9,157 |
2017-05-01 | 4 | Sand | 22,171,590 | 9,665 | 6,440 |
2017-05-02 | 5 | Sand | 22,171,590 | 9,626 | 7,073 |
2017-05-04 | 6 | Sand | 22,171,590 | 9,879 | 7,919 |
2017-05-04 | 7 | Sand | 22,171,590 | 9,598 | 6,898 |
2017-05-04 | 8 | Sand | 22,171,590 | 9,293 | 0 |
2017-05-04 | 9 | Sand | 22,171,590 | 9,426 | 6,154 |
2017-05-05 | 10 | Sand | 22,171,590 | 9,591 | 6,995 |
2017-05-05 | 11 | Sand | 22,171,590 | 9,568 | 6,647 |
2017-05-05 | 12 | Sand | 22,171,590 | 9,623 | 6,909 |
2017-05-05 | 13 | Sand | 22,171,590 | 9,616 | 6,701 |
2017-05-06 | 14 | Sand | 22,171,590 | 9,469 | 7,221 |
2017-05-06 | 15 | Sand | 22,171,590 | 9,267 | 6,524 |
2017-05-06 | 16 | Sand | 22,171,590 | 9,429 | 5,889 |
2017-05-06 | 17 | Sand | 22,171,590 | 9,389 | 6,095 |
2017-05-06 | 18 | Sand | 22,171,590 | 9,655 | 6,609 |
2017-05-06 | 19 | Sand | 22,171,590 | 9,224 | 6,317 |
2017-05-07 | 20 | Sand | 22,171,590 | 9,262 | 7,085 |
2017-05-07 | 21 | Sand | 22,171,590 | 9,261 | 5,940 |
2017-05-07 | 22 | Sand | 22,171,590 | 9,378 | 5,846 |
2017-05-07 | 23 | Sand | 22,171,590 | 9,353 | 5,905 |
2017-05-07 | 24 | Sand | 22,171,590 | 9,550 | 5,778 |
2017-05-07 | 25 | Sand | 22,171,590 | 6,372 | 6,372 |
2017-05-08 | 26 | Sand | 22,171,590 | 9,257 | 6,118 |
2017-05-09 | 27 | Sand | 22,171,590 | 8,985 | 6,332 |
2017-05-09 | 28 | Sand | 22,171,590 | 8,799 | 6,011 |
2017-05-09 | 29 | Sand | 22,171,590 | 8,987 | 7,232 |
2017-05-09 | 30 | Sand | 22,171,590 | 9,029 | 6,655 |
2017-05-09 | 31 | Sand | 22,171,590 | 9,096 | 6,715 |
2017-05-10 | 32 | Sand | 22,171,590 | 8,971 | 6,662 |
2017-05-10 | 33 | Sand | 22,171,590 | 8,978 | 6,920 |
2017-05-10 | 34 | Sand | 22,171,590 | 8,943 | 6,842 |
2017-05-10 | 35 | Sand | 22,171,590 | 8,987 | 6,326 |
2017-05-10 | 36 | Sand | 22,171,590 | 9,048 | 6,050 |
2017-05-10 | 37 | Sand | 22,171,590 | 9,076 | 6,229 |
2017-05-11 | 38 | Sand | 22,171,590 | 9,066 | 6,861 |
2017-05-11 | 39 | Sand | 22,171,590 | 9,026 | 6,651 |
2017-05-11 | 40 | Sand | 22,171,590 | 9,366 | 6,531 |
2017-05-11 | 41 | Sand | 22,171,590 | 8,846 | 6,287 |
2017-05-11 | 42 | Sand | 22,171,590 | 8,817 | 6,194 |
2017-05-11 | 43 | Sand | 22,171,590 | 8,746 | 6,691 |
2017-05-13 | 44 | Sand | 22,171,590 | 8,722 | 6,820 |
2017-05-13 | 45 | Sand | 22,171,590 | 8,646 | 0 |
2017-05-13 | 46 | Sand | 22,171,590 | 9,108 | 7,412 |
2017-05-13 | 47 | Sand | 22,171,590 | 8,659 | 6,478 |
2017-05-14 | 48 | Sand | 22,171,590 | 8,539 | 6,542 |
2017-05-14 | 49 | Sand | 22,171,590 | 8,709 | 6,688 |
2017-05-14 | 50 | Sand | 22,171,590 | 8,629 | 7,025 |
2017-05-14 | 51 | Sand | 22,171,590 | 8,611 | 6,597 |
2017-05-14 | 52 | Sand | 22,171,590 | 8,552 | 7,326 |
2017-05-15 | 53 | Sand | 22,171,590 | 8,953 | 7,431 |
2017-05-15 | 54 | Sand | 22,171,590 | 8,597 | 6,455 |
2017-05-15 | 55 | Sand | 22,171,590 | 8,593 | 6,641 |
2017-05-15 | 56 | Sand | 22,171,590 | 8,530 | 7,173 |
2017-05-15 | 57 | Sand | 22,171,590 | 8,653 | 7,392 |
2017-05-16 | 58 | Sand | 22,171,590 | 8,566 | 7,072 |
2017-05-16 | 59 | Sand | 22,171,590 | 8,578 | 7,387 |
2017-05-16 | 60 | Sand | 22,171,590 | 8,499 | 6,959 |
2017-05-16 | 61 | Sand | 22,171,590 | 8,385 | 6,714 |
2017-05-16 | 62 | Sand | 22,171,590 | 8,592 | 6,425 |
2017-05-17 | 63 | Sand | 22,171,590 | 8,257 | 6,660 |
2017-05-18 | 64 | Sand | 22,171,590 | 8,078 | 7,425 |
2017-05-18 | 65 | Sand | 22,171,590 | 8,060 | 6,053 |
2017-05-18 | 66 | Sand | 22,171,590 | 7,977 | 6,340 |
2017-05-18 | 67 | Sand | 22,171,590 | 7,980 | 5,546 |
2017-05-19 | 68 | Sand | 22,171,590 | 8,547 | 6,144 |
2017-05-19 | 69 | Sand | 22,171,590 | 8,170 | 0 |
2017-05-19 | 70 | Sand | 22,171,590 | 8,464 | 6,844 |
2017-05-19 | 71 | Sand | 22,171,590 | 8,236 | 6,420 |
