Difference between revisions of "34-013-21141"

m
 
m
Line 11: Line 11:
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
|-
 
|-
| Municipality: [[Richland_Township,_Belmont_County,_Ohio|Richland Township]]
+
| Municipality: [[Richland Township,_Belmont_County,_Ohio|Richland Township]]
 
|-
 
|-
 
| Operator Name: [[XTO ENERGY INC.]]
 
| Operator Name: [[XTO ENERGY INC.]]

Revision as of 08:54, 15 August 2019

Well Details

Well ID: 34-013-21141
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Richland Township
Operator Name: XTO ENERGY INC.
Well Pad ID: US-OH-001193
Farm/Lease Name: KURTH UNIT D
License Status: Producing
License Date: 2016-12-02
Spud Date: 2016-12-03
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2017-01-02
Well Total Depth: 20025 ft
Configuration: Horizontal
Latitude: 40.030240389
Longitude: -80.84205047

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-12-02 Proposed Formations:POINT PLEASANT, Issued Date:12/2/2016, Expired Date:12/2/2018 12:00:00 PM, Drilling unit acres:627.759, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-01-02 CHANGED STATUS PER PRODUCTION REPORT - 3RD QTR, 2017
Correction to Well 2017-02-10 UPDATE TARGET/TAKEPOINT PER AS DRILLED PLAT-ALE 02/08/2017
Completion Report Received 2017-10-26 CHANGED STATUS PER PRODUCTION REPORT - 3RD QTR, 2017
Construction Permit Expires 2017-12-02 CHANGED STATUS PER PRODUCTION REPORT - 3RD QTR, 2017
Record Last Modified 2017-12-28 CHANGED STATUS PER PRODUCTION REPORT - 3RD QTR, 2017

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-12-27 10686 10784 48
2017-12-27 19596 19694 48

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/18/2017 06/21/2017 10032 23,440,300.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-3 C&J Well Services Acid Corrosion Inhibitors Listed Below
GA-7F C&J Well Services Gelling Agents Listed Below
Water XTO Energy/ExxonMobil Carrier Fluid Water 7732-18-5 100 88.7046 0
BIO-CLEAR 2000 C&J Well Services Biocides Listed Below
Sand C&J Well Services Sand - Bulk - Pennsylvania Listed Below
FR-16 C&J Well Services Friction Reducer Listed Below
HC-15 C&J Well Services Bulk Acid Listed Below
Proprietary Proprietary 100 0 0
Titanium Oxide 13463-67-7 0.1 0.005931 0
Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-, mono-C10-14-alkyl esthers, phosphates 68585-36-4 3 0.002308 0
1-DECANOL 112-30-1 5 0.00009000 0
Ammonium Persulfate 7727-54-0 100 0 0
1-OCTANOL 111-87-5 2.5 0.00004500 0
Crystalline Silica, quartz 14808-60-7 99.9 5.92467 0
Titanium Oxide 13463-67-7 0.1 0.003112 0
Ethoxylated Alcohols 68002-97-1 100 0.00000200 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 45 0.034615 0
Nonyphenol (branched), ethoxylated 127087-87-0 5 0.00009000 0
Surfactant Blend Proprietary 1 0.000769 0
2-Butoxyethanol 111-76-2 15 0.00027 0
Cinnamaldehyde 104-55-2 15 0.00027 0
Choline Chloride ((2-Hydroxyethyl) trimethyl ammonium chloride) 67-48-1 80 0.00002600 0
Isopropyl Alcohol 67-63-0 2.5 0.00004500 0
Ammonium Chloride 12125-02-9 2 0.000355 0
2-Propenamide as residual 79-06-1 0.1 0.00007700 0
Monoethanolamine hydrochloride 2002-24-6 2 0.000355 0
Dimethylformamide 68-12-2 20 0.00036 0
Water 7732-18-5 31 0.023846 0
Ethylene Glycol 107-21-1 40 0.000721 0
Triethyl Phosphate 78-40-0 2.5 0.00004500 0
Aluminum Oxide 1344-28-1 1.1 0.065237 0
Iron Oxide 1309-37-1 0.1 0.001149 0
Bentonite Clay 68953-58-2 5 0.00000200 0
Copolymer Proprietary 35 0.026923 0
Surfactant Blend Proprietary 3 0.002308 0
Crystalline Silica, quartz 14808-60-7 99.9 1.1478 0
Guar Gum 9000-30-0 60 0.00002400 0
Phosphonic Acid Salt Proprietary 6 0.001065 0
Methanol 67-56-1 1 0.000177 0
Aluminum Oxide 1344-28-1 1.1 0.012638 0
Hydrochloric Acid 7647-01-0 15 0.148183 0
Titanium Oxide 13463-67-7 0.1 0.001149 0
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) 10222-01-2 30 0.005935 0
Aluminum Oxide 1344-28-1 1.1 0.034228 0
Iron Oxide 1309-37-1 0.1 0.003112 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 15 0.00027 0
Iron Oxide 1309-37-1 0.1 0.005931 0
Crystalline Silica, quartz 14808-60-7 99.9 3.10856 0
Ethylene Glycol 107-21-1 5 0.003846 0
Water 7732-18-5 96 0.017032 0
Water 7732-18-5 100 0.00003300 0
CJENERGY-Hydrocarbon-00013 64742-47-8 60 0.00002400 0
Alcohols, C12-18, ethoxylated propoxylated 69227-21-0 2 0.001538 0
Water 7732-18-5 85 0.839703 0
CS-3 C&J Well Services Clay Control Additives Listed Below
SI-6 C&J Well Services Paraffin & Scale Additives Listed Below
BR-1 C&J Well Services Gel Breakers Listed Below

