X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-21694"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-21694
 
| Well ID: 37-081-21694
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.396639, -77.008056 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.396639, -77.008056 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 09/10/2018
+
| Spud Date: 2018-09-10
 
|-
 
|-
| Permit Date: 9/8/2017
+
| Permit Date: 2017-09-08
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 244: Line 269:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 01:01, 2 August 2019

Well Details

Well ID: 37-081-21694
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Gamble Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 154413
Farm/Lease Name: ROSE VALLEY 56H 51728
License Status: Active
Spud Date: 2018-09-10
Permit Date: 2017-09-08
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.396639
Longitude: -77.008056

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-M10 Drill Cuttings (in Tons) RWC 810 15.43 Tons LANDFILL 301358
2018-M12 Drill Cuttings (in Tons) RWC 810 29.05 Tons LANDFILL 301358
2018-M12 Produced Fluid (in Barrels) RWC 802 120.00 Bbl REUSE (AT WELL PAD)
2019-M01 Drill Cuttings (in Tons) RWC 810 0.88 Tons LANDFILL 301358
2019-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019-M01 Synthetic Liner Materials (in Tons) RWC 806 0.90 Tons LANDFILL 301358
2019-M02 Drill Cuttings (in Tons) RWC 810 110.39 Tons LANDFILL 301358
2019-M02 Drilling Fluid Waste (in Barrels) RWC 803 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 154.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-M03 Drill Cuttings (in Tons) RWC 810 61.78 Tons LANDFILL 301358
2019-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 242.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-M03 Synthetic Liner Materials (in Tons) RWC 806 0.90 Tons LANDFILL 301358

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2754782 Primary Facility 2018-07-13 Routine/Complete Inspection No Violations Noted Routine Inspection; 7/13/2018.

After entering the site we talked to Tom Umstead (Hawbaker) who was managing the site. We discussed the seeding and stabilization as well as the infiltration berm construction and stabilization. At the time of the inspection, the main cut/fill of the pad area was being constructed. A full spread of equipment was working and a water truck was applying water for dust suppression throughout the main work area and especially the haul truck path from the cut side down to the fill slope and back. Overall, the BMP's are being installed and applied properly. I appreciate the care used in installing the infiltration controls, stabilizing progressively (as the project continues), and the active use of dust control measures. Overall, the site is in good condition. No violations noted.

2763014 Primary Facility 2018-08-09 Preoperation Inspection No Violations Noted Pre-operational inspection; 8/9/2018.

I entered the site at 17:05 and talked to Tom Umstead (Hawbaker). Work was ongoing to establish the cut/fill and under-drain. The cut side was being drilled to be shot at the time of the inspection.

Recently, heavy rains far in excess of any design storm rate/volume have impacted the area and this site shows signs of some previous impacts. Sediment on perimeter E&S controls indicates that they have overtopped. An 8" HDPE pipe was used as a drain at one location where the silt sock overtopped to bypass the perimeter E&S controls. In addition, evidence suggest the northernmost bio-retention berm filled and breached as evidence by the volume of sediment behind the E&S controls. The E&S issues described above have been corrected onsite and the dead-end road immediately north and east of the fill slope (outside the LOD) has been recently rock-lined, and re-vegetated. They plan to hydro-seed exposed soils on the fill slope and on the bio-retention berms on 8/10/2018. No vi

2773829 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted Weather was 67° and raining at time of inspection. Met with Seneca representative Scott Barr on location. Conductor was set and cemented the previous day. Good returns to surface were noted. A welder was on location cutting off the top of the casing and installing an insert for the drilling rig to nipple up on. No violations were noted at time of inspection.
2839405 Primary Facility 2019-02-13 Routine/Complete Inspection No Violations Noted Weather was 48° and sunny at time of inspection. Met with Seneca representative Jason Bence. Well is a spud conductor. Well was covered with a top hole rig at time of inspection. Top ho,e rig was drilling the 52H. 0% combustible gas was detected anywhere around the well at time of inspection. No violations were noted at time of inspection.
2844710 Primary Facility 2019-02-26 Routine/Complete Inspection No Violations Noted Weather was 24 degrees and sunny at time of inspection. Met with Seneca representative Jason Bentz on location. Drilling has just started the 17.5' hole for the surface casing. Estimated TD is 620'. No violations noted at time of inspection.

For data sources see[6]

References