If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-117-20288 | | Well ID: 37-117-20288 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.698044, -76.965122 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Regulatory Inactive Status | | License Status: Regulatory Inactive Status | ||
|- | |- | ||
− | | Spud Date: 09 | + | | Spud Date: 2009-09-12 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2009-06-30 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 63: | Line 88: | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2010 | | 2010 | ||
Line 165: | Line 190: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Drilling Fluid Waste (in Barrels) | | Drilling Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 312.00 Bbl | | style="text-align: right;" | 312.00 Bbl | ||
Line 171: | Line 196: | ||
| WMGR123SW018 | | WMGR123SW018 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 110.00 Bbl | | style="text-align: right;" | 110.00 Bbl | ||
Line 177: | Line 202: | ||
| PA0102784 | | PA0102784 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 1,869.00 Bbl | | style="text-align: right;" | 1,869.00 Bbl | ||
Line 183: | Line 208: | ||
| WMGR123SW018 | | WMGR123SW018 | ||
|- | |- | ||
− | | 2011- | + | | 2011-S01 |
| Drill Cuttings (in Tons) | | Drill Cuttings (in Tons) | ||
| style="text-align: right;" | 54.00 Tons | | style="text-align: right;" | 54.00 Tons | ||
Line 189: | Line 214: | ||
| NY # 02S17 | | NY # 02S17 | ||
|- | |- | ||
− | | 2011- | + | | 2011-S01 |
| Drill Cuttings (in Tons) | | Drill Cuttings (in Tons) | ||
| style="text-align: right;" | 83.00 Tons | | style="text-align: right;" | 83.00 Tons | ||
Line 195: | Line 220: | ||
| NY31346244 | | NY31346244 | ||
|- | |- | ||
− | | 2011- | + | | 2011-S01 |
| Fracing Fluid Waste (in Barrels) | | Fracing Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 399.00 Bbl | | style="text-align: right;" | 399.00 Bbl | ||
Line 201: | Line 226: | ||
| WMGR123SW018 | | WMGR123SW018 | ||
|- | |- | ||
− | | 2011- | + | | 2011-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 356.99 Bbl | | style="text-align: right;" | 356.99 Bbl | ||
Line 207: | Line 232: | ||
| WMGR123 | | WMGR123 | ||
|- | |- | ||
− | | 2011- | + | | 2011-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 112.97 Bbl | | style="text-align: right;" | 112.97 Bbl | ||
Line 213: | Line 238: | ||
| WMGR123SW018 | | WMGR123SW018 | ||
|- | |- | ||
− | | 2011- | + | | 2011-S02 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 12.53 Bbl | | style="text-align: right;" | 12.53 Bbl | ||
Line 238: | Line 263: | ||
| 1823448 | | 1823448 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2009-08-25 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
Line 245: | Line 270: | ||
| 1852929 | | 1852929 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2009-12-28 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 252: | Line 277: | ||
| 1919364 | | 1919364 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2010-10-12 |
| Follow-up Inspection | | Follow-up Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 259: | Line 284: | ||
| 2378410 | | 2378410 | ||
| Primary Facility | | Primary Facility | ||
− | | 06 | + | | 2015-06-05 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 335: | Line 360: | ||
| 570104 | | 570104 | ||
| 08/25/2009 | | 08/25/2009 | ||
− | | | + | | 2009-08-25 |
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
| Environmental Health & Safety | | Environmental Health & Safety | ||
Line 343: | Line 368: | ||
| 570105 | | 570105 | ||
| 08/25/2009 | | 08/25/2009 | ||
− | | | + | | 2009-08-25 |
| 102.4INADPLN - E&S Plan not adequate | | 102.4INADPLN - E&S Plan not adequate | ||
| Administrative | | Administrative | ||
Line 365: | Line 390: | ||
| Comply/Closed | | Comply/Closed | ||
| | | | ||
− | | 10 | + | | 2010-10-12 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
Line 374: | Line 399: | ||
| Comply/Closed | | Comply/Closed | ||
| | | | ||
− | | 10 | + | | 2010-10-12 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
Line 385: | Line 410: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-117-20288 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.698044,"lon":-76.965122,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Ward Township | |
Operator Name: REPSOL OIL & GAS USA LLC | |
Well Pad ID: 148190 | |
Farm/Lease Name: DCNR 587 02 002 03 | |
License Status: Regulatory Inactive Status | |
Spud Date: 2009-09-12 | |
Permit Date: 2009-06-30 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.698044 | |
Longitude: -76.965122 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
2010 | REPSOL OIL & GAS USA LLC | 919,009.00 | 154 | 0.00 | 0 | 0.00 | 0 |
2011 | REPSOL OIL & GAS USA LLC | 1,354,422.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2012 | REPSOL OIL & GAS USA LLC | 50,899.00 | 21 | 0.00 | 0 | 0.00 | 0 |
