{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.396639,"lon":-77.008056,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Gamble Township | |
Operator Name: SENECA RESOURCES CO LLC | |
Well Pad ID: 154413 | |
Farm/Lease Name: ROSE VALLEY 56H 51728 | |
License Status: | |
Spud Date: 2018-09-10 | |
Permit Date: 2017-09-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.396639 | |
Longitude: -77.008056 |
Date | Event |
---|---|
Deviated | |
2017-09-08 | New Permit Application |
2018-08-29 | Permit Renewal Application |
2018-09-10 | Performed Spud Operation |
2019-06-05 | Drilling Completion |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | SENECA RESOURCES CO LLC | 1,375,681.74 | 129 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 120.00 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Drill Cuttings | 44.48 Tons | LANDFILL | 301358 |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 124.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 10,920.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 964.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 940.60 Bbl | REUSE (AT WELL PAD) | |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 382.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC038 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 71.00 Bbl | INJECTION DISPOSAL WELL | PAS2D025BELK |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 64.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Drilling Fluid Waste | 200.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 123.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 6,694.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | WMGR123NC039 |
2019 | SENECA RESOURCES CO LLC | Drill Cuttings | 1,175.74 Tons | LANDFILL | 301358 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 1,281.80 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | SENECA RESOURCES CO LLC | Waste Water Treatment Sludge | 36.52 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Synthetic Liner Materials | 13.44 Tons | LANDFILL | 301358 |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 66.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | WMGR123NC039 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 330.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC003 |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 1,018.60 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2754782 | Primary Facility | 2018-07-13 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 7/13/2018.
After entering the site we talked to Tom Umstead (Hawbaker) who was managing the site. We discussed the seeding and stabilization as well as the infiltration berm construction and stabilization. At the time of the inspection, the main cut/fill of the pad area was being constructed. A full spread of equipment was working and a water truck was applying water for dust suppression throughout the main work area and especially the haul truck path from the cut side down to the fill slope and back. Overall, the BMP's are being installed and applied properly. I appreciate the care used in installing the infiltration controls, stabilizing progressively (as the project continues), and the active use of dust control measures. Overall, the site is in good condition. No violations noted. |
2763014 | Primary Facility | 2018-08-09 | Preoperation Inspection | No Violations Noted | Pre-operational inspection; 8/9/2018.
I entered the site at 17:05 and talked to Tom Umstead (Hawbaker). Work was ongoing to establish the cut/fill and under-drain. The cut side was being drilled to be shot at the time of the inspection. Recently, heavy rains far in excess of any design storm rate/volume have impacted the area and this site shows signs of some previous impacts. Sediment on perimeter E&S controls indicates that they have overtopped. An 8" HDPE pipe was used as a drain at one location where the silt sock overtopped to bypass the perimeter E&S controls. In addition, evidence suggest the northernmost bio-retention berm filled and breached as evidence by the volume of sediment behind the E&S controls. The E&S issues described above have been corrected onsite and the dead-end road immediately north and east of the fill slope (outside the LOD) has been recently rock-lined, and re-vegetated. They plan to hydro-seed exposed soils on the fill slope and on the bio-retention berms on 8/10/2018. No vi |
2773829 | Primary Facility | 2018-09-12 | Routine/Complete Inspection | No Violations Noted | Weather was 67° and raining at time of inspection. Met with Seneca representative Scott Barr on location. Conductor was set and cemented the previous day. Good returns to surface were noted. A welder was on location cutting off the top of the casing and installing an insert for the drilling rig to nipple up on. No violations were noted at time of inspection. |
2839405 | Primary Facility | 2019-02-13 | Routine/Complete Inspection | No Violations Noted | Weather was 48° and sunny at time of inspection. Met with Seneca representative Jason Bence. Well is a spud conductor. Well was covered with a top hole rig at time of inspection. Top ho,e rig was drilling the 52H. 0% combustible gas was detected anywhere around the well at time of inspection. No violations were noted at time of inspection. |
2844710 | Primary Facility | 2019-02-26 | Routine/Complete Inspection | No Violations Noted | Weather was 24 degrees and sunny at time of inspection. Met with Seneca representative Jason Bentz on location. Drilling has just started the 17.5' hole for the surface casing. Estimated TD is 620'. No violations noted at time of inspection. |