X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-23644"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-23644
 
| Well ID: 37-085-23644
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.390848, -80.361168 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.390848, -80.361168 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 01/29/2005
+
| Spud Date: 2005-01-29
 
|-
 
|-
| Permit Date: 8/27/2004
+
| Permit Date: 2004-08-27
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 67: Line 92:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 76: Line 101:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 85: Line 110:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 94: Line 119:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 103: Line 128:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 112: Line 137:
 
| style="text-align: right;" | 146
 
| style="text-align: right;" | 146
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 128: Line 153:
 
| style="text-align: right;" | 27
 
| style="text-align: right;" | 27
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 147: Line 172:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2008-0
+
| 2008-A00
 
| Brine
 
| Brine
 
| style="text-align: right;" | 261.00 Bbl
 
| style="text-align: right;" | 261.00 Bbl
Line 153: Line 178:
 
|  
 
|  
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 148.00 Bbl
 
| style="text-align: right;" | 148.00 Bbl
Line 159: Line 184:
 
| 34-007-22038
 
| 34-007-22038
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 34.00 Bbl
 
| style="text-align: right;" | 34.00 Bbl
Line 165: Line 190:
 
| 34-155-23584
 
| 34-155-23584
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 108.00 Bbl
 
| style="text-align: right;" | 108.00 Bbl
Line 171: Line 196:
 
| 34-099-23127
 
| 34-099-23127
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 73.00 Bbl
 
| style="text-align: right;" | 73.00 Bbl
Line 177: Line 202:
 
| 34-155-23584
 
| 34-155-23584
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 33.00 Bbl
 
| style="text-align: right;" | 33.00 Bbl
Line 183: Line 208:
 
| 3192
 
| 3192
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 35.00 Bbl
 
| style="text-align: right;" | 35.00 Bbl
Line 189: Line 214:
 
| 34-007-20919
 
| 34-007-20919
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 195: Line 220:
 
| 34-155-22403
 
| 34-155-22403
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 155.00 Bbl
 
| style="text-align: right;" | 155.00 Bbl
Line 201: Line 226:
 
| 34-007-20919
 
| 34-007-20919
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 66.00 Bbl
 
| style="text-align: right;" | 66.00 Bbl
Line 226: Line 251:
 
| 1417915
 
| 1417915
 
| Primary Facility
 
| Primary Facility
| 02/10/2005
+
| 2005-02-10
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 233: Line 258:
 
| 1424788
 
| 1424788
 
| Primary Facility
 
| Primary Facility
| 03/01/2005
+
| 2005-03-01
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 240: Line 265:
 
| 1891683
 
| 1891683
 
| Primary Facility
 
| Primary Facility
| 06/14/2010
+
| 2010-06-14
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 247: Line 272:
 
| 1896759
 
| 1896759
 
| Primary Facility
 
| Primary Facility
| 06/17/2010
+
| 2010-06-17
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 254: Line 279:
 
| 2369972
 
| 2369972
 
| Primary Facility
 
| Primary Facility
| 05/14/2015
+
| 2015-05-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 261: Line 286:
 
| 2376774
 
| 2376774
 
| Primary Facility
 
| Primary Facility
| 06/04/2015
+
| 2015-06-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 268: Line 293:
 
| 2380724
 
| 2380724
 
| Primary Facility
 
| Primary Facility
| 06/16/2015
+
| 2015-06-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 275: Line 300:
 
| 2385793
 
| 2385793
 
| Primary Facility
 
| Primary Facility
| 07/01/2015
+
| 2015-07-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 282: Line 307:
 
| 2392510
 
| 2392510
 
| Primary Facility
 
| Primary Facility
| 07/24/2015
+
| 2015-07-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 289: Line 314:
 
| 2403466
 
| 2403466
 
| Primary Facility
 
| Primary Facility
| 08/31/2015
+
| 2015-08-31
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 330: Line 355:
 
| 722820
 
| 722820
 
| 05/14/2015
 
| 05/14/2015
|  
+
| 2015-05-14
 
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 387: Line 412:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 19:21, 1 August 2019

Well Details

Well ID: 37-085-23644
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Hempfield Township
Operator Name: BOBCAT WELL & PIPELINE LLC
Well Pad ID:
Farm/Lease Name: ADZIMA 1
License Status: Active
Spud Date: 2005-01-29
Permit Date: 2004-08-27
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.390848
Longitude: -80.361168