2017-05-19 | 72 | Sand | 22,171,590 | 7,873 | 6,721 |
2017-05-19 | 73 | Sand | 22,171,590 | 8,001 | 6,560 |
2017-05-20 | 74 | Sand | 22,171,590 | 8,023 | 6,636 |
2017-05-20 | 75 | Sand | 22,171,590 | 7,953 | 6,623 |
2017-05-20 | 76 | Sand | 22,171,590 | 8,345 | 7,024 |
2017-05-20 | 77 | Sand | 22,171,590 | 8,714 | 7,342 |
2017-05-20 | 78 | Sand | 22,171,590 | 8,217 | 7,222 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | APEX ENERGY (PA) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | APEX ENERGY (PA) LLC | 1,841,458.00 | 190 | 0.00 | 0 | 0.00 | 0 |
2018 | APEX ENERGY (PA) LLC | 1,730,238.00 | 297 | 0.00 | 0 | 0.00 | 0 |
2019 | APEX ENERGY (PA) LLC | 1,323,132.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | APEX ENERGY (PA) LLC | Drill Cuttings | 1,733.20 Tons | LANDFILL | 100280 |
2016 | APEX ENERGY (PA) LLC | Other Oil & Gas Wastes | 45.53 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 2014-181 |
2016 | APEX ENERGY (PA) LLC | Drilling Fluid Waste | 861.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | APEX ENERGY (PA) LLC | Drill Cuttings | 281.77 Tons | LANDFILL | 100594 |
2016 | APEX ENERGY (PA) LLC | Other Oil & Gas Wastes | 282.26 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2016 | APEX ENERGY (PA) LLC | Other Oil & Gas Wastes | 282.26 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2017 | APEX ENERGY (PA) LLC | Produced Fluid | 1,250.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | APEX ENERGY (PA) LLC | Produced Fluid | 19,481.93 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2017 | APEX ENERGY (PA) LLC | Other Oil & Gas Wastes | 70.65 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 2014-181 |
2017 | APEX ENERGY (PA) LLC | Drill Cuttings | 26.96 Tons | LANDFILL | 100280 |
2017 | APEX ENERGY (PA) LLC | Other Oil & Gas Wastes | 84.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | APEX ENERGY (PA) LLC | Other Oil & Gas Wastes | 42.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2017 | APEX ENERGY (PA) LLC | Produced Fluid | 442.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | APEX ENERGY (PA) LLC | Other Oil & Gas Wastes | 5.69 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 2014-181 |
2018 | APEX ENERGY (PA) LLC | Produced Fluid | 3,464.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | APEX ENERGY (PA) LLC | Other Oil & Gas Wastes | 195.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | APEX ENERGY (PA) LLC | Produced Fluid | 1,746.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | APEX ENERGY (PA) LLC | Other Oil & Gas Wastes | 151.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | APEX ENERGY (PA) LLC | Produced Fluid | 9,994.02 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | APEX ENERGY (PA) LLC | Produced Fluid | 165.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW031 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2406540 | Primary Facility | 2015-09-08 | Routine/Partial Inspection | No Violations Noted | See inspection # 2406537 for observations made during the 9/8/2015 inspection. |
2407226 | Primary Facility | 2015-09-15 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well site was constructed and perimeter BMPs appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. |
2429849 | Primary Facility | 2015-12-03 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well site was constructed and perimeter BMPs appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. |
2501187 | Primary Facility | 2016-07-13 | Drilling/Alteration | No Violations Noted | The Lightning conductor Rig had drilled the conductor bore hole to a depth of 50', set pipe on bottom and was planning on cementing to surface with 4 yards of readi mix. All on site equipment looked ok. |
