If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Guernsey_County,_Ohio|Guernsey]] | | County: [[Guernsey_County,_Ohio|Guernsey]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Oxford Township,_Guernsey_County,_Ohio|Oxford Township]] |
|- | |- | ||
| Operator Name: [[ECLIPSE RESOURCES I LP]] | | Operator Name: [[ECLIPSE RESOURCES I LP]] | ||
Line 33: | Line 33: | ||
| Configuration: Horizontal | | Configuration: Horizontal | ||
|- | |- | ||
− | | Latitude: | + | | Latitude: <Latitude> |
|- | |- | ||
| Longitude: -81.26497078 | | Longitude: -81.26497078 |
Well ID: 34-059-24384 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.053908751,"lon":-81.26497078,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Oxford Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001064 | |
Farm/Lease Name: WEEKENDER | |
License Status: Producing | |
License Date: 2014-07-11 | |
Spud Date: 2014-06-23 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-09-24 | |
Well Total Depth: 15304 ft | |
Configuration: Horizontal | |
Latitude: <Latitude> | |
Longitude: -81.26497078 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-06-06 | Proposed Formations:TRENTON, Issued Date:6/6/2014, Expired Date:6/5/2016 12:00:00 PM, Drilling unit acres:650.448, Proposed Well Type:ST, Proposed Well Class:STRT |
Reached Total Depth | 2014-09-24 | |
Correction to Well | 2014-12-05 | CHANGE IN PERMIT TYPE AND PERMIT NUMBER PER INSPECTOR. |
Correction to Well | 2015-12-11 | UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-05-22 | |
Construction Permit Expires | 2016-07-10 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/04/2015 | 06/04/2015 | 8104 | 9,139,970.0 | 115500 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HYDROCHLORIC ACID | Halliburton | Base Fluid | NA | NA | 0 | 0 | 0 |
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 88.1357 | 76,135,700.0 | |
BC-140, FR-76, OPTIFLO-HTE, SAND-COMMON WHITE-100 MESH
SSA-2 BULK (100003676), SAND-PREMIUM WHITE-40/70 BULK, SP BREAKER, WG-36 GELLING AGENT |
Halliburton | Breaker, Crosslinker, Friction Reducer, Gelling Agent, Proppant | NA | NA | 0 | 0 | 0 | |
Hazardous and Non-Hazardous Ingredients | C.I. Pigment Red 5 | 6410-41-9 | 1 | 0.00000680 | 6 | |||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0324793 | 28058 | ||||
Guar gum | 9000-30-0 | 100 | 0.0677487 | 58525 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00223165 | 1928 | ||||
Acrylamide acrylate polymer | Confidential | 30 | 0.0324793 | 28058 | ||||
Hydrochloric acid | 7647-01-0 | 60 | 0.787784 | 680524 | ||||
Dazomet | 533-74-4 | 24 | 0.00703532 | 6078 | ||||
Surfactant mixture | Confidential | 1 | 0.00135497 | 1172 | ||||
Enzyme | Confidential | 5 | 0.00003402 | 30 | ||||
Crystalline Silica, Quartz | 14808-60-7 | 0.1 | 0.00006775 | 59 | ||||
Organic phosphate | 71050-62-9 | 25 | 0.00337367 | 2915 | ||||
Silica gel | 112926-00-8 | 1 | 0.000677487 | 586 | ||||
Walnut hulls | NA | 100 | 0.00068033 | 588 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.00206634 | 1785 | ||||
Monoethanolamine borate | 26038-87-9 | 60 | 0.00413268 | 3570 | ||||
Sodium chloride | 7647-14-5 | 30 | 0.0324793 | 28058 | ||||
Bentonite, benzyl(hydrogenated tallow alkyl) dimethylammonium stearate complex | 121888-68-4 | 5 | 0.00338743 | 2927 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.3229 | 8,917,380.0 | ||||
Cured acrylic resin | Confidential | 30 | 0.000210902 | 183 | ||||
Water | 7732-18-5 | 100 | 1.38206 | 1,193,890.0 | ||||
Sodium Hydroxide | 1310-73-2 | 4 | 0.00117255 | 1013 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000223 | 2 | ||||
HP 2220, MB 7530 | One AquaSource | Biocide, Scale Inhibitor | NA | NA | 0 | 0 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-06-03 | H2O | 0 | 330325 Gal | 323000 | Halliburton | Perforations:
