If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21196 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.95,"lon":-80.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Smith Township | |
Operator Name: RICE DRILLING D LLC | |
Well Pad ID: US-OH-001457 | |
Farm/Lease Name: KING KRUNCH | |
License Status: Producing | |
License Date: 2017-03-29 | |
Spud Date: 2017-06-28 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2017-11-02 | |
Well Total Depth: 18624.00 ft | |
Configuration: Horizontal | |
Latitude: 39.950000 | |
Longitude: -80.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-03-07 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:3/7/2017, Expired Date:3/7/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-03-29 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/29/2017, Expired Date:3/29/2019 12:00:00 PM, Drilling unit acres:594.1514, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-11-02 | |
Correction to Well | 2017-12-29 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-08-28 | |
Record Last Modified | 2018-08-31 | |
Construction Permit Expires | 2019-03-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-08-30 | 9991 | 10173 | 0 |
2018-08-30 | 18291 | 18473 | 0 |
18291 | 18473 | 0 | |
9991 | 10173 | 0 | |
9991 | 10173 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/13/2018 | 05/07/2018 | 9851.08 | 20,575,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Keane Group | Proppant | Listed Below | ||||
Hydrochloric Acid | Keane Group | Acidizing | Listed Below | |||||
KAI-12 | Keane Group | Acid inhibitor | Listed Below | |||||
Water | Keane Group | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.6349 | 171,702,000.0 | |
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00001550 | 30.718 | ||||
Solvent naphtha (petroleum) heavy aliph | 64742-96-7 | 60 | 0.00001061 | 21.029 | ||||
Oleic acid diethanolamide | 93-83-4 | 2 | 0.001361 | 2697.37 | ||||
Ethylbenzene | 100-41-4 | 1 | 0.00000310 | 6.144 | ||||
Xylene | 1330-20-7 | 5 | 0.00001550 | 30.718 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.01361 | 26973.7 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.001361 | 2697.37 | ||||
Fatty imidazoline | 61790-69-0 | 5 | 0.00001550 | 30.718 | ||||
Guar gum | 9000-30-0 | 60 | 0.00001061 | 21.029 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.01361 | 26973.7 | ||||
Trade Secret | Proprietary | 10 | 0.00000177 | 3.505 | ||||
Sodium hypochlorite | 7681-52-9 | 16 | 0.00254704 | 5047.98 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.001361 | 2697.37 | ||||
Sodium hydroxide | 1310-73-2 | 5 | 0.000795949 | 1577.49 | ||||
Methanol | 67-56-1 | 30 | 0.00629897 | 12484 | ||||
Trade Secret | Proprietary | 10 | 0.00000177 | 3.505 | ||||
Copolymer of 2-propenamide | 69418-26-4 | 20 | 0.01361 | 26973.7 | ||||
Prop-2-yn-1-ol | 107-19-7 | 5 | 0.00001550 | 30.718 | ||||
Silica Substrate | 14808-60-7 | 100 | 13.0358 | 25,835,700.0 | ||||
Solvent naphtha (petroleum) heavy aliph | 64742-96-7 | 60 | 0.00001061 | 21.029 | ||||
Methanol | 67-56-1 | 30 | 0.00629897 | 12484 | ||||
Sodium hydroxide | 1310-73-2 | 5 | 0.000795949 | 1577.49 | ||||
Ethylbenzene | 100-41-4 | 1 | 0.00000310 | 6.144 | ||||
Oleic acid diethanolamide | 93-83-4 | 2 | 0.001361 | 2697.37 | ||||
Sodium persulfate | 7775-27-1 | 99 | 0.00000050 | 0.99 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0335955 | 66583.1 | ||||
Isoproyl alcohol | 67-63-0 | 5 | 0.00001550 | 30.718 | ||||
Copolymer of 2-propenamide | 69418-26-4 | 20 | 0.01361 | 26973.7 | ||||
Sodium hypochlorite | 7681-52-9 | 16 | 0.00254704 | 5047.98 | ||||
Methanol | 67-56-1 | 90 | 0.000278986 | 552.923 | ||||
Sodium persulfate | 7775-27-1 | 99 | 0.00000050 | 0.99 | ||||
Guar gum | 9000-30-0 | 60 | 0.00001061 | 21.029 | ||||
KFR-23 | Keane Group | Friction reducer | Listed Below | |||||
Sodium Hypochlorite | Dirk Thomas Solutions | Biocide | Listed Below | |||||
KSI-19 | Keane Group | Scale inhibitor | Listed Below | |||||
KWG-111L | Keane Group | Gelling agent | Water | 7732-18-5 | 50 | 0.034025 | 67434.3 | |
Water | 7732-18-5 | 89.7 | 0.0142793 | 28300.2 | ||||
KWBO-2 | Keane Group | Breaker | Listed Below | |||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 89.7 | 0.0142793 | 28300.2 | |
Water | 7732-18-5 | 50 | 0.034025 | 67434.3 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-04-13 | H2O | 15 | 4419 Bbl | 196000 | Keane Frac | STAGE 1/44
STAGES 2-43 SEE IMAGES |
2018-05-07 | H2O | 15 | 10934 Bbl | 604000 | Keane Frac | STAGE 44/44
STAGES 2-43 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | RICE DRILLING D LLC | 2245961 | 0 | 153 |