2507318 | Primary Facility | 2016-07-27 | Drilling/Alteration | No Violations Noted | Yost 6 Rigging up @ time of inspection. Site equipment looked ok. Attended pre-spud drilling meeting on site. |
2508128 | Primary Facility | 2016-07-28 | Drilling/Alteration | No Violations Noted | Rig drilled to 300'- ran 285' of 18 5/8" casing-pumped cement with returns. Cement dropped back to 20'-pumped 6.5 bbl pill-waiting on cement to set @ time of inspection. |
2508129 | Primary Facility | 2016-07-29 | Drilling/Alteration | No Violations Noted | Rig Site Supervisor reported good cement job on 18 5/8" casing-passed pressure test. Rig resumed drilling @ 300'. All equipment on site looked ok. |
2508140 | Primary Facility | 2016-08-02 | Drilling/Alteration | No Violations Noted | The Rig was drilling @ 2175' at the time of this inspection. BOP test chart-all equipment on site looked ok. Rig encountered 5" stream of water @ 2150' and was able to properly contain it. |
2510109 | Primary Facility | 2016-08-09 | Drilling/Alteration | No Violations Noted | Rig ran 2896' of 9 5/8" on 8/8/16-cemented w 1116 sks cement-40 bbl return. Drilling @ 2911' @ time of inspection. All equipment on site looked ok. |
2511471 | Primary Facility | 2016-08-12 | Drilling/Alteration | No Violations Noted | The Rig was shut down @ 8280' following repairs at the time of this inspection. They were getting ready to gyrolog the hole. All equipment on site looked ok. |
2541917 | Primary Facility | 2016-12-02 | Drilling/Alteration | No Violations Noted | Orion Rig 17 drilling @ 14,810' in the lateral at the time of this inspection. Daily on site drilling info-BOB test sheets present and ok. Rig and all equipment on site looked ok. |
2545519 | Primary Facility | 2016-12-15 | Drilling/Alteration | No Violations Noted | Well drilled to 23,205'. The DHA (down hole assembly) parted and was setting at 21,278' and a fishing crew was on site attempting to fish the DHA out at the time of this inspection. All equipment on site looked ok. |
2545558 | Primary Facility | 2016-12-19 | Drilling/Alteration | No Violations Noted | The fishing crew was unsuccessful at fishing the DHA (down hole assembly) out of the lateral and cased the well with 5 1/2" to 20,326' and cemented the well bore off at that point. All equipment on site looked ok and the Rig had skidded over to the Stewart Central 10H at the time of this inspection. |
2572463 | Primary Facility | 2017-03-16 | Routine/Complete Inspection | No Violations Noted | At the time of inspection drilling related activity ongoing. All materials and equipment on secondary containment. Site and access road stable with no E&S issues. |
2588072 | Primary Facility | 2017-04-27 | Drilling/Alteration | No Violations Noted | Frac team setting up on site and running iron @ time of inspection. All equipment spotted on site at this time looked ok. Site manager had proper paperwork. |
2589493 | Primary Facility | 2017-05-01 | Drilling/Alteration | No Violations Noted | Frac crew plugging and perfing stage 6 at time of inspection. 77 stages in 150' intervals are planned for this stimulation. All equipment on site looked ok. |
2590345 | Primary Facility | 2017-05-04 | Drilling/Alteration | No Violations Noted | Frac crew getting ready to frac stage 10 of the 78 stages planned at intervals of every 150' (stages planned was increased from 77 to 78) at the time of my inspection. All equipment on site looked ok. |
2591456 | Primary Facility | 2017-05-08 | Drilling/Alteration | No Violations Noted | Frac crew had perfed and was getting ready to frac stage 28 of this planned 78 stage frac at the time of this inspection. All equipment on site looked ok. |