7 shots .45inch diameter from 10260-10259 7 shots .45inch diameter from 10214-10213 7 shots .45inch diameter from 10167-10166 7 shots .45inch diameter from 10120-10119 7 shots .45inch diameter from 10073-10071 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ECLIPSE RESOURCES I LP | 295825 | 33557 | 100 |
2016 | ECLIPSE RESOURCES I LP | 781034 | 34962 | 360 |
2017 | ECLIPSE RESOURCES I LP | 398440 | 12836 | 363 |
2018 | ECLIPSE RESOURCES I LP | 275081 | 6024 | 362 |
2019 | ECLIPSE RESOURCES I LP | 58531 | 1070 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ECLIPSE RESOURCES I LP | Brine | 5576 | 100 |
2016 | ECLIPSE RESOURCES I LP | Brine | 11734 | 360 |
2017 | ECLIPSE RESOURCES I LP | Brine | 4260 | 363 |
2018 | ECLIPSE RESOURCES I LP | Brine | 2731 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 532 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0037549249 | 2014-09-24 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Patterson UTI Drilling Rig #328 had ran and cemented their production casing and were preparing to skid the rig to the 6H. |
0147694603 | 2015-04-16 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
1343006105 | 2015-12-23 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Inspector Jim Nicholson I witnessed production equipment included a sand trap, a line heater, a GP Unit along with 2-400bbl purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 1950psi on the tubing and 2050psi on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF. |
1403652435 | 2014-06-24 | Drill / Deepen / Reopen | No Violations | On the day of my inspection, I witnessed Universal Well Service break circulation with fresh water then displace four hundred five sacks of Type-1 cement with a weight of 15.6 and a yield of 1.21 down the well bore to a depth of one hundred foot, I witnessed twenty two barrels of cement returns back to the cellar. |
1407719616 | 2014-08-10 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had drilled a 24inch diameter hole to the depth of 438 feet and ran 442 feet of 18.625 inch 87.5#/ft. J-55 casing 4 feet above KB. The last joint of casing had to be washed down. Halliburton was on site gained circulation while washing casing down with 210bbls fresh water then pumped 25bbls of gel, 10bbls of fresh water and cemented casing with 430 sacks of Class A cement and displaced cement with 122bbls of fresh water. Had good cement returns of 32bbls and cement stayed at surface. |
1526745356 | 2016-06-13 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with 2-400bbl purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the closed position with 1535psi on the tubing and 1540psi on the casing. |
1643058355 | 2017-06-07 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit, a blow case skid and 2-400 barrel purge tanks within containment. The well was equipped with a plunger lift system with valves in the open position with 370 pounds per square inch on the tubing and 530 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF. |
1880294231 | 2014-08-14 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 was drilling a 12.5 inch diameter hole at a depth of 5132 feet with a planned td of 6900 feet. Completed walk around with Eclipse EHS Technician Mike Hartshorn which revealed no violations. |
1947782611 | 2016-11-28 | Production Wells | No Violations | On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit, a blow case skid and 2-400 barrel purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 560 pounds per square inch on the tubing and 740 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF. |
2147467551 | 2015-06-03 | Completion Testing | No Violations | On the day of my inspection I witnessed Halliburton frac stage 22 of 30 with a breakdown pressure of 9256psi, average treating pressure of 7895psi, average rate of 90.1bbls/min with 323000lbs of propant pumped. |
For data sources see[9]