If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Belmont_County,_Ohio|Belmont]] | | County: [[Belmont_County,_Ohio|Belmont]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[York Township,_Belmont_County,_Ohio|York Township]] |
|- | |- | ||
| Operator Name: [[RICE DRILLING D LLC]] | | Operator Name: [[RICE DRILLING D LLC]] |
Well ID: 34-013-20945 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.860877633,"lon":-80.88003877,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: York Township | |
Operator Name: RICE DRILLING D LLC | |
Well Pad ID: US-OH-001271 | |
Farm/Lease Name: BIG DAWG | |
License Status: Final Restoration | |
License Date: 2015-05-08 | |
Spud Date: 2015-08-22 | |
Spud Drilling Contractor: FALCON DRLG | |
Final Drill Date: 2015-09-07 | |
Well Total Depth: 2087 ft | |
Configuration: Vertical | |
Latitude: 39.860877633 | |
Longitude: -80.88003877 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-05-08 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:5/8/2015, Expired Date:5/7/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Reached Total Depth | 2015-09-07 | LOST HOLE WHILE DRILLING 1ST INTERMEDIATE |
Plugged/Abandoned | 2015-09-18 | LOST HOLE WHILE DRILLING 1ST INTERMEDIATE |
Completion Report Received | 2015-09-21 | LOST HOLE WHILE DRILLING 1ST INTERMEDIATE |
Construction Permit Expires | 2017-05-07 | LOST HOLE WHILE DRILLING 1ST INTERMEDIATE |
Record Last Modified | 2017-06-20 | LOST HOLE WHILE DRILLING 1ST INTERMEDIATE |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0008314982 | 2015-08-23 | Casing String Witnessed | No Violations | On this day Express Energy had reached a total depth of 100. The 30 conductor was ran into a 36 open hole and Express Energy was on site to cement the casing with 275 sacks of Class A cement. Cement to surface established. See cement ticket for details. |
0026870252 | 2017-06-14 | Final Restoration | No Violations | The final restoration for this well is complete as the well has been plugged. The restoration for the well site pad disturbance area is required to be remediated once all other wells on this pad are plugged. Final restoration passed. |
0050535611 | 2015-09-18 | Plug / Plug Back | No Violations | On this day the plugging of this well commenced. Halliburton was on site to plug the well with 1666 sacks of Class A neat cement. Cement to surface was established. See plug report for details. |
1597125763 | 2015-09-14 | Drill / Deepen / Reopen | No Violations |
For data sources see[3]