X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-113-20273"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-113-20273
 
| Well ID: 37-113-20273
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.538908, -76.259239 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.538908, -76.259239 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 23: Line 23:
 
| Spud Date:  
 
| Spud Date:  
 
|-
 
|-
| Permit Date: 4/23/2014
+
| Permit Date: 2014-04-23
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
<!--== Production Data ==
 
<!--== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 84: Line 109:
 
| 2296530
 
| 2296530
 
| Primary Facility
 
| Primary Facility
| 07/30/2014
+
| 2014-07-30
 
| Preoperation Inspection
 
| Preoperation Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 154: Line 179:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 06:48, 2 August 2019

Well Details

Well ID: 37-113-20273
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Colley Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID:
Farm/Lease Name: CHAMPLIN NE SUL 2H
License Status:
Spud Date:
Permit Date: 2014-04-23
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.538908
Longitude: -76.259239

For data sources see[1][2][3]


Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2296530 Primary Facility 2014-07-30 Preoperation Inspection No Violations Noted
2446027 Primary Facility 2016-02-02 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess general site conditions. No Chesapeake representatives were present.

Temporary erosion and sediment control BMPs are in place and in good repair. Most of the site has >70% perennial vegetation, though there are some patches with less and several rocky areas. No evidence of accelerated erosion or sedimentation was observed.

No violations were cited during this inspection.

2542744 Primary Facility 2016-12-07 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess overall site conditions. No Chesapeake representatives were present.

Temporary erosion and sediment control BMPs are in place and in good repair. Vegetative cover over most of the site is greater than 70% perennial vegetation, though there are some patches with less and several rocky areas. No evidence of accelerated erosion or sedimentation was observed.

The post-construction stormwater management (PCSM) BMPs required by the Department's March 03, 2016 approval of an extension of time for site restoration have been installed. Temproary stabilization and erosion and sediment control BMPs have been installed in the areas affected by PCSM construction.

No violations were cited during this inspection.

2751203 Primary Facility 2018-07-12 Drilling/Alteration No Violations Noted Spud notification received on 7/12/2018 for the 6H and 23H wells.

Nomac Peakrig 71 already drilled 1H and 21H wells within the past month.

Neil Brown did a walk-around with the Department during this inspection. No violations noted.

For data sources see[4]

References