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 D & L ENERGY INC 7,218.00 366 258.00 366 0.00 0
2010 D & L ENERGY INC 4,298.50 365 109.82 365 0.00 0
2011 D & L ENERGY INC 3,187.30 365 115.10 365 0.00 0
2012 D & L ENERGY INC 2,679.40 365 75.21 365 0.00 0
2013 D & L ENERGY INC 3,358.64 365 174.26 365 0.00 0
2015 BOBCAT WELL & PIPELINE LLC 640.41 146 54.68 146 0.00 0
2016 0.00 0 0.00 0 0.00 0
2017 BOBCAT WELL & PIPELINE LLC 1,148.00 27 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2008-A00 Brine 261.00 Bbl
2010-A00 Produced Fluid (in Barrels) 148.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-22038
2010-A00 Produced Fluid (in Barrels) 34.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2011-A00 Produced Fluid (in Barrels) 108.00 Bbl INJECTION DISPOSAL WELL 34-099-23127
2011-A00 Produced Fluid (in Barrels) 73.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012-A00 Produced Fluid (in Barrels) 33.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2012-A00 Produced Fluid (in Barrels) 35.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2012-A00 Produced Fluid (in Barrels) 80.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2013-A00 Produced Fluid (in Barrels) 155.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2013-A00 Produced Fluid (in Barrels) 66.00 Bbl ROAD SPREADING

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1417915 Primary Facility 2005-02-10 Drilling/Alteration No Violations Noted
1424788 Primary Facility 2005-03-01 Administrative/File Review No Violations Noted well record review
1891683 Primary Facility 2010-06-14 Complaint Inspection No Violations Noted
1896759 Primary Facility 2010-06-17 Routine/Complete Inspection No Violations Noted
2369972 Primary Facility 2015-05-14 Routine/Complete Inspection Violation(s) Noted
2376774 Primary Facility 2015-06-04 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2380724 Primary Facility 2015-06-16 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2385793 Primary Facility 2015-07-01 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2392510 Primary Facility 2015-07-24 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2403466 Primary Facility 2015-08-31 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2599770 Primary Facility 2017-05-31 Routine/Complete Inspection Outstanding Violations - Viols Req'd 0915 hrs. Site same as previously noted. Wells are not in production. Shared tank battery has old leaky tank removed; still on site. Newer tank not installed. Soil removed. Water appears clear and fresh in puddle with aquatic life present. Outstanding violation from May 2015 still open; waiting on Act 2 cleanup by operator. No new violations.
2628391 Primary Facility 2017-08-23 Follow-up Inspection Outstanding Violations - Viols Req'd Follow up inspection. Combined tank battery for Adzima 1 (085-23644) and Adzima 2 (085-23707). Previously noted spill at tank battery with violation noted 5/14/15. Leaking tank caused spill of brine/oil to ground which seeped through (unlined) earthen dike Photo 1. Operator initially removed soil from site, but has not completed cleanup via Act 2/alternate process to analyze/clear remaining soil. Well is shut in at wellhead. Rabbit and well tag at wellhead. Tank battery has 1500 gal poly tank, 100 bbl green steel tank and two separator units. All tanks are empty. Old leaking tank (210 bbl) has been removed from dike but is laying next to dike. A replacement (red steel 100 bbl) tank is also laying outside of the dike, near the driveway. No production reported for well since 2015. Conservation work (food plots) being done at well pad clearing.
2670894 Primary Facility 2017-12-13 Follow-up Inspection Outstanding Violations - Viols Req'd Follow up inspection. Combined tank battery for Adzima 1 (085-23644) and Adzima 2 (085-23707). Previously noted spill at tank battery with violation noted 5/14/15. Leaking tank caused spill of brine/oil to ground which seeped through (unlined) earthen. Operator initially removed soil from site, but has not completed cleanup via Act 2/alternate process to analyze/clear remaining soil.

Both wells are back in production, with tanks and separator inside reconstructed earthen dike.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2369972 722820 05/14/2015 2015-05-14 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety
2599770 787752 2017-06-01 SWMA 301 Environmental Health & Safety Outstanding violation; no new violations
2628391 795178 2017-08-23 SWMA301 Environmental Health & Safety Cleanup has not been completed. Soil sampling (under Act 2/ alternate process) has not been completed.
2670894 804254 2017-12-14 SWMA301 Environmental Health & Safety Previous spill appears cleaned but needs completed through Act 2 process.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
722820 323521 NOV - Notice of Violation

For data sources see[6]

References