2592627 | Primary Facility | 2017-05-10 | Drilling/Alteration | No Violations Noted | Frac team had just finished fracking stage 39 of this planned 78 stage frac. The well frac tree, all iron and equipment on site looked ok. |
2594487 | Primary Facility | 2017-04-28 | Routine/Complete Inspection | No Violations Noted | Apex setting up for frac of H-8 well. Wireline was completed. Sand was being delivered and injection pumps were set on 4/27/17. Apex looking to start on 4/29/17. |
2594489 | Primary Facility | 2017-04-28 | Routine/Complete Inspection | No Violations Noted | Apex setting up for frac of H-8 well. Wireline was completed. Sand was being delivered and injection pumps were set on 4/27/17. Apex looking to start on 4/29/17. |
2595482 | Primary Facility | 2017-05-15 | Drilling/Alteration | No Violations Noted | Wirelining and getting ready to frac stage 59 of planned 78 stages at time of inspection. All equipment on site looked ok. |
2595547 | Primary Facility | 2017-05-18 | Drilling/Alteration | No Violations Noted | Frac crew was running wireline preparing to frac stage 70 of this scheduled 78 stage frac. All equipment on site looked ok and the road had just been treated for dust mitigation. |
2596695 | Primary Facility | 2017-05-23 | Routine/Partial Inspection | No Violations Noted | WQS Higgins responded to the report of a small spill on the access road to the Stewart Central Pad during the well stimulation operations for 129-28903 Stewart Central Pad 21 8H. An off-road diesel refueling truck had a small discharge of approximately 1 1/2 gallons of off-road diesel fuel to the access road. A spill of this size does not meet the spill reporting threshold set forth in Chapter 78a.66. At this time there is no further action necessary on the part of the operator in relation to this small spill. |
2602372 | Primary Facility | 2017-06-07 | Drilling/Alteration | No Violations Noted | Conducted dual inspection with John Ryder. All frac plugs had just been drilled out and operator was pulling pipe out of hole getting ready to bring well on to production at time of this inspection. All equipment on site looked ok. |
2604686 | Primary Facility | 2017-06-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears to be drilled. Department records indicate well has been fraced.
All BMPs and E&S controls in place in accordance with permit. No E&S issues. |
2617893 | Primary Facility | 2017-07-13 | Routine/Complete Inspection | No Violations Noted | At time of inspection 2 rolloff boxes located on matting boards and in secondary containment on well pad. The secondary containment appears structurally sound. Four tanks installed on matting boards located on eastern side of well pad. Two rolloff boxes for residual waste located on site. Well head surrounded by cement barriers. According to Department records well was frac'ed in April 2017 and at this time appears equipped for production. Contractors actively working near brine tanks. |
2724140 | Primary Facility | 2018-04-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. No E&S issues. |
2729584 | Primary Facility | 2018-05-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection no rig on site. Well appears equipped for production. Materials and equipment located on secondary containment. At the time of inspection Department observed the additional secondary containment structures around the the two fuel tanks onsite filled with rain water. The two fuel tanks are located directly north and west of pad. Department recommends Operator empty the containment. No E&S issues. |
For data sources see[9]