If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-085-23644 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.390848,"lon":-80.361168,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Mercer | |
Municipality: Hempfield Township | |
Operator Name: BOBCAT WELL & PIPELINE LLC | |
Well Pad ID: | |
Farm/Lease Name: ADZIMA 1 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2004-08-27 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.390848 | |
Longitude: -80.361168 |
Date | Event |
---|---|
2004-08-27 | New Permit Application |
2005-01-29 | Performed Spud Operation |
2005-02-04 | Drilling Completion |
2005-02-10 | Perforation |
2005-09-27 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | D & L ENERGY INC | 7218.00 | 366 | 258.00 | 366 | 0.00 | 0 |
2010 | D & L ENERGY INC | 4,298.50 | 365 | 109.82 | 365 | 0.00 | 0 |
2011 | D & L ENERGY INC | 3,187.30 | 365 | 115.10 | 365 | 0.00 | 0 |
2012 | D & L ENERGY INC | 2,679.40 | 365 | 75.21 | 365 | 0.00 | 0 |
2013 | D & L ENERGY INC | 3,358.64 | 365 | 174.26 | 365 | 0.00 | 0 |
2015 | BOBCAT WELL & PIPELINE LLC | 640.41 | 146 | 54.68 | 146 | 0.00 | 0 |
2016 | BOBCAT WELL & PIPELINE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | BOBCAT WELL & PIPELINE LLC | 1,148.00 | 27 | 0.00 | 0 | 0.00 | 0 |
2018 | BOBCAT WELL & PIPELINE LLC | 240.03 | 60 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | D & L ENERGY INC | Produced Fluid | 148.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-007-22038 |
2010 | D & L ENERGY INC | Produced Fluid | 34.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2011 | D & L ENERGY INC | Produced Fluid | 73.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2011 | D & L ENERGY INC | Produced Fluid | 108.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23127 |
2012 | D & L ENERGY INC | Produced Fluid | 35.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
2012 | D & L ENERGY INC | Produced Fluid | 33.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2012 | D & L ENERGY INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2013 | D & L ENERGY INC | Produced Fluid | 66.00 Bbl | ROAD SPREADING | |
2013 | D & L ENERGY INC | Produced Fluid | 155.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
2015 | BOBCAT WELL & PIPELINE LLC | Produced Fluid | 62.00 Bbl | ROAD SPREADING | |
2015 | BOBCAT WELL & PIPELINE LLC | Produced Fluid | 44.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1417915 | Primary Facility | 2005-02-10 | Drilling/Alteration | No Violations Noted | |
1424788 | Primary Facility | 2005-03-01 | Administrative/File Review | No Violations Noted | well record review |
1891683 | Primary Facility | 2010-06-14 | Complaint Inspection | No Violations Noted | |
1896759 | Primary Facility | 2010-06-17 | Routine/Complete Inspection | No Violations Noted | |
2369972 | Primary Facility | 2015-05-14 | Routine/Complete Inspection | Violation(s) Noted | |
2376774 | Primary Facility | 2015-06-04 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2380724 | Primary Facility | 2015-06-16 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2385793 | Primary Facility | 2015-07-01 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2392510 | Primary Facility | 2015-07-24 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2403466 | Primary Facility | 2015-08-31 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2599770 | Primary Facility | 2017-05-31 | Routine/Complete Inspection | Outstanding Violations - Viols Req'd | 0915 hrs. Site same as previously noted. Wells are not in production. Shared tank battery has old leaky tank removed; still on site. Newer tank not installed. Soil removed. Water appears clear and fresh in puddle with aquatic life present. Outstanding violation from May 2015 still open; waiting on Act 2 cleanup by operator. No new violations. |
2628391 | Primary Facility | 2017-08-23 | Follow-up Inspection | Outstanding Violations - Viols Req'd | Follow up inspection. Combined tank battery for Adzima 1 (085-23644) and Adzima 2 (085-23707). Previously noted spill at tank battery with violation noted 5/14/15. Leaking tank caused spill of brine/oil to ground which seeped through (unlined) earthen dike Photo 1. Operator initially removed soil from site, but has not completed cleanup via Act 2/alternate process to analyze/clear remaining soil. Well is shut in at wellhead. Rabbit and well tag at wellhead. Tank battery has 1500 gal poly tank, 100 bbl green steel tank and two separator units. All tanks are empty. Old leaking tank (210 bbl) has been removed from dike but is laying next to dike. A replacement (red steel 100 bbl) tank is also laying outside of the dike, near the driveway. No production reported for well since 2015. Conservation work (food plots) being done at well pad clearing. |
2670894 | Primary Facility | 2017-12-13 | Follow-up Inspection | Outstanding Violations - Viols Req'd | Follow up inspection. Combined tank battery for Adzima 1 (085-23644) and Adzima 2 (085-23707). Previously noted spill at tank battery with violation noted 5/14/15. Leaking tank caused spill of brine/oil to ground which seeped through (unlined) earthen. Operator initially removed soil from site, but has not completed cleanup via Act 2/alternate process to analyze/clear remaining soil.
Both wells are back in production, with tanks and separator inside reconstructed earthen dike. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2369972 | 722820 | 05/14/2015 | 2015-05-14 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | |
2599770 | 787752 | 2017-06-01 | SWMA 301 | Environmental Health & Safety | Outstanding violation; no new violations | |
2628391 | 795178 | 2017-08-23 | SWMA301 | Environmental Health & Safety | Cleanup has not been completed. Soil sampling (under Act 2/ alternate process) has not been completed. | |
2670894 | 804254 | 2017-12-14 | SWMA301 | Environmental Health & Safety | Previous spill appears cleaned but needs completed through Act 2 process. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
722820 | 323521 | NOV - Notice of Violation |
For data sources see[7]