X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-23169"

m
m
Line 11: Line 11:
 
| County: [[Summit_County,_Ohio|Summit]]
 
| County: [[Summit_County,_Ohio|Summit]]
 
|-
 
|-
| Municipality: [[Coventry_Township,_Summit_County,_Ohio|Coventry Township]]
+
| Municipality: [[Akron City,_Summit_County,_Ohio|Akron City]]
 
|-
 
|-
 
| Operator Name: [[CARGILL INC]]
 
| Operator Name: [[CARGILL INC]]

Revision as of 05:55, 14 August 2019

Well Details

Well ID: 34-153-23169
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Akron City
Operator Name: CARGILL INC
Well Pad ID:
Farm/Lease Name: CITY OF AKRON (SMP #4)
License Status: Active Injection
License Date: 2013-08-20
Spud Date: 2014-01-02
Spud Drilling Contractor: DALLAS MORRIS
Final Drill Date: 2014-01-16
Well Total Depth: 3107 ft
Configuration: Vertical
Latitude: 41.018612842
Longitude: -81.56112989

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-08-20 Proposed Formations:SALINA, Issued Date:8/20/2013, Expired Date:8/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
Reached Total Depth 2014-01-16
Last Compliance Report 2014-01-30
Completion Report Received 2014-05-05
Construction Permit Expires 2014-08-20
Record Last Modified 2017-02-10

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0180841599 2018-07-09 Solution Mining Project No Violations I was on location for a MIT. I met with Carey Morgan with Cargill. The net pressure change for the well was 0.016 psi/hr which is well below the minimum required net pressure change of 0.05 psi/hr. I observed no leaks or spill during the test.
0871804836 2014-01-30 Solution Mining Project No Violations I was on location to observe the Cement Bond Evaluation and pressure testing of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco topped off the 7 casing from the top to eliminate any air entrapment and then tied on to a 2 port on the Pack-Off Sub to catch any Brine displaced by the logging tool and wireline. Permit Construction Conditions require a pressure test to a minimum of 525 psi for a 15 minute duration. Hilco pressured up the 7 casing to 600 psi and isolated the 7casing from the pump truck. After allowing the well to stabilize, the air was bled - off in order to conduct the test. Numerous leaks were noticed around the collar. Repair attempts were performed and the the test moved forward. Hilco pressured up to 600 psi @ 1722 hrs.. Pressure was 590 psi @ 1727 psi. , 583 psi @ 1732 hrs. , 580 psi. @ 1737 hrs.. Total pressure drop was 20 psi through the test. A bad collar contributed to the pressure drop. Since the pressure drop was within the allowable ( 5 % = 30 psi. ) the test is considered successful.
1391095261 2014-01-30 Solution Mining Project No Violations I was on location to observe the Cement Bond Evaluation and pressure test of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco top off the 7 casing with Brine then tied into the casing ( through a 2 port ) to catch any fluid displaced by the logging tools and wireline. Permit Construction Conitions require a preesure test of a minimum of 525 psi held for a 15 minute duration. Hilco pressured up on the casing to 600 psi and isolated the 7 casing from the pump truck. Air was bled out of the system repeatedly and @ 1349Hrs. Hilco pressured up to 600 psi. to start the test. At 1354Hrs. - 600 psi., at 1359 Hrs.- 593 psi., at 1404 Hrs. - 590 psi., test ended at 1408 Hrs. with final pressure reading of 590 psi. A 10 Lbs. pressure drop is within the 5% alowable. Test passed.
1722258280 2016-08-16 Solution Mining Project No Violations There were no violations at the time of inspection.
1925391801 2014-12-05 Preliminary Restoration No Violations The preliminary restoration was complete and meets all requirements.

For data sources see[3]

References