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-06-21 H2O 15 385886 Gal 406740 C&J Energy Services STAGE 56/56

STAGE 2-55 SEE IMAGES

2017-05-18 H2O 15 402408 Gal 408340 C&J Energy Services STAGE 1/56

STAGES 2-55 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 XTO ENERGY INC. 1383676 0 150
2018 XTO ENERGY INC. 4739965 0 365
2019 XTO ENERGY INC. 604848 0 78

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 XTO ENERGY INC. Brine 16612 150
2018 XTO ENERGY INC. Brine 58273 365
2019 XTO ENERGY INC. Brine 7744 78

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0253661514 2018-04-24 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with 5.5 inch diameter production casing and was open flowing with valves in the open position. Annular pressure monitoring was in place but had no digital readouts available for reference. Production equipment included a sand trap, a Gas Processing unit, line heater, and 6- 400 barrel purge tanks shared with 3401320915, 3401320914, 3401321147. Roustabout crew was currently on location and installing lines for annular pressure release. Identification tags were present, and production was up to date.
0257829844 2018-08-23 Production Wells No Violations On the day of my inspection I witnessed that the well was currently using flow back equipment including a sand trap and choke manifold system, the sand trap was connected to 3 500-barrel mobile fluid storage tanks. The well head was equipped with 5.5-inch diameter production casing and was open flowing through a manual master valve. Annular pressure monitoring was in place but had no digital readouts available for reference, there were annular pressure bleed down lines on both the 9.625-inch diameter casing, and 13.375-inch diameter casing, at the time of my inspection the 9.625-inch diameter casing valve was closed, and the 13.375-inch diameter casing valve was open. Production equipment included a gas processing unit and 6 400-barrel production fluid tanks that were shared with the other wells on the pad. There was secondary containment around the production fluid tanks and gas processing units. Identification tags were present, and production reports were current.
1372845110 2019-03-25 UrbanProduction Wells No Violations Status check inspection found a 3rd party contractor identified as Shale Pro on location and currently on site installing the production tree assembly on the well head B section. The company man on site identified as Tracy Vanscoy indicated the company recently had 2.875 production tubing installed on all 4 wells on the pad. The wells were previously produced through the 5.5 production casing. Production equipment on site includes a production facility consisting of (6) 500 barrel steel tanks situated inside a polymer lined steel containment dike area. Also present is (4) gas processing units. Proper well identification is posted at the well pad entry point and tank battery, once the well heads are assembled the identification will be put back up on the wells. The lease road and well pad surface is stone construction and in good repair, no earthen berm is present. Also noted on 11/03/2016 the said Company XTO Energy submitted a waiver to the Division asking for a variance pertaining to fencing, screening and landscaping, the language pertaining to the waiver is found in OAC 1501:9-9-05.
1397923396 2016-12-16 Casing String Witnessed No Violations


2067799299 2017-08-23 Production Wells No Violations This well is equipped with flow-back mechanics. There is a sand separator and 500 barrel tanks on location. The company was working on production equipment as well. Once flow-back is completed the well will be put in to commerical production.

For data sources see[10]