2019 | RICE DRILLING D LLC | 1503577 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | RICE DRILLING D LLC | Brine | 65477 | 153 |
2019 | RICE DRILLING D LLC | Brine | 28676 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-561370362 | 2018-6-21 0:00: | CT | No Violations | 0.20 |
-934843960 | 2018-7-11 0:00: | CT | No Violations | 0.20 |
0561370362 | 2018-06-21 | Completion Testing | No Violations | Status check inspection found a service provider identified as Keane Energy on location with their pressure pumping units (17 total) along with 2 pump down trucks and a wireline truck. The said well has a total of 44 stages stimulated. The well head completion stack is owned by Cactus and consists of a lower master valve followed by a hydrologic master valve then a flow cross with an additional manual master valve atop the flow cross section. Both the 13.375 and 9.625 well head sections have pressure monitoring devices installed. |
0843341649 | 2018-07-11 | Completion Testing | No Violations
- 3 inch diameter manual valves and an emergency shut in device. | |
0934843960 | 2018-07-11 | Completion Testing | No Violations | On site inspection accompanied by ODNR Inspector Ryan Armstrong found the well drilling and stimulation complete. The completion drill out process is complete and the well is awaiting the initial stages of flow back operations. In conversation with the company men on site it was discovered that the 9.625 diameter casing well head section is open and hooked into a choke manifold system with no pressure on the 9.625 section. It was also observed that the 13.375 diameter well head section was not being monitored. |
1498672351 | 2017-06-28 | Casing String Witnessed | No Violations | On site inspection to witness the Conductor casing cement job at 13:15 hours along with Express Energy Conductor Drilling rig and Express Energy Cement Service. Express Energys conductor rig has drilled a 36 diameter borehole to a measured depth of 100 from ground level with fresh water encountered at 80 from a coal seam. The rig then inserted 100 of 32 diameter .375 wall casing into the borehole. The casing was cemented with 57 barrels of cement consisting of 275 sacks of class A cement with 2% calcium and .50 pound per sack loss circulation material. Cement calculations were for annular capacity with 50% excess and no shoe track, the cement weight was verified at 15.6 pound per gallon by weight of scale. The cement was displaced to 90 with 75 barrels of fresh water. Cement returns were witnessed to surface with 1 of cement left inside the cellar floor to create a liquid tight seal. |
1509546083 | 2017-11-01 | Drill / Deepen / Reopen | No Violations | On the date of my inspection I found Patterson rig 296 currently running their 5.5 inch production casing at approximately 16700 feet. Rice Energy expects to be cementing this string this evening. They will then be moving the rig to a different pad. The containment around the two chemical storage areas have multiple tears and punctures. The Rice Energy company man indicated that they have a contractor scheduled to come out on 11/2/17 to work on their containment. All of the chemicals were within containment. The pad is surrounded by an earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking. |
1910642569 | 2017-08-01 | Casing String Witnessed | No Violations | On location to witness the cementing of the surface casing. The rig ran 20 casing and all the required float equipment to 503. O-Tex Pumping cemented it with 770 sacks of Class H cement. Good cement was returned to the surface, the pressure test of the casing passed. See the casing ticket for the details. |
1915247987 | 2019-03-28 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.72 with the area affected by the well site construction restored, vegetation is established and erosion control is in place. The well pad surface and approach is stone construction and in good repair. 5 wells are present on the pad and in production, all wells are selling off the 5.5 production casing through (2) primary master valves with emergency shut downs in the production outlet flow line. The wells are selling through sand trap separators with a temporary choke system attached to the sand trap separator. The sand trap separators are being evacuated into a single 500 barrel steel horizontal tank set in polymer containment. Permanent production equipment includes (5) gas processing units along with a production facility consisting of (6) steel 400 barrel tanks set inside a polymer lined steel containment dike area. Also present is a 3rd party mid stream facility. |
843341649 | 2018-7-11 0:00: | CT | No Violations | 0.50 |
For data sources see[10]