If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21141 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.03,"lon":-80.84,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Richland Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-001193 | |
Farm/Lease Name: KURTH UNIT D | |
License Status: Producing | |
License Date: 2016-12-02 | |
Spud Date: 2016-12-03 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2017-01-02 | |
Well Total Depth: 20025.00 ft | |
Configuration: Horizontal | |
Latitude: 40.030000 | |
Longitude: -80.840000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-12-02 | Proposed Formations:POINT PLEASANT, Issued Date:12/2/2016, Expired Date:12/2/2018 12:00:00 PM, Drilling unit acres:627.759, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-01-02 | CHANGED STATUS PER PRODUCTION REPORT - 3RD QTR, 2017 |
Correction to Well | 2017-02-10 | UPDATE TARGET/TAKEPOINT PER AS DRILLED PLAT-ALE 02/08/2017 |
Completion Report Received | 2017-10-26 | CHANGED STATUS PER PRODUCTION REPORT - 3RD QTR, 2017 |
Construction Permit Expires | 2017-12-02 | CHANGED STATUS PER PRODUCTION REPORT - 3RD QTR, 2017 |
Record Last Modified | 2017-12-28 | CHANGED STATUS PER PRODUCTION REPORT - 3RD QTR, 2017 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-12-27 | 10686 | 10784 | 48 |
2017-12-27 | 19596 | 19694 | 48 |
19596 | 19694 | 48 | |
10686 | 10784 | 48 | |
10686 | 10784 | 48 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/18/2017 | 06/21/2017 | 10032 | 23,440,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CI-3 | C&J Well Services | Acid Corrosion Inhibitors | Listed Below | ||||
GA-7F | C&J Well Services | Gelling Agents | Listed Below | |||||
Water | XTO Energy/ExxonMobil | Carrier Fluid | Water | 7732-18-5 | 100 | 88.7046 | 0 | |
BIO-CLEAR 2000 | C&J Well Services | Biocides | Listed Below | |||||
Sand | C&J Well Services | Sand - Bulk - Pennsylvania | Listed Below | |||||
FR-16 | C&J Well Services | Friction Reducer | Listed Below | |||||
HC-15 | C&J Well Services | Bulk Acid | Listed Below | |||||
Proprietary | Proprietary | 100 | 0 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.005931 | 0 | ||||
Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-,
mono-C10-14-alkyl esthers, phosphates |
68585-36-4 | 3 | 0.002308 | 0 | ||||
1-DECANOL | 112-30-1 | 5 | 0.00009000 | 0 | ||||
Ammonium Persulfate | 7727-54-0 | 100 | 0 | 0 | ||||
1-OCTANOL | 111-87-5 | 2.5 | 0.00004500 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 5.92467 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.003112 | 0 | ||||
Ethoxylated Alcohols | 68002-97-1 | 100 | 0.00000200 | 0 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 45 | 0.034615 | 0 | ||||
Nonyphenol (branched), ethoxylated | 127087-87-0 | 5 | 0.00009000 | 0 | ||||
Surfactant Blend | Proprietary | 1 | 0.000769 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 15 | 0.00027 | 0 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.00027 | 0 | ||||
Choline Chloride ((2-Hydroxyethyl)
trimethyl ammonium chloride) |
67-48-1 | 80 | 0.00002600 | 0 | ||||
Isopropyl Alcohol | 67-63-0 | 2.5 | 0.00004500 | 0 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.000355 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.00007700 | 0 | ||||
Monoethanolamine hydrochloride | 2002-24-6 | 2 | 0.000355 | 0 | ||||
Dimethylformamide | 68-12-2 | 20 | 0.00036 | 0 | ||||
Water | 7732-18-5 | 31 | 0.023846 | 0 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000721 | 0 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.00004500 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.065237 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.001149 | 0 | ||||
Bentonite Clay | 68953-58-2 | 5 | 0.00000200 | 0 | ||||
Copolymer | Proprietary | 35 | 0.026923 | 0 | ||||
Surfactant Blend | Proprietary | 3 | 0.002308 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 1.1478 | 0 | ||||
Guar Gum | 9000-30-0 | 60 | 0.00002400 | 0 | ||||
Phosphonic Acid Salt | Proprietary | 6 | 0.001065 | 0 | ||||
Methanol | 67-56-1 | 1 | 0.000177 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.012638 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.148183 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.001149 | 0 | ||||
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 30 | 0.005935 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.034228 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.003112 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 15 | 0.00027 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.005931 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 3.10856 | 0 | ||||
Ethylene Glycol | 107-21-1 | 5 | 0.003846 | 0 | ||||
