X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-013-21196"

m
 
m
Line 11: Line 11:
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
|-
 
|-
| Municipality: [[Smith_Township,_Belmont_County,_Ohio|Smith Township]]
+
| Municipality: [[Smith Township,_Belmont_County,_Ohio|Smith Township]]
 
|-
 
|-
 
| Operator Name: [[RICE DRILLING D LLC]]
 
| Operator Name: [[RICE DRILLING D LLC]]

Revision as of 09:00, 15 August 2019

Well Details

Well ID: 34-013-21196
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Smith Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001457
Farm/Lease Name: KING KRUNCH
License Status: Producing
License Date: 2017-03-29
Spud Date: 2017-06-28
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-11-02
Well Total Depth: 18624 ft
Configuration: Horizontal
Latitude: 39.953060341
Longitude: -80.92164789

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-03-07 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:3/7/2017, Expired Date:3/7/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-03-29 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/29/2017, Expired Date:3/29/2019 12:00:00 PM, Drilling unit acres:594.1514, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-11-02
Correction to Well 2017-12-29 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-08-28
Record Last Modified 2018-08-31
Construction Permit Expires 2019-03-29

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-08-30 9991 10173 0
2018-08-30 18291 18473 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/13/2018 05/07/2018 9851.08 20,575,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Group Proppant Listed Below
Hydrochloric Acid Keane Group Acidizing Listed Below
KAI-12 Keane Group Acid inhibitor Listed Below
Water Keane Group Carrier/Base Fluid Water 7732-18-5 100 86.6349 171,702,000.0
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00001550 30.718
Solvent naphtha (petroleum) heavy aliph 64742-96-7 60 0.00001061 21.029
Oleic acid diethanolamide 93-83-4 2 0.001361 2697.37
Ethylbenzene 100-41-4 1 0.00000310 6.144
Xylene 1330-20-7 5 0.00001550 30.718
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.01361 26973.7
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.001361 2697.37
Fatty imidazoline 61790-69-0 5 0.00001550 30.718
Guar gum 9000-30-0 60 0.00001061 21.029
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.01361 26973.7
Trade Secret Proprietary 10 0.00000177 3.505
Sodium hypochlorite 7681-52-9 16 0.00254704 5047.98
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.001361 2697.37
Sodium hydroxide 1310-73-2 5 0.000795949 1577.49
Methanol 67-56-1 30 0.00629897 12484
Trade Secret Proprietary 10 0.00000177 3.505
Copolymer of 2-propenamide 69418-26-4 20 0.01361 26973.7
Prop-2-yn-1-ol 107-19-7 5 0.00001550 30.718
Silica Substrate 14808-60-7 100 13.0358 25,835,700.0
Solvent naphtha (petroleum) heavy aliph 64742-96-7 60 0.00001061 21.029
Methanol 67-56-1 30 0.00629897 12484
Sodium hydroxide 1310-73-2 5 0.000795949 1577.49
Ethylbenzene 100-41-4 1 0.00000310 6.144
Oleic acid diethanolamide 93-83-4 2 0.001361 2697.37
Sodium persulfate 7775-27-1 99 0.00000050 0.99
Hydrochloric Acid 7647-01-0 15 0.0335955 66583.1
Isoproyl alcohol 67-63-0 5 0.00001550 30.718
Copolymer of 2-propenamide 69418-26-4 20 0.01361 26973.7
Sodium hypochlorite 7681-52-9 16 0.00254704 5047.98
Methanol 67-56-1 90 0.000278986 552.923
Sodium persulfate 7775-27-1 99 0.00000050 0.99
Guar gum 9000-30-0 60 0.00001061 21.029
KFR-23 Keane Group Friction reducer Listed Below
Sodium Hypochlorite Dirk Thomas Solutions Biocide Listed Below
KSI-19 Keane Group Scale inhibitor Listed Below
KWG-111L Keane Group Gelling agent Water 7732-18-5 50 0.034025 67434.3
Water 7732-18-5 89.7 0.0142793 28300.2
KWBO-2 Keane Group Breaker Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 89.7 0.0142793 28300.2
Water 7732-18-5 50 0.034025 67434.3