2013 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2010-S02 | Drilling Fluid Waste (in Barrels) | 312.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2010-S02 | Produced Fluid (in Barrels) | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2010-S02 | Produced Fluid (in Barrels) | 1,869.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2011-S01 | Drill Cuttings (in Tons) | 54.00 Tons | LANDFILL | NY # 02S17 |
2011-S01 | Drill Cuttings (in Tons) | 83.00 Tons | LANDFILL | NY31346244 |
2011-S01 | Fracing Fluid Waste (in Barrels) | 399.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2011-S02 | Produced Fluid (in Barrels) | 356.99 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2011-S02 | Produced Fluid (in Barrels) | 112.97 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2011-S02 | Produced Fluid (in Barrels) | 12.53 Bbl | REUSE OTHER THAN ROAD SPREADING |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1823448 | Primary Facility | 2009-08-25 | Routine/Complete Inspection | Violation(s) Noted | Inspection report and 3rd page NOV sent 8/27/2009 to Eric Potter. Picture of Silt fence included. VIOLS 102.49(b) and 102.4(b)(5) 117-20317,117-202316, &117-20289 same well pad dulpicate inspections. 8/27/2009 MAB |
1852929 | Primary Facility | 2009-12-28 | Routine/Complete Inspection | No Violations Noted | |
1919364 | Primary Facility | 2010-10-12 | Follow-up Inspection | No Violations Noted | Follow-up inspection to correct August 25, 2009 violations |
2378410 | Primary Facility | 2015-06-05 | Routine/Complete Inspection | No Violations Noted | |
2464228 | Primary Facility | 2016-03-10 | Routine/Partial Inspection | No Violations Noted | 4 Marcellus Shale wells producing natural gas from this pad |
2596678 | Primary Facility | 2017-05-19 | Routine/Partial Inspection | No Violations Noted | An inspection was conducted of the DCNR 02–002 and compressor station site on May 19, 2017 from approximately 10 AM to approximately 11 AM. Repsol is reminded that weekly inspections are to be conducted until such time as the notice of termination has been approved for the erosion and sedimentation control general permit. No violations were cited during this inspection. The area of the compressor station was not inspected although the surrounding area appears to be stabilized |
2600315 | Primary Facility | 2017-06-02 | Administrative/File Review | No Violations Noted | And administrative inspection was completed to document the fact that in a previous inspection report, due to a typographical error in department records, it was incorrectly noted the erosion and sedimentation control general permit (ESCGP)h had expired. The ESCGP for this site actually expires on 10/9/2019. |
2605078 | Primary Facility | 2017-06-14 | Site Restoration | No Violations Noted | EC readings (mS/cm) w Oakton PCSTestr 35: separator containment--0.24, production tank containment--0.16, pad--0.33 |
2650640 | Primary Facility | 2017-10-23 | Routine/Complete Inspection | No Violations Noted | Well producing.
Cool/windy at time of inspection. One 2" annulus vent. |
2790048 | Primary Facility | 2018-10-10 | Routine/Partial Inspection | No Violations Noted | ~20' onto the pad from the access gate, gravel has dark staining, and a puddle has a cream color substance floating on it (photo 3). I used a MiniRAE 3000 Photo Ionization Detector (PID) and got readings of 3.0-6.0 ppm (photo 2) from above the stained area, indicating that volatile gas is present. Apparently, there is some residual hydraulic oil on the pad surface, which is a violation of SWMA 301.
I spoke with Ben Younkin & Kris Perritt (both Repsol) by telephone; they explained that a hydraulic oil release (~1 gallon) happened in the area that is stained, which Repsol reported on September 20, 2018. They planned to apply absorbents and cover the area with plastic tomorrow, then excavate to remove the affected pad material in 2 days (Friday October 12, 2018). I used an Oakton PCSTestr 35 to get readings from pooled liquid on site. A puddle on the pad surface near the production tanks returned a 0.35 mS/cm reading. Golder documented the excavation cleanup on Friday October 12, 2018 (email & photos atta |
2790562 | Primary Facility | 2018-10-17 | Follow-up Inspection | No Violations Noted | Repsol excavated to remove some of the pad surface that was stained by a reported hydraulic oil spill. I used a MiniRAE 3000 PID to check for volatile gases above the excavated area; it did not detect any.
I got a 0.13 mS/cm fro a water puddle near the center of the pad using an Oakton PCSTestr 35 today. JLP |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1823448 | 570104 | 08/25/2009 | 2009-08-25 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | silt fence maintainence and improper installation of diversion ditch and sediment traps |
1823448 | 570105 | 08/25/2009 | 2009-08-25 | 102.4INADPLN - E&S Plan not adequate | Administrative | E & S plan not reflective of site conditions |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
570104 | 249922 | NOV - Notice of Violation | Comply/Closed | 2010-10-12 | |||
570105 | 249922 | NOV - Notice of Violation | Comply/Closed | 2010-10-12 |
For data sources see[6]