Water | 7732-18-5 | 96 | 0.017032 | 0 | ||||
Water | 7732-18-5 | 100 | 0.00003300 | 0 | ||||
CJENERGY-Hydrocarbon-00013 | 64742-47-8 | 60 | 0.00002400 | 0 | ||||
Alcohols, C12-18, ethoxylated propoxylated | 69227-21-0 | 2 | 0.001538 | 0 | ||||
Water | 7732-18-5 | 85 | 0.839703 | 0 | ||||
CS-3 | C&J Well Services | Clay Control Additives | Listed Below | |||||
SI-6 | C&J Well Services | Paraffin & Scale Additives | Listed Below | |||||
BR-1 | C&J Well Services | Gel Breakers | Listed Below |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-06-21 | H2O | 15 | 385886 Gal | 406740 | C&J Energy Services | STAGE 56/56
STAGE 2-55 SEE IMAGES |
2017-05-18 | H2O | 15 | 402408 Gal | 408340 | C&J Energy Services | STAGE 1/56
STAGES 2-55 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | XTO ENERGY INC. | 1383676 | 0 | 150 |
2018 | XTO ENERGY INC. | 4739965 | 0 | 365 |
2019 | XTO ENERGY INC. | 604848 | 0 | 78 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | XTO ENERGY INC. | Brine | 16612 | 150 |
2018 | XTO ENERGY INC. | Brine | 58273 | 365 |
2019 | XTO ENERGY INC. | Brine | 7744 | 78 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1397923396 | 2016-12-16 0:00 | CS | No Violations | 5.00 |
-1943514260 | 2019-9-9 0:00:0 | PW | No Violations | 0.20 |
-2067799299 | 2017-8-23 0:00: | PW | No Violations | 0.50 |
-253661514 | 2018-4-24 0:00: | PW | No Violations | 0.50 |
0253661514 | 2018-04-24 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 5.5 inch diameter production casing and was open flowing with valves in the open position. Annular pressure monitoring was in place but had no digital readouts available for reference. Production equipment included a sand trap, a Gas Processing unit, line heater, and 6- 400 barrel purge tanks shared with 3401320915, 3401320914, 3401321147. Roustabout crew was currently on location and installing lines for annular pressure release. Identification tags were present, and production was up to date. |
0257829844 | 2018-08-23 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was currently using flow back equipment including a sand trap and choke manifold system, the sand trap was connected to 3 500-barrel mobile fluid storage tanks. The well head was equipped with 5.5-inch diameter production casing and was open flowing through a manual master valve. Annular pressure monitoring was in place but had no digital readouts available for reference, there were annular pressure bleed down lines on both the 9.625-inch diameter casing, and 13.375-inch diameter casing, at the time of my inspection the 9.625-inch diameter casing valve was closed, and the 13.375-inch diameter casing valve was open. Production equipment included a gas processing unit and 6 400-barrel production fluid tanks that were shared with the other wells on the pad. There was secondary containment around the production fluid tanks and gas processing units. Identification tags were present, and production reports were current. |
1372845110 | 2019-03-25 | UrbanProduction Wells | No Violations | Status check inspection found a 3rd party contractor identified as Shale Pro on location and currently on site installing the production tree assembly on the well head B section. The company man on site identified as Tracy Vanscoy indicated the company recently had 2.875 production tubing installed on all 4 wells on the pad. The wells were previously produced through the 5.5 production casing. Production equipment on site includes a production facility consisting of (6) 500 barrel steel tanks situated inside a polymer lined steel containment dike area. Also present is (4) gas processing units. Proper well identification is posted at the well pad entry point and tank battery, once the well heads are assembled the identification will be put back up on the wells. The lease road and well pad surface is stone construction and in good repair, no earthen berm is present. Also noted on 11/03/2016 the said Company XTO Energy submitted a waiver to the Division asking for a variance pertaining to fencing, screening and landscaping, the language pertaining to the waiver is found in OAC 1501:9-9-05. |
1397923396 | 2016-12-16 | Casing String Witnessed | No Violations
| |
1536729267 | 2020-3-4 0:00:0 | PW | No Violations | 0.20 |
2067799299 | 2017-08-23 | Production Wells | No Violations | This well is equipped with flow-back mechanics. There is a sand separator and 500 barrel tanks on location. The company was working on production equipment as well. Once flow-back is completed the well will be put in to commerical production. |
257829844 | 2018-8-23 0:00: | PW | No Violations | 0.80 |
For data sources see[10]