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-04-13 H2O 15 4419 Bbl 196000 Keane Frac STAGE 1/44

STAGES 2-43 SEE IMAGES

2018-05-07 H2O 15 10934 Bbl 604000 Keane Frac STAGE 44/44

STAGES 2-43 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 RICE DRILLING D LLC 2245961 0 153
2019 RICE DRILLING D LLC 1503577 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 RICE DRILLING D LLC Brine 65477 153
2019 RICE DRILLING D LLC Brine 28676 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0561370362 2018-06-21 Completion Testing No Violations Status check inspection found a service provider identified as Keane Energy on location with their pressure pumping units (17 total) along with 2 pump down trucks and a wireline truck. The said well has a total of 44 stages stimulated. The well head completion stack is owned by Cactus and consists of a lower master valve followed by a hydrologic master valve then a flow cross with an additional manual master valve atop the flow cross section. Both the 13.375 and 9.625 well head sections have pressure monitoring devices installed.
0843341649 2018-07-11 Completion Testing No Violations

- 3 inch diameter manual valves and an emergency shut in device.

0934843960 2018-07-11 Completion Testing No Violations On site inspection accompanied by ODNR Inspector Ryan Armstrong found the well drilling and stimulation complete. The completion drill out process is complete and the well is awaiting the initial stages of flow back operations. In conversation with the company men on site it was discovered that the 9.625 diameter casing well head section is open and hooked into a choke manifold system with no pressure on the 9.625 section. It was also observed that the 13.375 diameter well head section was not being monitored.
1498672351 2017-06-28 Casing String Witnessed No Violations On site inspection to witness the Conductor casing cement job at 13:15 hours along with Express Energy Conductor Drilling rig and Express Energy Cement Service. Express Energys conductor rig has drilled a 36 diameter borehole to a measured depth of 100 from ground level with fresh water encountered at 80 from a coal seam. The rig then inserted 100 of 32 diameter .375 wall casing into the borehole. The casing was cemented with 57 barrels of cement consisting of 275 sacks of class A cement with 2% calcium and .50 pound per sack loss circulation material. Cement calculations were for annular capacity with 50% excess and no shoe track, the cement weight was verified at 15.6 pound per gallon by weight of scale. The cement was displaced to 90 with 75 barrels of fresh water. Cement returns were witnessed to surface with 1 of cement left inside the cellar floor to create a liquid tight seal.
1509546083 2017-11-01 Drill / Deepen / Reopen No Violations On the date of my inspection I found Patterson rig 296 currently running their 5.5 inch production casing at approximately 16700 feet. Rice Energy expects to be cementing this string this evening. They will then be moving the rig to a different pad. The containment around the two chemical storage areas have multiple tears and punctures. The Rice Energy company man indicated that they have a contractor scheduled to come out on 11/2/17 to work on their containment. All of the chemicals were within containment. The pad is surrounded by an earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking.
1910642569 2017-08-01 Casing String Witnessed No Violations On location to witness the cementing of the surface casing. The rig ran 20 casing and all the required float equipment to 503. O-Tex Pumping cemented it with 770 sacks of Class H cement. Good cement was returned to the surface, the pressure test of the casing passed. See the casing ticket for the details.
1915247987 2019-03-28 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.72 with the area affected by the well site construction restored, vegetation is established and erosion control is in place. The well pad surface and approach is stone construction and in good repair. 5 wells are present on the pad and in production, all wells are selling off the 5.5 production casing through (2) primary master valves with emergency shut downs in the production outlet flow line. The wells are selling through sand trap separators with a temporary choke system attached to the sand trap separator. The sand trap separators are being evacuated into a single 500 barrel steel horizontal tank set in polymer containment. Permanent production equipment includes (5) gas processing units along with a production facility consisting of (6) steel 400 barrel tanks set inside a polymer lined steel containment dike area. Also present is a 3rd party mid stream facility.

For data sources see[10]

References